Imphal railway station: Difference between revisions

Created by Colonies Chris
Last edited October 27, 2025
>Colonies Chris
m minor fixes, replaced: India → India, | style = Indian railway → | style = Indian Railways, [[List of railway stations in India|Indian Railway Station → [[List of railway stations in India|Indian railway station, | type =
 
updated
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Short description|Railway station in Manipur, India}}
{{Use dmy dates|date=August 2018}}
{{Use dmy dates|date=August 2018}}
{{Use Indian English|date=August 2018}}
{{Use Indian English|date=August 2018}}
{{Infobox station
{{Infobox station
| name         = Imphal railway station
| name = Imphal
|other_name=| style = Indian Railways
| other_name =  
| style = Indian Railways
| type = [[Indian Railways]] station
| type = [[Indian Railways]] station
| image         =  
| image =  
| address       = [[Yerembam]], [[Manipur]]
| address = [[Yurembam]], [[Manipur]]
| country       = India
| country = India
| coordinates   = {{coord|24.765|93.866|display=title,inline}}
| coordinates = {{coord|24.765|93.866|display=title,inline}}
| elevation     = {{convert|521|m|ft}}
| elevation = {{convert|521|m|ft}}
| owned         = [[Indian Railways]]
| owned = [[Indian Railways]]
| operator     = [[North East Frontier Railway]]
| operator = [[Northeast Frontier Railway]]
| line         = [[Lumding–Imphal section]]
| line = [[Lumding]]–[[Imphal]] line
| platform     = 1
| platform = 2
| tracks       = 2
| tracks = 2
| other         =  
| other =  
| ADA          =
| accessible =  
| bicycle       = No
| bicycle = Yes
| depth         =
| depth =  
| levels       =
| levels =  
| parking       = No
| parking = Yes
| structure     = Standard (on-ground station)
| structure = Standard (on-ground station)
| code           = {{Indian railway code
| code = {{Indian railway code
   | code = IMPAL
   | code = IMPAL
   | zone = [[North East Frontier Railway]]
   | zone = [[Northeast Frontier Railway]]
   | division = {{rwd|Lumding}}
   | division = {{rwd|Lumding}}
   }}
   }}
| status       = Under-construction
| status = Under-construction
| closed       =
| closed =  
| former       =  
| former =  
| opened       = TBA
| opened = December 2026 (expected)
| rebuilt       =
| rebuilt =  
| electrified   = No
| electrified = No
| passengers   =
| passengers =  
| mpassengers   =
| mpassengers =  
| pass_system   =
| pass_system =  
| pass_year     =
| pass_year =  
| pass_percent =
| pass_percent =  
| services     = <!-- Only use S-rail/S-line Templates here, without start or end -->
| services = <!-- Only use S-rail/S-line Templates here, without start or end -->
| image_caption =
| image_caption = Imphal Railway Station after completion
}}
}}
'''Imphal railway station''' is an under construction railway station in [[Imphal|Imphal (west district)]], [[Manipur]]. Its code is '''IMPAL'''. It will serve [[Imphal]] city. The station consists of two platforms.<ref>{{cite web| url=http://indiarailinfo.com/station/map/imphal-impal/10679| title=IMPAL/Imphal| website=India Rail Info}}</ref>


==Current status==
'''Imphal Railway station''' is an under-construction railway station in [[Imphal]] in [[Manipur]], [[India]].<ref name=plat1>{{cite web| url=http://indiarailinfo.com/station/map/imphal-impal/10679| title=IMPAL/Imphal| website=India Rail Info}}</ref>
* {{As of|July 2020}}, [[Jiribam–Imphal line]], 111&nbsp;km long, to Imphal is likely to be completed by March 2022.<ref name=railne1>[https://www.financialexpress.com/infrastructure/railways/north-east-to-get-better-indian-railways-connectivity-5-major-rail-projects-lined-up-details-here/2027372/ North East to get better Indian Railways connectivity! 5 major rail projects lined up], ''Financial Express'', July 17, 2020.</ref>
* {{As of|February 2020}}, Chairman Railway Board inspected the progress of the under construction 110-km long Jiribam–Imphal railway line project. The crucial infrastructure project will provide railway connectivity to [[Imphal]], the capital of [[Manipur]]. The rail line project is being developed at a cost of INR 12,524 crore and it is targeted for completion in March 2022. The rail line includes 47 tunnels totalling  62&nbsp;km, 46 tunnels are completed and as many as 149 bridges. Highest bridge of 141 meters.<ref>https://www.financialexpress.com/infrastructure/railways/boost-for-north-east-indian-railways-jiribam-imphal-rail-line-project-set-for-completion-soon/1877289/</ref>
* {{As of|August 2019}}, the 65% work is complete, Imphal station building is under construction.revised expected deadline is December 2022.{{citation needed|date=September 2020}}


