robot: Create/update articles. If there is a mistake please report on my talk page. |
updated page |
||
| Line 1: | Line 1: | ||
{{short description|Indian Navy amphibious warfare vessel}} | |||
{{Use dmy dates|date=July 2019}} | {{Use dmy dates|date=July 2019}} | ||
{{Use Indian English|date=July 2019}} | {{Use Indian English|date=July 2019}} | ||
{|{{Infobox ship | {{Infobox ship | ||
|section1={{Infobox ship/image | |||
| image = The INS Airavat sails out of Visakhapatnam harbour after commissioning on May 19, 2009.jpg | |||
| image_caption = INS ''Airavat'' (L24) sails out of Visakhapatnam harbour after commissioning | |||
}} | |||
|section2={{Infobox ship/class overview | |||
| name = ''Shardul'' class | |||
| builders = [[Garden Reach Shipbuilders and Engineers]] | |||
| operators = {{navy|IND}} | |||
| class_before = {{sclass|Magar|amphibious warfare vessel|4}} | |||
| class_after = | |||
| subclasses = | |||
| cost = | |||
| built_range = | |||
| in_service_range = | |||
| in_commission_range = | |||
| total_ships_building = | |||
| total_ships_planned = | |||
| total_ships_completed = 3 | |||
| total_ships_canceled = | |||
| total_ships_active = 3 | |||
| total_ships_laid_up = | |||
| total_ships_lost = | |||
| total_ships_retired = | |||
| total_ships_preserved = | |||
}} | |||
|section3={{Infobox ship/characteristics | |||
| hide_header = | |||
| header_caption = | |||
| type = [[Tank landing ship]] | |||
| displacement = 5,650 tons | |||
| length = {{convert|125|m|abbr=on}} | |||
| beam = {{convert|17.5|m|abbr=on}} | |||
| height = | |||
| draught = {{convert|4|m|abbr=on}} | |||
| decks = | |||
| deck_clearance = | |||
| ramps = | |||
| power = | |||
| propulsion = [[Kirloskar Group|Kirloskar]] PA6 STC engines | |||
| sail_plan = | |||
| speed = {{convert|16|kn|abbr=on}} | |||
| range = | |||
| endurance = | |||
| test_depth = | |||
| boats = 4 × [[LCVP (United Kingdom)|LCVP]]s | |||
| capacity = *11 [[Main battle tank|MBT]], 10 [[armoured vehicles]] | |||
*{{convert|465.8|m³|abbr=on}} water, {{convert|1,292.6|m³|abbr=on}} diesel fuel | |||
| troops = 500 | |||
| complement = 11 officers, 145 sailors | |||
| crew = | |||
| time_to_activate = | |||
| sensors = | |||
| EW = '''Decoy:''' Chaff launchers | |||
| armament = *2 × WM-18 rocket launchers | |||
*4 × [[CRN 91 Naval Gun|CRN-91]] AA (Naval 30 mm Medak) guns, MANPAD's. | |||
| armour = | |||
| aircraft = 1 Sea King/[[HAL Dhruv]] | |||
| aircraft_facilities = | |||
| notes = | |||
}} | |||
}} | }} | ||
'''''Shardul''-class | '''''Shardul''-class''' ({{Lit|[[Bengal Tiger|Tiger]]}}) landing ships are large [[amphibious warfare vessel]]s built by [[Garden Reach Shipbuilders and Engineers]] for the [[Indian Navy]]. They are an evolution of the {{sclass|Magar|amphibious warfare vessel|0}} amphibious landing ships. Initially, the ship was classified as Landing Ship Tank (Large) or LST(L). The class has an indigenous content of over 90%.<ref name=":0" /> The ships also carry four [[LCVP (United Kingdom)|landing craft vehicle personnel]] (LCVP) on board, which can be used for the landing of troops.<ref name="Operation Samudra Setu">{{cite web |date=2020-05-06 |title=Operation Samudra Setu: Why the Indian Navy chose INS Jalashwa and INS Magar |url=https://www.theweek.in/news/india/2020/05/06/operation-samudra-setu-why-the-indian-navy-chose-ins-jalashwa-and-ins-magar.html |url-status=live |archive-url=https://web.archive.org/web/20241206164147/https://www.theweek.in/news/india/2020/05/06/operation-samudra-setu-why-the-indian-navy-chose-ins-jalashwa-and-ins-magar.html |archive-date=2024-12-06 |access-date=2021-01-03 |website=[[The Week (Indian magazine)|The Week]]}}</ref> | ||
==History== | |||
