Makar-class survey catamaran: Difference between revisions

robot: Create/update articles. If there is a mistake please report on my talk page.
(robot: Create/upgrade articles. If there is a mistake please report on my talk page.)
(robot: Create/update articles. If there is a mistake please report on my talk page.)
 
Line 1: Line 1:
{{Short description|Catamarans of the Indian Navy}}
{{Short description|Catamarans of the Indian Navy}}
{{EngvarB|date=January 2022}}
{{EngvarB|date=January 2014}}
{{Use dmy dates|date=January 2022}}
{{Use dmy dates|date=January 2014}}


{|{{Infobox ship begin}}
{|{{Infobox ship begin}}
Line 15: Line 15:
|Class after          =  {{sclass|GRSE|survey vessel|4}}
|Class after          =  {{sclass|GRSE|survey vessel|4}}
|Subclasses            =
|Subclasses            =
|Cost                  =  {{INRConvert|800|c|0}}<ref name=dnai3m>{{cite news|title=Gujarat builds 1st survey catamarans for Indian navy|url=http://www.dnaindia.com/india/report-gujarat-builds-1st-survey-catamarans-for-indian-navy-1354613|access-date=15 December 2013|newspaper=DNA India|date=3 March 2022}}</ref>
|Cost                  =  {{INRConvert|800|c|0}}<ref name=dnai3m>{{cite news|title=Gujarat builds 1st survey catamarans for Indian navy|url=http://www.dnaindia.com/india/report-gujarat-builds-1st-survey-catamarans-for-indian-navy-1354613|access-date=15 December 2013|newspaper=DNA India|date=3 March 2010}}</ref>
|Built range          =
|Built range          =
|In service range      =
|In service range      =
Line 46: Line 46:
|Ship sail plan        =
|Ship sail plan        =
|Ship speed            =*Cruising speed: {{convert|12|kn}}
|Ship speed            =*Cruising speed: {{convert|12|kn}}
*Maximum speed: {{convert|18|kn}}<ref name=gm4m>{{cite news|title=Alcock Ashdown Gujarat Ltd develops first Survey Catamarans for Indian navy|url=http://gujaratmoney.com/2010/03/04/alcock-ashdown-gujarat-ltd-develops-first-survey-catamarans-for-indian-navy/|access-date=15 December 2013|newspaper=Gujarat Money|date=4 March 2022}}</ref>
*Maximum speed: {{convert|18|kn}}<ref name=gm4m>{{cite news|title=Alcock Ashdown Gujarat Ltd develops first Survey Catamarans for Indian navy|url=http://gujaratmoney.com/2010/03/04/alcock-ashdown-gujarat-ltd-develops-first-survey-catamarans-for-indian-navy/|access-date=15 December 2013|newspaper=Gujarat Money|date=4 March 2010}}</ref>
|Ship range            = {{convert|3000|nmi}} at economic cruising
|Ship range            = {{convert|3000|nmi}} at economic cruising
|Ship endurance        =
|Ship endurance        =
Line 74: Line 74:


==Construction==
==Construction==
Alcock Ashdown (Gujarat) Ltd was awarded this contract, worth {{INRConvert|800|c|0}}<ref name=dnai3m/> on 28 December 2006 through open competitive bidding, beating others like [[Larsen & Toubro]], [[ABG Shipyard]] and [[Garden Reach Shipbuilders & Engineers]]. As per original term of contract, the first vessel was to be delivered by 6 April 2009, while the remaining five vessels were to be delivered within a year from 6 July 2009. This was later rescheduled, the revised delivery period of vessels is from September 2011 to March 2013.{{citation needed|date=March 2022}}
Alcock Ashdown (Gujarat) Ltd was awarded this contract, worth {{INRConvert|800|c|0}}<ref name=dnai3m/> on 28 December 2006 through open competitive bidding, beating others like [[Larsen & Toubro]], [[ABG Shipyard]] and [[Garden Reach Shipbuilders & Engineers]]. As per original term of contract, the first vessel was to be delivered by 6 April 2009, while the remaining five vessels were to be delivered within a year from 6 July 2009. This was later rescheduled, the revised delivery period of vessels is from September 2011 to March 2013.{{citation needed|date=March 2017}}
The INS Meen is under construction. The remaining four are awaiting administrative clarification.<ref>{{Cite web|url=http://bcshippingnews.com/ships-shipyards/makar-class-survey-catamaran-indian-navy|title = BC Shipping News – Magazine}}</ref>
The INS Meen is under construction. The remaining four are awaiting administrative clarification.<ref>{{Cite web|url=http://bcshippingnews.com/ships-shipyards/makar-class-survey-catamaran-indian-navy|title = BC Shipping News – Magazine}}</ref>


Line 96: Line 96:
|21 September 2012
|21 September 2012
|[[INS Kadamba|Karwar]]
|[[INS Kadamba|Karwar]]
|<ref name="thehindu">{{cite news|title=Hydrographic survey vessel commissioned|url=http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/hydrographic-survey-vessel-commissioned/article3925097.ece|access-date=1 September 2013|newspaper=The Hindu|date=22 September 2022}}</ref>
|<ref name="thehindu">{{cite news|title=Hydrographic survey vessel commissioned|url=http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/hydrographic-survey-vessel-commissioned/article3925097.ece|access-date=1 September 2013|newspaper=The Hindu|date=22 September 2012}}</ref>
|-
|-
|}
|}