==Future development==
==Facilities ==
* Future line development plan entails extending the line from [[Imphal]] to [[Moreh, India|Moreh]] on the [[India–Myanmar border]], from where it will then be extended to the existing railhead at [[Kalay]] (also called Kale and Kalemyo) in Myanmar to form part of the ambitious [[Trans-Asian Railway]].
 
The station will have two [[Side platform|side-platforms]].<ref name=plat1/>
 
==Rail lines==
{{anchor | Line }}
 
===Trans-Asian Railway===
{{anchor | Trans }}
 
Partially-complete [[Trans-Asian Railway]] (TAR), Yunnan-Kalay-Moreh-Imphal-Jiribam-Gede-Attari route passing through Imphal railway station, will enable containers from Singapore, China, Vietnam, Cambodia, India, Bangladesh, Myanmar, Thailand, and Korea to travel overland by train to Europe. Presently, all freight traffic originating from Asia destined for Europe goes by sea. The Southern Corridor of the Trans-Asian Railway is of prime interest to India. It connects [[Yunnan]] in China and [[Thailand]] with Europe via Turkey and passes through India.<ref>{{cite web| url = http://streamlinesupplychain.wordpress.com/2007/12/27/trans-asian-railways-tar/|title = Trans-Asian Railway| date=27 December 2007 | publisher= Streamline Supply Chain| access-date = 2011-12-22 }}</ref>
 
As per India-Myanmar MoU, their railway networks will be interconnected via a 346-km line section that will extend from [[Kalay]] in Myanmar to [[Jiribam]] in India via the border point at [[Tamu, Myanmar|Tamu]] / [[Moreh, India|Moreh]].<ref>{{cite web|url=http://www.unescap.org/ttdw/common/TIS/TAR/text/tar_priority.pdf |title=Priority Investment Needs for the development of the Trans-Asian Railway Network |publisher=Economic and Social Commission for Asia and the Pacific |access-date=2011-12-26 |url-status=dead |archive-url=https://web.archive.org/web/20120120222326/http://www.unescap.org/ttdw/common/TIS/TAR/text/tar_priority.pdf |archive-date=20 January 2012 }}</ref> The proposed route will enter India through [[Tamu, Burma|Tamu]] and Moreh in [[Manipur]] bordering [[Myanmar]], then enter [[Bangladesh]] through  Mahisasan and Shahbajpur and again enter India from Bangladesh at [[Gede, Nadia|Gede]]. On the western side, the line will enter Pakistan at [[Attari]]. There is a {{convert|315| km}} missing link on this route in the India–Myanmar sector; of this, {{convert|180|km}}, in India, is between [[Jiribam]]  in Manipur and Tamu in Myanmar. The rail link between Jiribam and [[Imphal]] has been sanctioned by Indian Railways, but that is unlikely to be completed before 2016. Construction work is in progress in a {{convert|97|km}} stretch between Jiribam and Imphal.<ref>{{cite web| url = http://www.lawrkhawm.com/index.php?page=475 |title = Agreement on Trans-Asian railway passing through Manipur signed| publisher= Larkhawm | access-date = 2011-12-22 }}</ref><ref>{{cite web| url = http://hindu.com/2007/07/01/stories/2007070150650900.htm | archive-url = https://web.archive.org/web/20070812093328/http://www.hindu.com/2007/07/01/stories/2007070150650900.htm | url-status = dead | archive-date = 12 August 2007 |title  =India signs accord on trans-Asian railway network |date=1 July 2007| work = [[The Hindu]] |  access-date = 2011-12-22 }}</ref><ref>{{cite web| url = http://www.thefinancialexpress-bd.com/more.php?news_id=129648&date=2011-03-18 |title = B'desh segment of TAR route preparation shows progress | work= Financial Express|date=18 March 2011| access-date = 2011-12-22 }}</ref><ref>{{cite web| url = http://www.telegraphindia.com/1110226/jsp/frontpage/story_13637652.jsp | archive-url = https://web.archive.org/web/20110301105820/http://www.telegraphindia.com/1110226/jsp/frontpage/story_13637652.jsp | url-status = dead | archive-date = 1 March 2011 |title = Manipur gets rail gift for Trinamul bypoll win – Tall promises of connecting all capitals of region leaves Northeast industry captains unimpressed | work= The Telegraph|date=26 February 2011 | access-date = 2011-12-22 }}</ref>
 
Following lines are part of the TAR and India's Act East Policy.
 