The order for the vessels were placed in December 2001 while the contract was signed in early 2002.<ref name=":0" /> | |||
The class | The ship is equipped with WM-18 140 mm rocket launchers, developed by [[DRDO]] and manufactured by [[Larsen & Toubro]]. Two units of the system is integrated with one each on [[port and starboard]]. The rocket launcher has 18 tubes in a configuration of 6×3. These are used for beach clearing operations before initiating amphibious operations. The armament also includes four [[CRN 91 naval gun|CRN-91]] autocannons for self-defence.<ref>{{Cite tweet |number=1292731705762045952 |user=DefenceDecode |title=DRDO-L&T Rocket Launcher WM-18: Rocket Launcher WM-18 is used for beach clearing operations by the LST class of ships, before executing amphibious operations. The weapon system comprises 2 launcher mounts, one each for port and starboard... |date=2020-08-10 |access-date=2024-09-22}}</ref><ref>{{Cite tweet |number=1273095546761293824 |user=strategicfront |title=Vietnamese amphibious ships with L&T WM-18 Rocket Launchers . The WM-18 is used for beach clearing operations by the Shardul-class LST of the IN, before executing amphibious operations... |date=2020-06-17 |access-date=2024-09-22}}</ref><ref>{{Cite tweet |number=1397092607977795584 |user=strategicfront |title=L&T's missile systems production plant. L&T works as both the systems integrator & the supplier for many munitions... |date=2021-05-25 |access-date=2024-09-22}}</ref> | ||
''Shardul'' was the first vessel commissioned at Karwar Naval Base, [[INS Kadamba]]. The second ship ''Kesari'' was commissioned at the [[Visakhapatnam]] Naval Base,<ref>{{cite web | url=http://indiannavy.nic.in/pres08b.htm | archive-url=https://web.archive.org/web/20080621070053/http://indiannavy.nic.in/pres08b.htm |archive-date=21 June 2008 | title=INS Kesari Commissioned | date=5 April 2008 |website=Indian Navy | access-date=6 July 2019 }}</ref> and later moved to [[Port Blair]].<ref>{{cite news|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/article1235210.ece |title=Another naval ship heads for Seychelles |work=The Hindu |date=8 May 2009 |access-date=21 February 2015}}</ref> The third ship ''Airavata'' underwent sea trials in 2008 and was commissioned in 2009.<ref>{{cite news|url=http://www.hindu.com/2008/04/08/stories/2008040859740800.htm |archive-url=https://web.archive.org/web/20120429042532/http://www.hindu.com/2008/04/08/stories/2008040859740800.htm |url-status=dead |archive-date=29 April 2012 |title=INS Airavata for basin trials in May |last=Balajj |first=J. |date=8 April 2008 |work=[[The Hindu]] |access-date=21 February 2015}}</ref><ref>{{cite web|url=http://pib.nic.in/release/phsmall.asp?phid=22838 |title=Image of INS Airavat |work=Press Information Bureau |publisher=Government of India |date=19 May 2009 |access-date=21 February 2015}}</ref><ref>{{cite web|url=http://pib.nic.in/release/phsmall.asp?phid=22839 |title=Image during Commissioning ceremony |work=Press Information Bureau |publisher=Government of India |date=19 May 2009 |access-date=21 February 2015}}</ref> | ''Shardul'' was the first vessel commissioned at Karwar Naval Base, [[INS Kadamba]]. The second ship ''Kesari'' was commissioned at the [[Visakhapatnam]] Naval Base,<ref>{{cite web | url=http://indiannavy.nic.in/pres08b.htm | archive-url=https://web.archive.org/web/20080621070053/http://indiannavy.nic.in/pres08b.htm |archive-date=21 June 2008 | title=INS Kesari Commissioned | date=5 April 2008 |website=Indian Navy | access-date=6 July 2019 }}</ref> and later moved to [[Port Blair]].<ref>{{cite news|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/article1235210.ece |title=Another naval ship heads for Seychelles |work=The Hindu |date=8 May 2009 |access-date=21 February 2015}}</ref> The third ship ''Airavata'' underwent sea trials in 2008 and was commissioned in 2009.