Line 4 (Coimbatore Metro): Difference between revisions

Created by Radhika
Last edited December 4, 2024
Just completed a fresh chapter.
 
adjust page after review
 
Line 1: Line 1:
{{Short description|Transit line in Coimbatore, India}}
#REDIRECT [[Line 2 (Coimbatore Metro)]]
{{Use dmy dates}}
 
{{Use Indian English}}
{{Redirect category shell|
{{Infobox rail line
{{R from move}}
| name            = Green Line
| color            = aced19
| image            =
| image_width      =
| caption          =
| type            = [[Rapid transit]]
| system          = [[Coimbatore Metro]]
| status          = Proposed
| locale          =
| start            = [[Coimbatore Junction railway station|Coimbatore Junction]]
| end              = Valiyampalayam Pirivu
| stations        = 14
| daily_ridership  =
| open            =
| close            =
| owner            =
| operator        =
| character        = 14 km Elevated
| stock            =
| linelength_km    =
| tracklength      =
| tracks          = 2
| gauge            =
| electrification  =
| speed_km/h      = 80
| elevation        =
| map              =
| map_state        =
}}
}}
The '''GreenLine''' or '''Line 4''' is one of the two proposed lines of [[Coimbatore Metro]], Phase 1 Project, the second being the [[Line 1 (Coimbatore Metro)|Red line]] (Line 1). The line stretches from [[Coimbatore Junction railway station|Coimbatore Junction]] to Valiyampalayam Pirivu. The line consists of 14 [[Metro station|station]]s,<ref>{{cite news|title= DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15|url=https://www.thehindu.com/news/cities/Coimbatore/dpr-for-coimbatore-metro-rail-project-to-be-submitted-to-tamil-nadu-government-by-july-15/article67030788.ece|access-date=1 July 2023|newspaper=The Hindu}}</ref><ref>{{cite news|title= CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects|url=https://www.metrorailnews.in/cmrl-submits-detailed-project-reports-for-madurai-and-coimbatore-metro-projects/|access-date=15 July 2023|newspaper=The Metro Rail News}}</ref>.
==Stations==
The stations proposed in the first phase of [[Coimbatore Metro]] in the Line-4 are:<ref>{{cite news|title= 39km Metro Line project in Phase 1|url=https://www.indiaherald.com/Breaking/Read/994605228/-km-Long-Distance-Coimbatore-Metro-Rail-Service-A-to-Z-Overview|access-date=7 July 2023|newspaper=India Herald}}</ref>
{|class="wikitable" style="text-align: center;" width="95%"
|-
!align="center" colspan="9" style="background:#b6e943;" | <span style="color:black;">'''Green Line'''</span>
|-
! rowspan="2"|S.No
! colspan="2"|Station Name
! rowspan="2"|Interchange connection
! rowspan="2"|Places Connected
! rowspan="2"|Layout
! rowspan="2"|Opened
! rowspan="2" |Depot Connection
! rowspan="2" |Depot Layout
|-
! [[English language|English]]||[[Tamil language|Tamil]]
|-
|1||align="center"|Coimbatore Junction||கோயம்புத்தூர் சந்திப்பு||{{color box|Red||rail color}} [[Line 1 (Coimbatore Metro)|Red Line]], {{rint|rail}} [[Coimbatore Junction railway station]]||[[Coimbatore Medical College|Coimbatore Government Hospital]]||Elevated||Proposed Phase 1||None||None
|-
|2||align="center"|Ramnagar||ராம்நகர்||None||None||Elevated||Proposed Phase 1||None||None
|-
|3||align="center"|Gandhipuram Central Bus Terminus||காந்திபுரம் மத்திய பேருந்து நிலையம்||{{rint|bus}} [[Gandhipuram Central Bus Terminus]], {{rint|bus}} [[Gandhipuram Town Bus stand]]||None||Elevated||Proposed Phase 1||None||None
|-
|4||align="center"|Coimbatore Omni Bus Stand||கோயம்புத்தூர் ஆம்னி பேருந்து நிலையம்||{{rint|bus}} [[Coimbatore Omni Bus Terminus]]||None||Elevated||Proposed Phase 1||None||None
|-
|5||align="center"|Moor Market||மூர் மார்க்கெட்||None||None||Elevated||Proposed Phase 1||None||None
|-
|6||align="center"|Ganapathy Pudur||கணபதி புதூர்||None||None||Elevated||Proposed Phase 1||None||None
|-
|7||align="center"|Athipalayam||அத்திபாளையம்||None||None||Elevated||Proposed Phase 1||None||None
|-
|8||align="center"|Ramakrishna Mills||ராமகிருஷ்ணா மில்ஸ்||None||[[Prozone Mall (Coimbatore)|Prozone Mall]]||Elevated||Proposed Phase 1||None||None
|-
|9||align="center"|Vinayagapuram||விநாயகபுரம்||None||None||Elevated||Proposed Phase 1||None||None
|-
|10||align="center"|Chithra Nagar||சித்ரா நகர்||None||None||Elevated||Proposed Phase 1||None||None
|-
|11||align="center"|Saravanampatti||சரவணம்பட்டி||None||None||Elevated||Proposed Phase 1||None||None
|-
|12||align="center"|Viswasapuram||விஸ்வாசபுரம்||None||None||Elevated||Proposed Phase 1||None||None
|-
|13||align="center"|VGP Nagar||விஜிபி நகர்||None||None||Elevated||Proposed Phase 1||None||None
|-
|14||align="center"|Valiyampalayam Pirivu||வலியம்பாளையம் பிரிவு||None||None||Elevated||Proposed Phase 1||None||None
|}
==See also==
* [[Line 1 (Coimbatore Metro)]]
* [[Coimbatore Metro]]
* [[Transport in Coimbatore]]
* [[Rapid transit in India|List of rapid transit systems in India]]
* [[List of metro systems]]
==References==
{{Reflist}}
{{Rapid transit in India}}
{{Railways in Southern India}}
{{coord missing|Tamil Nadu}}
[[Category:Transport in Coimbatore]]
[[Category:Standard gauge railways in India]]
[[Category:Proposed rapid transit in India]]
[[Category:Proposed infrastructure in Tamil Nadu]]

Latest revision as of 09:15, 4 December 2024