===Jiribam–Imphal line===
{{anchor | Jiribam | Moreh | Kalay | Kale | Kalemyo | Jiribam–Imphal line | Imphal–Moreh line | Moreh–Myanmar line | Moreh–Kalay line | Moreh–Kale line | Moreh– Kalemyo line | Imphal–Moreh-Kalay line | Imphal–Moreh-Kale line | Imphal–Moreh-Kalemo line }}
 
====Details====
 
'''[[Jiribam–Imphal line]]'''<!-- CAUTION: please retain the REDLINK to encourage article creation. Please HELP CREATE THE ARTICLE by moving the text on this line into new article.-->, 111&nbsp;km long railway line project costing 22,274.57 crore (2024 estimates).<ref name=projc1>[https://www.imphaltimes.com/news/govt-taking-all-measures-to-complete-jiribam-imphal-railway-project-mos-ravneet-singh/ Govt taking all measures to complete Jiribam–Imphal Railway Project: MoS Ravneet Singh], imphaltimes.com, 11 Apr 2025.</ref> includes 8 new stations, 62&nbsp;km of tunnels, 11 major bridges, 134 minor bridges, 4 road overbridges, and 12 road underbridges. The [[Jiribam railway station|Jiribam]]–[[Vangaichungpao railway station|Vangaichungpao]]–[[Tupul railway station|Tupul]]-Imphal route will connect [[Imphal]], the capital of [[Manipur]] to the rest of India by a rail link.<ref name=railt1>[https://www.financialexpress.com/infrastructure/railways/boost-for-north-east-indian-railways-jiribam-imphal-rail-line-project-set-for-completion-soon/1877289/ Jiribam-imphal rail line set for completion soon], Financial Express, 24 Feb 2020.</ref><ref name=railne1/>
 
This line has twin-tube parallel tunnel. Tunnel no. 12, India's ₹ 930 crore longest tunnel with 11.55&nbsp;km length between [[Jiribam district|Jiribam]] and [[Imphal West district|Imphal West]], surpasses the 8.5&nbsp;km [[Pir Panjal Railway Tunnel]] on the [[Jammu–Baramulla line|Banihal-Qazigund line]] as India's longest tunnel. There is a ₹ 368 crore parallel 9.35&nbsp;km long safety tunnel, compliant with international technical specifications, with cross passages at every 500 meters for evacuation. Bridge no. 64, which connects to the tunnel, cost ₹ 283.5 crore.<ref name=railne1>[https://assamtribune.com/north-east/imphal-4th-capital-city-in-ne-to-come-on-railway-map-within-27-months-1203016 Imphal, 4th capital city in NE, to come on railway map within 27 months], Assam Tribune, 13 Sep 2021.</ref>
 
====Route====
 
Jiribam-Imphal line has following stations, 1 existing (Jiribam) and the rest new at the time of construction:<ref name=stal1>[https://indiarailinfo.com/station/map/jiribam-jrbm/9435 Jiribam-Imphal rail], indiarailinfo.com, accessed 5 Jul 2025.</ref>
 
* [[Jiribam railway station]]<ref name=stal1/>
* [[Vangaichungpao railway station]], halt.<ref name=stal1/>
* [[Kamranga railway station]], intermediate halt (higher classification than "halt").<ref name=stal1/>
* [[Sribar railway station]], intermediate halt.<ref name=stal1/>
* [[Ranigaon railway station]], intermediate halt.<ref name=stal1/>
* [[Vangaichungpao railway station]], intermediate halt.<ref name=stal1/>
* [[Khongsang railway station]], major station.<ref name=stal1/>
* [[Rani Gaidinliu railway station]] (Kaimai), major station.<ref name=stal1/> (Kaimai)
* [[Haipou Jadonang Kambiron railway station]], intermediate halt.<ref name=stal1/>
* [[Noney railway station]], major station near world's tallest pier bridge.<ref name=stal1/>
* [[Tupul railway station]], first hill station in Manipur enroute.<ref name=stal1/>
* [[Thingu railway station]], intermediate halt.<ref name=stal1/>
* [[Phayeng railway station]], halt.<ref name=stal1/>
* Imphal railway station, major station.<ref name=stal1/>
 
