{{Infobox company | {{Infobox company | ||
| name = | | name = Madhya Pradesh Power Generating Company Limited | ||
| logo = | | logo = | ||
| type = [[Government-owned corporation|Government-owned Corporation]]-[[Public Sector Undertaking|PSU]] | | type = [[Government-owned corporation|Government-owned Corporation]]-[[Public Sector Undertaking|PSU]] | ||
| Line 9: | Line 9: | ||
| key_people = Shri Sanjay Dubey (chairman)<br />Shri Manjeet Singh (managing director) | | key_people = Shri Sanjay Dubey (chairman)<br />Shri Manjeet Singh (managing director) | ||
| services = [[Electricity Generation]] | | services = [[Electricity Generation]] | ||
| area_served = State of [[Madhya Pradesh]],India | | area_served = State of [[Madhya Pradesh]], India | ||
| foundation = The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005 | | foundation = The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005 | ||
| location = [[Jabalpur, Madhya Pradesh]], India | | location = [[Jabalpur, Madhya Pradesh]], India | ||
| Line 17: | Line 17: | ||
}} | }} | ||
'''M.P. Power | '''M.P. Power Generating Company Limited''' ('''MPPGCL''') is the [[electricity]] generation company of the [[Government of Madhya Pradesh]] state in [[India]]. | ||
== Generation capacity == | == Generation capacity == | ||
The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.<ref name=":0">{{cite web|title= | The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.<ref name=":0">{{cite web|title=M.P.Power Generating Company Limited|url=http://www.mppgcl.mp.gov.in/mppgenco-introduction.html|last=|first=|date=|website=|url-status=dead|archiveurl=https://web.archive.org/web/20100609195606/http://mppgenco.nic.in/mpgenco-install-detail.htm|archivedate=2010-06-09|accessdate=2010-08-28}}</ref> | ||
{| class="wikitable" | {| class="wikitable" | ||
| colspan="6" | '''PLF (%) | | colspan="6" | '''PLF (%) Last 10 Years''' | ||
|- | |- | ||
| | |Years | ||
|ATPS | |ATPS | ||
|STPS | |STPS | ||
|SGTPS | |SGTPS | ||
|SSTPP | |SSTPP | ||
| | |Overall | ||
|- | |- | ||
|2009-10 | |2009-10 | ||
| Line 107: | Line 107: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Sr.No !! Project !! Capacity(in M.W.) !! Unit [[Megawatt|MW]] !! Status !! EPC Contractor(TG set and Boiler make) | ! Sr.No !! Project !! Capacity (in M.W.) !! Unit [[Megawatt|MW]] !! Status !! EPC Contractor (TG set and Boiler make) | ||
|- | |- | ||
| 1 || [[Satpura Thermal Power Station]] || 1330 || 1×200 MW, 3x210 MW, 2x250 MW ||All Unit Functional,however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying || [[BHEL]] | | 1 || [[Satpura Thermal Power Station]] || 1330 || 1×200 MW, 3x210 MW, 2x250 MW ||All Unit Functional, however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying || [[Bharat Heavy Electricals Limited|BHEL]] | ||
|- | |- | ||
| 2 || [[Amarkantak Thermal Power Station]] ||210|| 1×210 MW ||All Unit Functional ,1x660 MW under surveying || | | 2 || [[Amarkantak Thermal Power Station]] ||210|| 1×210 MW ||All Unit Functional ,1x660 MW under surveying || BHEL | ||
|- | |- | ||
| 3 || [[Sanjay Gandhi Thermal Power Station]] || 1340 || 4×210 MW,1×500 MW || All Unit Functional || | | 3 || [[Sanjay Gandhi Thermal Power Station]] || 1340 || 4×210 MW,1×500 MW || All Unit Functional || BHEL (though ABL make boiler in 210MW units) | ||
|- | |- | ||
| 4 || [[Shree Singaji Thermal Power Station]] || 2520 || 2x600 MW, 2×660 MW(super critical) || All Unit Functional.|| | | 4 || [[Shree Singaji Thermal Power Station]] || 2520 || 2x600 MW, 2×660 MW (super critical) || All Unit Functional.|| BHEL -600MW, [[L&T-MHPS]]-660MW | ||
|- | |- | ||
| Line 124: | Line 124: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Sr.No !! Power Station !! Installed Capacity !! M.P.Share!! | ! Sr.No !! Power Station !! Installed Capacity !! M.P.Share!!Location / River | ||
|- | |- | ||
| 1 || Gandhi Sagar(5x23 MW) || 115 || 57.5|| | | 1 || Gandhi Sagar (5x23 MW) || 115 || 57.5||Distt. Mandsour / Chambal River | ||
|- | |- | ||
| 2 || Pench,Totladoh(2x80 MW) || 160|| 107|| | | 2 || Pench, Totladoh (2x80 MW) || 160|| 107||Distt. Nagpur / Pench River | ||
|- | |- | ||
| 3 || Rani Awanti Bai Bargi (2x45 MW)|| 90 || 90|| | | 3 || Rani Awanti Bai Bargi (2x45 MW)|| 90 || 90||Bargi, Distt. Jabalpur / Narmada River | ||
|- | |- | ||
| 4 ||Rajghat (3x15 MW) || 45 || 22.5|| | | 4 ||Rajghat (3x15 MW) || 45 || 22.5||Rajghat, Distt. Ashoknagar / Betwar River | ||