<ref>{{cite news|url=http://www.hindu.com/2008/04/08/stories/2008040859740800.htm |archive-url=https://web.archive.org/web/20120429042532/http://www.hindu.com/2008/04/08/stories/2008040859740800.htm |url-status=dead |archive-date=29 April 2012 |title=INS Airavata for basin trials in May |last=Balajj |first=J. |date=8 April 2008 |work=[[The Hindu]] |access-date=21 February 2015}}</ref><ref>{{cite web|url=http://pib.nic.in/release/phsmall.asp?phid=22838 |title=Image of INS Airavat |work=Press Information Bureau |publisher=Government of India |date=19 May 2009 |access-date=21 February 2015}}</ref><ref>{{cite web|url=http://pib.nic.in/release/phsmall.asp?phid=22839 |title=Image during Commissioning ceremony |work=Press Information Bureau |publisher=Government of India |date=19 May 2009 |access-date=21 February 2015}}</ref> | ||
== Ships == | == Ships == | ||
{| class=" | {| class="wikitable" | ||
|- | |- | ||
| | ! Name || Pennant Number | ||
| | !Laid down<ref name=":0">{{Cite web |last= |title=Shardul Class |url=https://www.bharat-rakshak.com/navy/equipment/specs/shardul-class/ |access-date=2024-09-22 |language=en-US}}</ref> | ||
| | !Launched<ref name=":0" />||Commissioned|| Status | ||
| | |||
| | |||
|- | |- | ||
| {{INS|Shardul|2004| | ! colspan="7" |{{navy|India}} | ||
|- | |||
| {{INS|Shardul|2004|2}} | |||
| L16 | | L16 | ||
| | |16 December 2002 | ||
| | |3 April 2004 | ||
| 4 January 2007 | | 4 January 2007 | ||
| Active | | rowspan=3|Active | ||
|- | |- | ||
| {{INS|Kesari|2005| | | {{INS|Kesari|2005|2}} | ||
| L15 | | L15 | ||
| | | | ||
|8 June 2005 | |||
| 5 April 2008 | | 5 April 2008 | ||
|- | |- | ||
| {{INS|Airavat|L24| | | {{INS|Airavat|L24|2}} | ||
| L24 | | L24 | ||
| | | | ||
|27 March 2006 | |||
| 19 May 2009 | | 19 May 2009 | ||
|} | |} | ||
== Gallery == | |||
{{Gallery | |||
|width=160 | height=170 | |||
|File:INS Shardul (L16) entering Port Luis, Mauritius.jpg | |||
|{{INS|Shardul|2004|2}} entering [[Port Louis]], [[Mauritius]]. | |||
|File:INS Shardul (L16) of 1st Training squadron en-route to Sri Lanka.jpg | |||
|{{INS|Shardul|2004|2}} of 1st Training squadron en-route to [[Sri Lanka]]. | |||
|File:INS Kesari during Milan 2018 exercise.jpg | |||
|{{INS|Kesari|2005|2}} during [[Milan (naval exercise)|MILAN]] 2018 exercise. | |||
|File:Ships participating in PASSEX during MILAN 2012.jpg | |||
|{{INS|Kesari|2005|2}} participating in PASSEX during [[Milan (naval exercise)|MILAN]] 2012. | |||
|File:The INS Airavat sails out of Visakhapatnam harbour after commissioning on May 19, 2009.jpg | |||
|{{INS|Airavat|L24|2}} sails out of [[Visakhapatnam]] harbor after commissioning on May 19, 2009. | |||
}} | |||
==See also== | ==See also== | ||
| Line 110: | Line 128: | ||
==External links== | ==External links== | ||
{{commons category|Shardul class landing ships}} | {{commons category|Shardul class landing ships}} | ||
*[http://www.bharat-rakshak.com/NAVY/Ships/Active/166-Shardul-Class.html Shardul Class - Bharat Rakshak] | *[http://www.bharat-rakshak.com/NAVY/Ships/Active/166-Shardul-Class.html Shardul Class - Bharat Rakshak] {{Webarchive|url=https://web.archive.org/web/20220228164424/http://www.bharat-rakshak.com/NAVY/Ships/Active/166-Shardul-Class.html |date=28 February 2022 }} | ||
*[https://web.archive.org/web/20070519132507/http://cities.expressindia.com/fullstory.php?newsid=133098 Launch of INS Kesari] | *[https://web.archive.org/web/20070519132507/http://cities.expressindia.com/fullstory.php?newsid=133098 Launch of INS Kesari] | ||
*[http://www.thehindubusinessline.com/2006/11/07/stories/2006110702691000.htm Shardul handed over to Navy] | *[http://www.thehindubusinessline.com/2006/11/07/stories/2006110702691000.htm Shardul handed over to Navy] | ||