====Current status====
 
Current status of Jiribam-Imphal line:
 
* '''2025 May''': Out of total 111&nbsp;km Jribam-Imphal line, 50% or 55.36&nbsp;km Jiribam-Khongsang section was completed and operationalised in 2022, while remaining 18.25&nbsp;km Khongsang-Noney and 37.02&nbsp;km Noney-Imphal sections are under construction.<ref>[https://www.newindianexpress.com/nation/2025/May/29/nf-railway-completes-girder-launch-on-worlds-tallest-pier-bridge-in-manipur NF Railway completes girder launch on world’s tallest pier bridge in Manipur], newindianexpress.com, 29 May 2025.</ref> 65% work, based on the actual budget, was complete by March 2024,<ref name=projc1/> with the project expected to be fully completed by December 2026 (2021 estimate).<ref name=railne1/>
 
===Imphal-Moreh line===
{{anchor | Moreh }}
 
====Details====
{{anchor | MorehDet }}
 
'''[[Imphal-Moreh line]]'''<!-- CAUTION: please retain the REDLINK to encourage article creation. Please HELP CREATE THE ARTICLE by moving the text on this line into new article.-->: planned Rs 6,000 crore 111&nbsp;km long future phase to [[India-Myanmar border]] at Moreh-Tamu as part of India's [[Act East policy]], requiring tunnels or bridges in hilly areas near Tengnoupal and Myanmar border, will eventually connect to Myanmar’s rail network via proposed Kalay-Kyigone-Moreh line of TAR.<ref name="NFR Survey 2024">{{cite news |title=Final Location Survey for Imphal-Moreh rail line completed |url=https://www.thehindu.com/news/national/other-states/final-location-survey-for-imphal-moreh-rail-line-completed/article67923415.ece |work=The Hindu |date=15 March 2024 |access-date=5 July 2024}}</ref><ref name="Act East Policy">{{cite report |title=Indian Railways' Connectivity Projects in Northeast |url=https://indianrailways.gov.in/railwayboard/uploads/directorate/Infra/NER_Projects_2023.pdf |publisher=Ministry of Railways, Govt. of India |page=12 |date=2023 |access-date=5 July 2024}}</ref><ref name="NFR Alignment">{{cite news |title=Imphal-Moreh rail line to boost India-Myanmar trade |url=https://timesofindia.indiatimes.com/city/imphal/imphal-moreh-rail-line-to-boost-india-myanmar-trade/articleshow/108123456.cms |work=The Times of India |date=10 February 2024 |access-date=5 July 2024}}</ref><ref name="Security Concerns">{{cite journal |last=Singh |first=Bikash |title=Security hurdles delay Imphal-Moreh rail project |journal=The Economic Times |date=22 May 2024 |url=https://economictimes.indiatimes.com/industry/transportation/railways/security-hurdles-delay-imphal-moreh-rail-project/articleshow/110234567.cms |access-date=5 July 2024}}</ref><ref name="Myanmar Link">{{cite web |title=India-Myanmar Rail Link: Progress Update |url=https://www.mea.gov.in/press-releases.htm?dtl/36999/IndiaMyanmar+Rail+Link |publisher=Ministry of External Affairs, India |date=17 January 2024 |access-date=5 July 2024}}</ref>
 
====Route====
{{anchor | MorehRoute }}
 
It has the following proposed Stations:<ref name="NFR Survey 2024"/><ref name="NFR Alignment"/><ref name="Security Concerns"/><ref name="Myanmar Link"/>
 
* Imphal (existing)
* Kakching (new)
* Pallel (new)
* Tengnoupal (new, critical hill section)
* Moreh (terminal station near border).
 