|- | |- | ||
| 5 || Birsinghpur(1x20 MW) ||20 || 20|| | | 5 || Birsinghpur (1x20 MW) ||20 || 20||Birsingpur, Distt. Umariya / Johila River | ||
|- | |- | ||
| 6 ||Ban Sagar I Tons(3x105 MW) ||315|| 315|| | | 6 ||Ban Sagar I Tons (3x105 MW) ||315|| 315||Sirmour, Distt. Rewa Beehar River | ||
|- | |- | ||
| 7 ||Ban Sagar II Silpara(2x15 MW) || 30 || 30|| | | 7 ||Ban Sagar II Silpara (2x15 MW) || 30 || 30||Silpara, Distt. Rewa / Cana | ||
|- | |- | ||
| 8 || Bansagar -III Deolond (3x20 MW)|| 60 || 60|| | | 8 || Bansagar -III Deolond (3x20 MW)|| 60 || 60||Deolond, Distt. Shahdol / Sone River | ||
|- | |- | ||
| 9 || Bansagar -IV Jhinna (2x10 MW)||20 || 20|| | | 9 || Bansagar -IV Jhinna (2x10 MW)||20 || 20||Jhinna, Distt. Satna / Jhinna Dyke | ||
|- | |||
| 10 || Madhikheda (3x20 MW) || 60 || 60||Madhikheda, Distt. Shivpuri / Kalisindh River | |||
|- | |- | ||
| || Total|| 1186 || 917.5 | | || Total|| 1186 || 917.5 | ||
|} | |} | ||
Two proposed Hydel unit at Chhindwara(2x45MW) and Murena(270 MW) | Two proposed Hydel unit at Chhindwara (2x45MW) and Murena (270 MW) | ||
== References == | == References == | ||
Latest revision as of 17:39, 29 September 2025
| Industry | Electricity generation |
|---|---|
| Founded | The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005 |
| Headquarters | Jabalpur, Madhya Pradesh, India |
Area served | State of Madhya Pradesh, India |
Key people | Shri Sanjay Dubey (chairman) Shri Manjeet Singh (managing director) |
| Services | Electricity Generation |
| Owner | Government of Madhya Pradesh (100%) |
Number of employees | 4878 |
| Website | www |
M.P. Power Generating Company Limited (MPPGCL) is the electricity generation company of the Government of Madhya Pradesh state in India.
Generation capacity[edit | edit source]
The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.[1]
| PLF (%) Last 10 Years | |||||
| Years | ATPS | STPS | SGTPS | SSTPP | Overall |
| 2009-10 | 45.89% | 64.57% | 65.99% | N.A. | 62.86% |
| 2010-11 | 48.66% | 60.51% | 65.78% | N.A. | 61.10% |
| 2011-12 | 54.66% | 53.68% | 70.20% | N.A. | 61.38% |
| 2012-13 | 71.66% | 55.26% | 73.52% | N.A. | 66.24% |
| 2013-14 | 74.3% | 48.0% | 67.8% | N.A. | 60.0% |
| 2014-15 | 53.3% | 52.9% | 58.1% | 26.23% | 49.6% |
| 2015-16 | 96.8% | 47.2% | 59.9% | 40.4% | 51.2% |
| 2016-17 | 80.51% | 31.28% | 58.53% | 23.54% | 40.49% |
| 2017-18 | 93.94% | 43.09% | 64.26% | 35.90% | 50.55% |
| 2018-19 | 88.9% | 64.1% | 74.0% | 61.1% | 67.3% |
Power stations[edit | edit source]
Thermal power stations coal based[edit | edit source]
| Sr.No | Project | Capacity (in M.W.) | Unit MW | Status | EPC Contractor (TG set and Boiler make) |
|---|---|---|---|---|---|
| 1 | Satpura Thermal Power Station | 1330 | 1×200 MW, 3x210 MW, 2x250 MW | All Unit Functional, however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying | BHEL |
| 2 | Amarkantak Thermal Power Station | 210 | 1×210 MW | All Unit Functional ,1x660 MW under surveying | BHEL |
| 3 | Sanjay Gandhi Thermal Power Station | 1340 | 4×210 MW,1×500 MW | All Unit Functional | BHEL (though ABL make boiler in 210MW units) |
| 4 | Shree Singaji Thermal Power Station | 2520 | 2x600 MW, 2×660 MW (super critical) | All Unit Functional. | BHEL -600MW, L&T-MHPS-660MW |
Total installed thermal capacity 5400 MW.
Hydel power stations[edit | edit source]
| Sr.No | Power Station | Installed Capacity | M.P.Share | Location / River |
|---|---|---|---|---|
| 1 | Gandhi Sagar (5x23 MW) | 115 | 57.5 | Distt. Mandsour / Chambal River |
| 2 | Pench, Totladoh (2x80 MW) | 160 | 107 | Distt. Nagpur / Pench River |
| 3 | Rani Awanti Bai Bargi (2x45 MW) | 90 | 90 | Bargi, Distt. Jabalpur / Narmada River |
| 4 | Rajghat (3x15 MW) | 45 | 22.5 | Rajghat, Distt. Ashoknagar / Betwar River |
| 5 | Birsinghpur (1x20 MW) | 20 | 20 | Birsingpur, Distt. Umariya / Johila River |
| 6 | Ban Sagar I Tons (3x105 MW) | 315 | 315 | Sirmour, Distt. Rewa Beehar River |
| 7 | Ban Sagar II Silpara (2x15 MW) | 30 | 30 | Silpara, Distt. Rewa / Cana |
| 8 | Bansagar -III Deolond (3x20 MW) | 60 | 60 | Deolond, Distt. Shahdol / Sone River |
| 9 | Bansagar -IV Jhinna (2x10 MW) | 20 | 20 | Jhinna, Distt. Satna / Jhinna Dyke |
| 10 | Madhikheda (3x20 MW) | 60 | 60 | Madhikheda, Distt. Shivpuri / Kalisindh River |
| Total | 1186 | 917.5 |
Two proposed Hydel unit at Chhindwara (2x45MW) and Murena (270 MW)