>GreenC bot Rescued 1 archive link. Wayback Medic 2.5 |
robot: Create/update articles. If there is a mistake please report on my talk page. |
||
| (One intermediate revision by the same user not shown) | |||
| Line 4: | Line 4: | ||
}} | }} | ||
{{Infobox ship image | {{Infobox ship image | ||
| Ship image = | | Ship image = INS Tej (F45) at sea.jpg | ||
| Ship caption = INS ''Teg'' | | Ship caption = INS ''Teg'' at sea | ||
}} | }} | ||
{{Infobox ship career | {{Infobox ship career | ||
| Line 34: | Line 34: | ||
| Hide header = | | Hide header = | ||
| Header caption = | | Header caption = | ||
| Ship class = {{sclass | | Ship class = {{sclass|Talwar|frigate}} | ||
| Ship displacement = *{{convert|3620|LT|t|0|lk=in|abbr=on}} standard | | Ship displacement = *{{convert|3620|LT|t|0|lk=in|abbr=on}} standard | ||
*{{convert|4035|LT|t|0|abbr=on}} full load | *{{convert|4035|LT|t|0|abbr=on}} full load | ||
| Line 62: | Line 62: | ||
| Ship armament = *'''Anti-air missiles:''' | | Ship armament = *'''Anti-air missiles:''' | ||
*24 × [[Buk missile system|Shtil-1]] medium range missiles | *24 × [[Buk missile system|Shtil-1]] medium range missiles | ||
*8 × [[9K38 Igla#Igla-1|Igla-1E]] ([[SA- | *8 × [[9K38 Igla#Igla-1|Igla-1E]] ([[9K38 Igla|SA-18]]) | ||
*'''Anti-ship/Land-attack missiles:''' | *'''Anti-ship/Land-attack missiles:''' | ||
*8 × VLS launched [[BrahMos]], anti-ship cruise missiles | *8 × VLS launched [[BrahMos]], anti-ship cruise missiles | ||
| Line 78: | Line 78: | ||
|} | |} | ||
'''INS ''Teg'' (F45)''' is the fourth {{sclass | '''INS ''Teg'' (F45)''' is the fourth {{sclass|Talwar|frigate}} constructed for the [[Indian Navy]]. She was built by the Yantar shipyard in [[Kaliningrad]], [[Russia]],<ref name="st"/> and was commissioned to Navy service on 27 April 2012.<ref name="commission">{{cite web | title = Indian Navy inducts stealth warship INS Teg |url = http://ibnlive.in.com/news/indian-navy-to-induct-warship-ins-teg-today/252666-3.html |archive-url = https://web.archive.org/web/20120430091255/http://ibnlive.in.com/news/indian-navy-to-induct-warship-ins-teg-today/252666-3.html |url-status = dead |archive-date = 30 April 2012 | publisher = IBN Live | access-date=27 April 2012 | date = 27 April 2012}}</ref> She is the first of the second batch of {{sclass|Talwar|frigate|1}}s to be completed. | ||
==Design== | ==Design== | ||
{{Main|Talwar-class frigate}} | {{Main|Talwar-class frigate}} | ||
''Teg'' belongs to the {{sclass | ''Teg'' belongs to the {{sclass|Talwar|frigate|4}} of [[frigate]]s. The ''Talwar''-class guided missile frigates are modified [[Krivak-class frigate|Krivak III-class]] frigates built by [[Russia]]. These ships use stealth technologies and a special [[hull (watercraft)|hull]] design to ensure a reduced radar cross section. Much of the equipment on the ship is Russian-made, but a significant number of systems of Indian origin have also been incorporated. The main differences between ''Teg'' and the earlier ''Talwar''-class ships are the use of [[BrahMos]] missiles in place of the [[Klub-N]] missiles and the use of [[AK-630]] instead of [[Kashtan CIWS|Kashtan]] in the earlier ships.<ref name="ria">{{cite web|url=http://en.rian.ru/russia/20091127/157012714.html |title=Russia floats out first frigate for Indian Navy |publisher=[[RIA Novosti]] |date=27 November 2009 |access-date=6 April 2011}}</ref> It is the first of the three frigates built in [[Russia]] as a follow-up order to the first batch of Talwar-class frigates. | ||
==Construction== | ==Construction== | ||