====Current status====
{{anchor | MorehStatus }}
 
* '''2025 Jun''': Final Location Survey (FLS) was completed in March 2024. Detailed Project Report (DPR) by [[Rail India Technical and Economic Service|RITES]]-[[Northeast Frontier Railway|NFR]] will be ready by mid 2025 and approved by late 2025, with construction unlikely to commence before end of 2026-27.<ref name="NFR Survey 2024"/><ref name="NFR Alignment"/><ref name="Security Concerns"/><ref name="Myanmar Link"/>
 
===Imphal-Aizawal line===
{{anchor | Aizawal }}
 
====Details====
{{anchor | AizawalDet }}
 
'''[[Imphal-Aizawal line]]'''<!-- CAUTION: please retain the REDLINK to encourage article creation. Please HELP CREATE THE ARTICLE by moving the text on this line into new article.-->, proposed ~200&nbsp;km ₹ 15,000–20,000 crore+ line connecting Imphal in Manipur in north with [[Aizawal]] in [[Mizoram]] in south, will require multiple tunnels and bridges through the difficult hilly terrain.<ref name="NFR Survey 2023">{{cite news |title=Imphal-Aizawl rail link survey faces hurdles |url=https://www.thehindu.com/news/national/other-states/imphal-aizawl-rail-link-survey-faces-hurdles/article66543210.ece |work=The Hindu |date=12 June 2023 |access-date=10 July 2025}}</ref><ref name="Mizoram Demand">{{cite press release |title=Mizoram CM seeks Centre's approval for Imphal-Aizawl rail line |url=https://pib.gov.in/PressReleasePage.aspx?PRID=1904567 |publisher=Press Information Bureau |date=5 November 2024 |access-date=10 July 2025}}</ref><ref name="Railway Ministry Plan">{{cite report |title=Indian Railways' Vision 2047: Northeast Connectivity |url=https://indianrailways.gov.in/railwayboard/uploads/directorate/Infra/Vision_2047_NE.pdf |publisher=Ministry of Railways |page=23 |date=2024 |access-date=10 July 2025}}</ref>
 
====Route ====
{{anchor | AizawalRoute }}
 
Will connect Manipur (Imphal) with Mizoram (Aizawl), route will be decided after FSL (Final Location Survey).<ref name="NFR Survey 2023"/><ref name="Mizoram Demand"/><ref name="Railway Ministry Plan"/>
 
====Current status ====
{{anchor | AizawalStatus }}
 
* '''2025 Jun''': Though Mizoram Government has been pushing for this line since 2018, the proposal is in preliminary planning stage only. Northeast Frontier Railway (NFR) had completed a Preliminary Survey (PS) in 2022–2023 but since then there is no progress as FSL and final alignment finalization have not been conducted, hence Detailed Project Report (DPR) could not be prepared because the Railway Ministry has classified this as a "long-term project", i.e. not in immediate 2024–2030 infrastructure plans due to the lack of political will at central government level. If the Indian government decides to expedite the project, the DPR completion could be likely by 2026–2027 and earliest commencement of construction would be likely by 2030, but more realistically after 2035 unless this line is declared a [[National Security Strategy (India)|special National Strategic Project]] before that.<ref name="NFR Survey 2023"/><ref name="Mizoram Demand"/><ref name="Railway Ministry Plan"/>
 
===Imphal-Kohima line===
{{anchor | Kohima }}
 
====Details====
{{anchor | KohimaDet }}
 
'''[[Kohima-Imphal line]]'''<!-- CAUTION: please retain the REDLINK to encourage article creation. Please HELP CREATE THE ARTICLE by moving the text on this line into new article.-->, proposed ~220&nbsp;km ₹ 25,000+ crore line will run through [[Patkai]] mointain ranage and require 50+ tunnels.<ref name="Imphal Extension">{{cite report |title=Northeast Rail Network Expansion Plan 2040 |url=https://indianrailways.gov.in/railwayboard/uploads/Infra/NE_2040_Plan.pdf |publisher=Ministry of Railways |page=34 |date=January 2025 |access-date=9 July 2025}}</ref>
 
====Route ====
{{anchor | KohimaRoute}}
 
Will connect Kohima, the capital of Nagaland, with Imphal, the capita of Manipur,.<ref name="Imphal Extension"/> route will be decided after FSL (Final Location Survey).
 
