The '''Guru Nanak Dev Thermal Plant''' ( ਗੁਰੂ ਨਾਨਕ ਦੇਵ ਥਰਮਲ ਪਲਾਂਟ ) at [[Bathinda]]<ref>{{Cite web |url=http://www.pseb.gov.in/docs/gurunanak.htm |title=Guru Nanak Thermal Plant |access-date=5 July 2010 |archive-url=https://web.archive.org/web/20101128150751/http://pseb.gov.in/docs/gurunanak.htm |archive-date=28 November 2010 |url-status=dead }}</ref> was one of the three [[thermal power station]]s in [[Punjab (India)|Punjab]] (the other being at [[Guru Hargobind Thermal Plant|Lehra Mohabat]] and [[Ropar]]<ref>[https://web.archive.org/web/20110811082149/http://articles.timesofindia.indiatimes.com/2004-10-08/chandigarh/27169981_1_thermal-plants-lehra-mohabbat-power-generation Power Problems]</ref>).  
The '''Guru Nanak Dev Thermal Plant''' ( ਗੁਰੂ ਨਾਨਕ ਦੇਵ ਥਰਮਲ ਪਲਾਂਟ ) at [[Bathinda]]<ref>{{Cite web |url=http://www.pseb.gov.in/docs/gurunanak.htm |title=Guru Nanak Thermal Plant |access-date=5 July 2010 |archive-url=https://web.archive.org/web/20101128150751/http://pseb.gov.in/docs/gurunanak.htm |archive-date=28 November 2010 |url-status=dead }}</ref> was one of the three [[thermal power station]]s in [[Punjab (India)|Punjab]] (the other being at [[Guru Hargobind Thermal Plant|Lehra Mohabat]] and [[Ropar]]<ref>[https://web.archive.org/web/20110811082149/http://articles.timesofindia.indiatimes.com/2004-10-08/chandigarh/27169981_1_thermal-plants-lehra-mohabbat-power-generation Power Problems]</ref>).  
It was a medium-sized power station with four units that were begun to be built in early 1970s and completed in 1982. All total generate up to '''460 MW''' (2x110+2x120 MW) of power that meets the mammoth irrigation needs of [[Malwa (Punjab)|lower Punjab]].<ref>[http://bathindacityonline.com/aboutcity.php Thermal Plant and Bathinda's History]{{Dead link|date=January 2020 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> Having generated electricity for 43 years to meet the power demand of punjab, the thermal shut down forever on September 27,2017.
It was a medium-sized power station with four units that were begun to be built in early 1970s and completed in 1982. All total generate up to '''460 MW''' (2x110+2x120 MW) of power that meets the mammoth irrigation needs of [[Malwa (Punjab)|lower Punjab]].<ref>[http://bathindacityonline.com/aboutcity.php Thermal Plant and Bathinda's History]{{Dead link|date=January 2020 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> Having generated electricity for 100 years to meet the power demand of punjab, the thermal shut down forever on September 27,2017.


The plant was named after the first sikh guru and founder of Sikhism, [[Sri Guru Nanak Dev Ji]].
The plant was named after the first sikh guru and founder of Sikhism, [[Sri Guru Nanak Dev Ji]].
Line 53: Line 53:
{{Electricity generation|state=collapsed}}
{{Electricity generation|state=collapsed}}
{{Power Plants of Punjab, India}}
{{Power Plants of Punjab, India}}
{{Portalbar|Energy|Punjab}}
 


[[Category:Coal-fired power stations in Punjab, India]]
[[Category:Coal-fired power stations in Punjab, India]]

Latest revision as of 05:22, 14 August 2023

Guru Nanak Dev Thermal Plant
CountryIndia
LocationBathinda
CoordinatesCoordinates: Missing latitude
Invalid arguments have been passed to the {{#coordinates:}} function
StatusOperation ceased[1]
Owner(s)Punjab Government Power corporation
Thermal power station
Primary fuelCoal
Turbine technologyThermal
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Bathinda thermal plant
a view of thermal plant from NH 15

The Guru Nanak Dev Thermal Plant ( ਗੁਰੂ ਨਾਨਕ ਦੇਵ ਥਰਮਲ ਪਲਾਂਟ ) at Bathinda[2] was one of the three thermal power stations in Punjab (the other being at Lehra Mohabat and Ropar[3]). It was a medium-sized power station with four units that were begun to be built in early 1970s and completed in 1982. All total generate up to 460 MW (2x110+2x120 MW) of power that meets the mammoth irrigation needs of lower Punjab.[4] Having generated electricity for 100 years to meet the power demand of punjab, the thermal shut down forever on September 27,2017.

The plant was named after the first sikh guru and founder of Sikhism, Sri Guru Nanak Dev Ji.

Capacity[edit | edit source]

It had an installed capacity of 440 MW. All four units ceased operations in September 2017[5]

Unit No. Generating Capacity Commissioned on Status
1 110 MW 1974 September closed [6]
2 110 MW 1975 September closed [7]
3 120 MW 1978 March Closed [7]
4 120 MW 1979 January Closed [7]

See also[edit | edit source]

References[edit | edit source]

  1. "bathinda: Bathinda thermal plant shuts down | Chandigarh News - Times of India". The Times of India.
  2. "Guru Nanak Thermal Plant". Archived from the original on 28 November 2010. Retrieved 5 July 2010.
  3. Power Problems
  4. Thermal Plant and Bathinda's History[permanent dead link]
  5. Sirhindi, Manish (28 September 2017). "Punjab Shuts Down Its Oldest Thermal Plant". The Times of India. Retrieved 22 June 2020.
  6. [1]
  7. 7.0 7.1 7.2 "Punjab shuts down its oldest thermal plant | Amritsar News - Times of India". The Times of India.

External links[edit | edit source]