''Teg'' was laid down on 27 July 2007<ref name="st"/> and launched on 27 November 2009.<ref name="ria"/> Following post-construction work, she began sea trials in the [[Baltic Sea]] on 1 September 2011.<ref>{{cite web |title=Russia begins trials of stealth frigate for Indian Navy |url=http://articles.economictimes.indiatimes.com/2011-09-01/news/29953755_1_stealth-frigates-new-frigates-talwar-class |work=Economic Times|access-date=10 December 2011 |archive-url=https:// | ''Teg'' was laid down on 27 July 2007<ref name="st"/> and launched on 27 November 2009.<ref name="ria"/> Following post-construction work, she began sea trials in the [[Baltic Sea]] on 1 September 2011.<ref>{{cite web |title=Russia begins trials of stealth frigate for Indian Navy |url=http://articles.economictimes.indiatimes.com/2011-09-01/news/29953755_1_stealth-frigates-new-frigates-talwar-class |work=Economic Times|access-date=10 December 2011 |archive-url=https://web.archive.org/web/20140202125440/http://articles.economictimes.indiatimes.com/2011-09-01/news/29953755_1_stealth-frigates-new-frigates-talwar-class |archive-date=2 February 2014 |date=1 September 2011 |url-status=dead }}</ref> During ''Teg''{{'}}s sea trials in mid-October, her port-side turbine was damaged, forcing a two-week delay in her trials schedule while repairs were made.<ref name="st">{{cite web |title=Russia: INS Teg Receives New Cruising Turbine at Yantar Shipyard and Continues Sea Trials |url=http://shipbuildingtribune.com/2011/11/16/russia-ins-teg-receives-new-cruising-turbine-at-yantar-shipyard-and-continues-sea-trials/ |publisher=Shipbuilding Tribune |access-date=11 December 2011 |archive-url=https://web.archive.org/web/20120515124443/http://shipbuildingtribune.com/2011/11/16/russia-ins-teg-receives-new-cruising-turbine-at-yantar-shipyard-and-continues-sea-trials/ |archive-date=15 May 2012 |date=16 November 2011 |url-status=dead }}</ref> ''Teg'' completed her sea trials in early December 2011, leaving only acceptance trials before her delivery to the Indian Navy in April 2012.<ref>{{cite web |title=Indian Navy’s Frigate Successfully Passes Last Trials Before Delivery |url=http://shipbuildingtribune.com/2011/12/09/indian-navys-frigate-successfully-passes-last-trials-before-delivery/ |publisher=Shipbuilding Tribune |access-date=11 December 2011 |archive-url=https://web.archive.org/web/20120430040612/http://shipbuildingtribune.com/2011/12/09/indian-navys-frigate-successfully-passes-last-trials-before-delivery/ |archive-date=30 April 2012 |date=9 December 2011 |url-status=dead }}</ref> These trials were completed in early February 2012.<ref>{{cite web |title=Yantar Shipyard Finishes Sea Trails (sic) for Indian Navy’s Fourth Talwar Class Frigate |url=http://shipbuildingtribune.com/2012/02/08/yantar-shipyard-finishes-sea-trails-for-indian-navys-fourth-talwar-class-frigate/ |publisher=Shipbuilding Tribune |access-date=9 February 2012 |archive-url=https://web.archive.org/web/20120210094226/http://shipbuildingtribune.com/2012/02/08/yantar-shipyard-finishes-sea-trails-for-indian-navys-fourth-talwar-class-frigate/ |archive-date=10 February 2012 |date=8 February 2012 |url-status=dead }}</ref> | ||
INS ''Teg'' was commissioned into the Indian Navy on 27 April 2012, at the Yantar shipyard at Kaliningrad in Russia.<ref name="commission"/> She was commissioned by Vice Admiral KN Sushil, Flag Officer Commanding-in-Chief, Southern Naval Command with Captain Rakesh Kumar Dahiya serving as her first commanding officer.<ref name="commission-pr">{{cite web|title=Indian Naval Ship 'Teg' commissioned into Indian Navy|url=http://www.indiannavy.nic.in/PRel_120427_INSTeg-commissioned.pdf|publisher=Indian Navy|access-date=28 April 2012|date=27 April 2012}}</ref> | INS ''Teg'' was commissioned into the Indian Navy on 27 April 2012, at the Yantar shipyard at Kaliningrad in Russia.<ref name="commission"/> She was commissioned by Vice Admiral KN Sushil, Flag Officer Commanding-in-Chief, Southern Naval Command with Captain Rakesh Kumar Dahiya serving as her first commanding officer.<ref name="commission-pr">{{cite web|title=Indian Naval Ship 'Teg' commissioned into Indian Navy|url=http://www.indiannavy.nic.in/PRel_120427_INSTeg-commissioned.pdf|publisher=Indian Navy|access-date=28 April 2012|date=27 April 2012}}</ref> | ||