====Current status ====
{{anchor | KohimaStatus }}
 
* '''2025 Jun''': proposed but not yet surveyed as it is still in the pre-feasibility stage, hence likely to see progress after 2030.<ref name="Imphal Extension"/>
 
===Imphal-Agartala line===
{{anchor | Agartala }}
 
====Details====
{{anchor | AgartalaDet }}
 
'''[[Imphal-Agartala line]]'''<!-- CAUTION: please retain the REDLINK to encourage article creation. Please HELP CREATE THE ARTICLE by moving the text on this line into new article.-->, proposed ~350&nbsp;km ₹ 20,000+ crore direct line through [[Barak Valley]] and tribal areas is mentioned in "Northeast Vision 2040" documents as a long-term goal.<ref name="NE Vision 2040">{{cite report |title=Northeast Infrastructure Vision 2040 |url=https://mdoner.gov.in/sites/default/files/NE_Vision_2040.pdf |publisher=Ministry of Development of North Eastern Region |page=67 |date=2024 |access-date=9 July 2025}}</ref><ref name="Terrain Issues">{{cite journal |last=Baruah |first=S. |title=Geopolitics of Northeast India's Rail Connectivity |journal=Economic and Political Weekly |volume=60 |issue=15 |pages=22–25 |date=April 2025 |issn=0012-9976}}</ref>
 
====Route ====
{{anchor | AgartalaRoute}}
 
Will connect Imphal, the capital of Manipur, with Agartala, the capital of [[Tripura]] along Imphal-Churachandpur-Tipaimukh- Jiribam/Silchar-Agartala route,<ref name="NE Vision 2040"/> route will be decided after FSL (Final Location Survey).
 
====Current status ====
{{anchor | AgartalaStatus }}
 
* '''2025 Jun''': proposed but not yet surveyed as it is still in the pre-feasibility stage.<ref name="NE Vision 2040"/><ref name="Terrain Issues"/>


==See also==
==See also==
* [[Jiribam railway station]]
 
* [[Lumding railway division]]
* [[North Eastern Railway Connectivity Project]]
* [[Northeast Frontier Railway zone]]
* [[Northeast Frontier Railway zone]]


Line 64: Line 187:
[[Category:Lumding railway division]]
[[Category:Lumding railway division]]
[[Category:Proposed railway stations in India]]
[[Category:Proposed railway stations in India]]
{{Manipur-railstation-stub}}

Latest revision as of 16:51, 27 October 2025

Imphal
Indian Railways station
LocationYurembam, Manipur
India
Coordinates24°45′54″N 93°51′58″E / 24.765°N 93.866°E / 24.765; 93.866
Elevation521 metres (1,709 ft)
Owned byIndian Railways
Operated byNortheast Frontier Railway
Line(s)LumdingImphal line
Platforms2
Tracks2
Construction
Structure typeStandard (on-ground station)
ParkingYes
Bicycle facilitiesYes
Other information
StatusUnder-construction
Station codeIMPAL
Zone(s) Northeast Frontier Railway
Division(s) Lumding
History
OpenedDecember 2026 (expected)
ElectrifiedNo

Imphal Railway station is an under-construction railway station in Imphal in Manipur, India.[1]

Facilities[edit | edit source]

The station will have two side-platforms.[1]

Rail lines[edit | edit source]

Trans-Asian Railway[edit | edit source]

Partially-complete Trans-Asian Railway (TAR), Yunnan-Kalay-Moreh-Imphal-Jiribam-Gede-Attari route passing through Imphal railway station, will enable containers from Singapore, China, Vietnam, Cambodia, India, Bangladesh, Myanmar, Thailand, and Korea to travel overland by train to Europe. Presently, all freight traffic originating from Asia destined for Europe goes by sea. The Southern Corridor of the Trans-Asian Railway is of prime interest to India. It connects Yunnan in China and Thailand with Europe via Turkey and passes through India.[2]

As per India-Myanmar MoU, their railway networks will be interconnected via a 346-km line section that will extend from Kalay in Myanmar to Jiribam in India via the border point at Tamu / Moreh.[3] The proposed route will enter India through Tamu and Moreh in Manipur bordering Myanmar, then enter Bangladesh through Mahisasan and Shahbajpur and again enter India from Bangladesh at Gede. On the western side, the line will enter Pakistan at Attari. There is a 315 kilometres (196 mi) missing link on this route in the India–Myanmar sector; of this, 180 kilometres (110 mi), in India, is between Jiribam in Manipur and Tamu in Myanmar. The rail link between Jiribam and Imphal has been sanctioned by Indian Railways, but that is unlikely to be completed before 2016. Construction work is in progress in a 97 kilometres (60 mi) stretch between Jiribam and Imphal.[4][5][6][7]

Following lines are part of the TAR and India's Act East Policy.