*[http://news.webindia123.com/news/articles/India/20061105/498991.html GRSE hands over Shardul to Indian Navy] | *[http://news.webindia123.com/news/articles/India/20061105/498991.html GRSE hands over Shardul to Indian Navy] | ||
{{Shardul-class tank landing ship}} | {{Shardul-class tank landing ship}} | ||
Latest revision as of 23:14, 27 February 2026
Shardul-class (lit. 'Tiger') landing ships are large amphibious warfare vessels built by Garden Reach Shipbuilders and Engineers for the Indian Navy. They are an evolution of the -class amphibious landing ships. Initially, the ship was classified as Landing Ship Tank (Large) or LST(L). The class has an indigenous content of over 90%.[1] The ships also carry four landing craft vehicle personnel (LCVP) on board, which can be used for the landing of troops.[2]
History[edit | edit source]
The order for the vessels were placed in December 2001 while the contract was signed in early 2002.[1]
The ship is equipped with WM-18 140 mm rocket launchers, developed by DRDO and manufactured by Larsen & Toubro. Two units of the system is integrated with one each on port and starboard. The rocket launcher has 18 tubes in a configuration of 6×3. These are used for beach clearing operations before initiating amphibious operations. The armament also includes four CRN-91 autocannons for self-defence.[3][4][5]
Shardul was the first vessel commissioned at Karwar Naval Base, INS Kadamba. The second ship Kesari was commissioned at the Visakhapatnam Naval Base,[6] and later moved to Port Blair.[7] The third ship Airavata underwent sea trials in 2008 and was commissioned in 2009.[8][9][10]
Ships[edit | edit source]
| Name | Pennant Number | Laid down[1] | Launched[1] | Commissioned | Status | |
|---|---|---|---|---|---|---|
| Shardul | L16 | 16 December 2002 | 3 April 2004 | 4 January 2007 | Active | |
| Kesari | L15 | 8 June 2005 | 5 April 2008 | |||
| Airavat | L24 | 27 March 2006 | 19 May 2009 | |||
Gallery[edit | edit source]
See also[edit | edit source]
References[edit | edit source]
- ↑ 1.0 1.1 1.2 1.3 "Shardul Class". Retrieved 22 September 2024.
- ↑ "Operation Samudra Setu: Why the Indian Navy chose INS Jalashwa and INS Magar". The Week. 6 May 2020. Archived from the original on 6 December 2024. Retrieved 3 January 2021.
- ↑ @DefenceDecode (10 August 2020). "DRDO-L&T Rocket Launcher WM-18: Rocket Launcher WM-18 is used for beach clearing operations by the LST class of ships, before executing amphibious operations. The weapon system comprises 2 launcher mounts, one each for port and starboard..." (Tweet). Retrieved 22 September 2024 – via Twitter.
- ↑ @strategicfront (17 June 2020). "Vietnamese amphibious ships with L&T WM-18 Rocket Launchers . The WM-18 is used for beach clearing operations by the Shardul-class LST of the IN, before executing amphibious operations..." (Tweet). Retrieved 22 September 2024 – via Twitter.
- ↑ @strategicfront (25 May 2021). "L&T's missile systems production plant. L&T works as both the systems integrator & the supplier for many munitions..." (Tweet). Retrieved 22 September 2024 – via Twitter.
- ↑ "INS Kesari Commissioned". Indian Navy. 5 April 2008. Archived from the original on 21 June 2008. Retrieved 6 July 2019.
- ↑ "Another naval ship heads for Seychelles". The Hindu. 8 May 2009. Retrieved 21 February 2015.
- ↑ Balajj, J. (8 April 2008). "INS Airavata for basin trials in May". The Hindu. Archived from the original on 29 April 2012. Retrieved 21 February 2015.
- ↑ "Image of INS Airavat". Press Information Bureau. Government of India. 19 May 2009. Retrieved 21 February 2015.
- ↑ "Image during Commissioning ceremony". Press Information Bureau. Government of India. 19 May 2009. Retrieved 21 February 2015.
_entering_Port_Luis,_Mauritius.jpg)