Latest revision as of 05:08, 26 June 2022
![]() INS Teg at sea
| |
| History | |
|---|---|
| Name: | INS Teg |
| Namesake: | Saber |
| Ordered: | 14 July 2007[1] |
| Builder: | Yantar Shipyard |
| Laid down: | July 2007 |
| Launched: | 27 November 2009 |
| Acquired: | 1 September 2011 |
| Commissioned: | 27 April 2012 |
| Motto: | "Towards Eternal Glory"[2] |
| Status: | in active service |
| Badge: | INS Teg seal |
| General characteristics | |
| Class and type: | -class frigate |
| Displacement: |
|
| Length: | 124.8 m (409 ft 5 in) |
| Beam: | 15.2 m (49 ft 10 in) |
| Draught: | 4.5 m (14 ft 9 in) |
| Propulsion: | |
| Speed: | 30 kn (56 km/h; 35 mph) |
| Range: |
|
| Complement: | 180 (18 officers) |
| Armament: | |
| Aircraft carried: | 1 × Ka-28 Helix-A, Ka-31 Helix B or HAL Dhruv helicopter |
INS Teg (F45) is the fourth -class frigate constructed for the Indian Navy. She was built by the Yantar shipyard in Kaliningrad, Russia,[4] and was commissioned to Navy service on 27 April 2012.[5] She is the first of the second batch of -class frigates to be completed.
Design[edit | edit source]
Teg belongs to the class of frigates. The Talwar-class guided missile frigates are modified Krivak III-class frigates built by Russia. These ships use stealth technologies and a special hull design to ensure a reduced radar cross section. Much of the equipment on the ship is Russian-made, but a significant number of systems of Indian origin have also been incorporated. The main differences between Teg and the earlier Talwar-class ships are the use of BrahMos missiles in place of the Klub-N missiles and the use of AK-630 instead of Kashtan in the earlier ships.[6] It is the first of the three frigates built in Russia as a follow-up order to the first batch of Talwar-class frigates.
Construction[edit | edit source]
Teg was laid down on 27 July 2007[4] and launched on 27 November 2009.[6] Following post-construction work, she began sea trials in the Baltic Sea on 1 September 2011.[7] During Teg's sea trials in mid-October, her port-side turbine was damaged, forcing a two-week delay in her trials schedule while repairs were made.[4] Teg completed her sea trials in early December 2011, leaving only acceptance trials before her delivery to the Indian Navy in April 2012.[8] These trials were completed in early February 2012.[9]
INS Teg was commissioned into the Indian Navy on 27 April 2012, at the Yantar shipyard at Kaliningrad in Russia.[5] She was commissioned by Vice Admiral KN Sushil, Flag Officer Commanding-in-Chief, Southern Naval Command with Captain Rakesh Kumar Dahiya serving as her first commanding officer.[2]
References[edit | edit source]
- ↑ "Modified Krivak III Class".
- ↑ 2.0 2.1 "Indian Naval Ship 'Teg' commissioned into Indian Navy" (PDF). Indian Navy. 27 April 2012. Retrieved 28 April 2012.
- ↑ 4.0 4.1 4.2 "Russia: INS Teg Receives New Cruising Turbine at Yantar Shipyard and Continues Sea Trials". Shipbuilding Tribune. 16 November 2011. Archived from the original on 15 May 2012. Retrieved 11 December 2011.
- ↑ 5.0 5.1 "Indian Navy inducts stealth warship INS Teg". IBN Live. 27 April 2012. Archived from the original on 30 April 2012. Retrieved 27 April 2012.
- ↑ 6.0 6.1 "Russia floats out first frigate for Indian Navy". RIA Novosti. 27 November 2009. Retrieved 6 April 2011.
- ↑ "Russia begins trials of stealth frigate for Indian Navy". Economic Times. 1 September 2011. Archived from the original on 2 February 2014. Retrieved 10 December 2011.
- ↑ "Indian Navy's Frigate Successfully Passes Last Trials Before Delivery". Shipbuilding Tribune. 9 December 2011. Archived from the original on 30 April 2012. Retrieved 11 December 2011.
- ↑ "Yantar Shipyard Finishes Sea Trails (sic) for Indian Navy's Fourth Talwar Class Frigate". Shipbuilding Tribune. 8 February 2012. Archived from the original on 10 February 2012. Retrieved 9 February 2012.