Jiribam–Imphal line[edit | edit source]

Details[edit | edit source]

Jiribam–Imphal line, 111 km long railway line project costing 22,274.57 crore (2024 estimates).[8] includes 8 new stations, 62 km of tunnels, 11 major bridges, 134 minor bridges, 4 road overbridges, and 12 road underbridges. The JiribamVangaichungpaoTupul-Imphal route will connect Imphal, the capital of Manipur to the rest of India by a rail link.[9][10]

This line has twin-tube parallel tunnel. Tunnel no. 12, India's ₹ 930 crore longest tunnel with 11.55 km length between Jiribam and Imphal West, surpasses the 8.5 km Pir Panjal Railway Tunnel on the Banihal-Qazigund line as India's longest tunnel. There is a ₹ 368 crore parallel 9.35 km long safety tunnel, compliant with international technical specifications, with cross passages at every 500 meters for evacuation. Bridge no. 64, which connects to the tunnel, cost ₹ 283.5 crore.[10]

Route[edit | edit source]

Jiribam-Imphal line has following stations, 1 existing (Jiribam) and the rest new at the time of construction:[11]

Current status[edit | edit source]

Current status of Jiribam-Imphal line:

  • 2025 May: Out of total 111 km Jribam-Imphal line, 50% or 55.36 km Jiribam-Khongsang section was completed and operationalised in 2022, while remaining 18.25 km Khongsang-Noney and 37.02 km Noney-Imphal sections are under construction.[12] 65% work, based on the actual budget, was complete by March 2024,[8] with the project expected to be fully completed by December 2026 (2021 estimate).[10]

Imphal-Moreh line[edit | edit source]

Details[edit | edit source]

Imphal-Moreh line: planned Rs 6,000 crore 111 km long future phase to India-Myanmar border at Moreh-Tamu as part of India's Act East policy, requiring tunnels or bridges in hilly areas near Tengnoupal and Myanmar border, will eventually connect to Myanmar’s rail network via proposed Kalay-Kyigone-Moreh line of TAR.[13][14][15][16][17]

Route[edit | edit source]

It has the following proposed Stations:[13][15][16][17]

  • Imphal (existing)
  • Kakching (new)
  • Pallel (new)
  • Tengnoupal (new, critical hill section)
  • Moreh (terminal station near border).

Current status[edit | edit source]

  • 2025 Jun: Final Location Survey (FLS) was completed in March 2024. Detailed Project Report (DPR) by RITES-NFR will be ready by mid 2025 and approved by late 2025, with construction unlikely to commence before end of 2026-27.[13][15][16][17]

Imphal-Aizawal line[edit | edit source]

Details[edit | edit source]

Imphal-Aizawal line, proposed ~200 km ₹ 15,000–20,000 crore+ line connecting Imphal in Manipur in north with Aizawal in Mizoram in south, will require multiple tunnels and bridges through the difficult hilly terrain.[18][19][20]

Route[edit | edit source]

Will connect Manipur (Imphal) with Mizoram (Aizawl), route will be decided after FSL (Final Location Survey).[18][19][20]

Current status[edit | edit source]

  • 2025 Jun: Though Mizoram Government has been pushing for this line since 2018, the proposal is in preliminary planning stage only. Northeast Frontier Railway (NFR) had completed a Preliminary Survey (PS) in 2022–2023 but since then there is no progress as FSL and final alignment finalization have not been conducted, hence Detailed Project Report (DPR) could not be prepared because the Railway Ministry has classified this as a "long-term project", i.e. not in immediate 2024–2030 infrastructure plans due to the lack of political will at central government level. If the Indian government decides to expedite the project, the DPR completion could be likely by 2026–2027 and earliest commencement of construction would be likely by 2030, but more realistically after 2035 unless this line is declared a special National Strategic Project before that.[18][19][20]

Imphal-Kohima line[edit | edit source]

Details[edit | edit source]

Kohima-Imphal line, proposed ~220 km ₹ 25,000+ crore line will run through Patkai mointain ranage and require 50+ tunnels.[21]

Route[edit | edit source]

Will connect Kohima, the capital of Nagaland, with Imphal, the capita of Manipur,.[21] route will be decided after FSL (Final Location Survey).

Current status[edit | edit source]

  • 2025 Jun: proposed but not yet surveyed as it is still in the pre-feasibility stage, hence likely to see progress after 2030.[21]

Imphal-Agartala line[edit | edit source]

Details[edit | edit source]

Imphal-Agartala line, proposed ~350 km ₹ 20,000+ crore direct line through Barak Valley and tribal areas is mentioned in "Northeast Vision 2040" documents as a long-term goal.[22][23]

Route[edit | edit source]

Will connect Imphal, the capital of Manipur, with Agartala, the capital of Tripura along Imphal-Churachandpur-Tipaimukh- Jiribam/Silchar-Agartala route,[22] route will be decided after FSL (Final Location Survey).

Current status[edit | edit source]

  • 2025 Jun: proposed but not yet surveyed as it is still in the pre-feasibility stage.[22][23]

See also[edit | edit source]

References[edit | edit source]

  1. 1.0 1.1 "IMPAL/Imphal". India Rail Info.
  2. "Trans-Asian Railway". Streamline Supply Chain. 27 December 2007. Retrieved 22 December 2011.
  3. "Priority Investment Needs for the development of the Trans-Asian Railway Network" (PDF). Economic and Social Commission for Asia and the Pacific. Archived from the original (PDF) on 20 January 2012. Retrieved 26 December 2011.
  4. "Agreement on Trans-Asian railway passing through Manipur signed". Larkhawm. Retrieved 22 December 2011.
  5. "India signs accord on trans-Asian railway network". The Hindu. 1 July 2007. Archived from the original on 12 August 2007. Retrieved 22 December 2011.
  6. "B'desh segment of TAR route preparation shows progress". Financial Express. 18 March 2011. Retrieved 22 December 2011.
  7. "Manipur gets rail gift for Trinamul bypoll win – Tall promises of connecting all capitals of region leaves Northeast industry captains unimpressed". The Telegraph. 26 February 2011. Archived from the original on 1 March 2011. Retrieved 22 December 2011.
  8. 8.0 8.1 Govt taking all measures to complete Jiribam–Imphal Railway Project: MoS Ravneet Singh, imphaltimes.com, 11 Apr 2025.
  9. Jiribam-imphal rail line set for completion soon, Financial Express, 24 Feb 2020.
  10. 10.0 10.1 10.2 Imphal, 4th capital city in NE, to come on railway map within 27 months, Assam Tribune, 13 Sep 2021.
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 Jiribam-Imphal rail, indiarailinfo.com, accessed 5 Jul 2025.
  12. NF Railway completes girder launch on world’s tallest pier bridge in Manipur, newindianexpress.com, 29 May 2025.
  13. 13.0 13.1 13.2 "Final Location Survey for Imphal-Moreh rail line completed". The Hindu. 15 March 2024. Retrieved 5 July 2024.
  14. Indian Railways' Connectivity Projects in Northeast (PDF) (Report). Ministry of Railways, Govt. of India. 2023. p. 12. Retrieved 5 July 2024.
  15. 15.0 15.1 15.2 "Imphal-Moreh rail line to boost India-Myanmar trade". The Times of India. 10 February 2024. Retrieved 5 July 2024.
  16. 16.0 16.1 16.2 Singh, Bikash (22 May 2024). "Security hurdles delay Imphal-Moreh rail project". The Economic Times. Retrieved 5 July 2024.
  17. 18.0 18.1 18.2 "Imphal-Aizawl rail link survey faces hurdles". The Hindu. 12 June 2023. Retrieved 10 July 2025.
  18. 19.0 19.1 19.2 "Mizoram CM seeks Centre's approval for Imphal-Aizawl rail line" (Press release). Press Information Bureau. 5 November 2024. Retrieved 10 July 2025.
  19. 20.0 20.1 20.2 Indian Railways' Vision 2047: Northeast Connectivity (PDF) (Report). Ministry of Railways. 2024. p. 23. Retrieved 10 July 2025.
  20. 21.0 21.1 21.2 Northeast Rail Network Expansion Plan 2040 (PDF) (Report). Ministry of Railways. January 2025. p. 34. Retrieved 9 July 2025.
  21. 22.0 22.1 22.2 Northeast Infrastructure Vision 2040 (PDF) (Report). Ministry of Development of North Eastern Region. 2024. p. 67. Retrieved 9 July 2025.
  22. 23.0 23.1 Baruah, S. (April 2025). "Geopolitics of Northeast India's Rail Connectivity". Economic and Political Weekly. 60 (15): 22–25. ISSN 0012-9976.