>Dawnseeker2000 m date format audit, minor formatting |
>BattyBot m →top: Removed/fixed incorrect author parameter(s), performed general fixes |
||
| Line 17: | Line 17: | ||
}} | }} | ||
'''Amaravati Seed Capital Road or ASC Road''' is an ongoing arterial [[Flyover (road)|flyover]] road project and a part of ''Amaravati Seed Access Road Network'' to connect the city of [[Vijayawada]] with [[Amaravati]].<ref>{{cite news|title=Eight-lane road to connect Vijayawada, Amaravati|url=http://www.thehansindia.com/posts/index/Andhra-Pradesh/2016-10-17/Eight-lane-road-to-connect-Vijayawada-Amaravati/259214|accessdate=17 January 2017|work=The Hans India}}</ref><ref>{{cite news| | '''Amaravati Seed Capital Road or ASC Road''' is an ongoing arterial [[Flyover (road)|flyover]] road project and a part of ''Amaravati Seed Access Road Network'' to connect the city of [[Vijayawada]] with [[Amaravati]].<ref>{{cite news|title=Eight-lane road to connect Vijayawada, Amaravati|url=http://www.thehansindia.com/posts/index/Andhra-Pradesh/2016-10-17/Eight-lane-road-to-connect-Vijayawada-Amaravati/259214|accessdate=17 January 2017|work=The Hans India}}</ref><ref>{{cite news|author=Staff Reporter|title=Seed capital access roads in tendering stage|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/Seed-capital-access-roads-in-tendering-stage/article17291422.ece|accessdate=3 May 2017|work=The Hindu|language=en}}</ref> It is built by the [[Andhra Pradesh Capital Region Development Authority]] (APCRDA) with an estimated cost of {{INRConvert|2.3|b}} and has a total length of {{Convert|21|km|mi|abbr=on}}.<ref>{{cite news|title=High-speed road to Amaravati|url=http://www.deccanchronicle.com/nation/current-affairs/260616/high-speed-road-to-amaravati.html|accessdate=29 June 2016|work=Deccan Chronicle|date=26 June 2016}}</ref><ref>{{cite news|title=AP government clips wings of CRDA|url=http://timesofindia.indiatimes.com/city/hyderabad/AP-government-clips-wings-of-CRDA/articleshow/51818302.cms|accessdate=29 June 2016|work=The Times of India|date=14 April 2016}}</ref> | ||
== Phase–I == | == Phase–I == | ||
Latest revision as of 05:11, 2 July 2021
| Amaravati Seed Capital Road | |
|---|---|
| Route information | |
| Length | 21 km (13 mi) |
| Major junctions | |
| West end | Dondapadu |
| East end | Kanakadurga Varadhi junction (National Highway 16) |
| Highway system | |
|
| |
Amaravati Seed Capital Road or ASC Road is an ongoing arterial flyover road project and a part of Amaravati Seed Access Road Network to connect the city of Vijayawada with Amaravati.[1][2] It is built by the Andhra Pradesh Capital Region Development Authority (APCRDA) with an estimated cost of ₹2.3 billion (US$32 million) and has a total length of 21 km (13 mi).[3][4]
Phase–I[edit | edit source]
The proposed phase–I of the road will be constructed for a length of 18.3 km (11.4 mi) between Dondapadu–near Kondaveetivagu by the end of 2018.[5]
References[edit | edit source]
- ↑ "Eight-lane road to connect Vijayawada, Amaravati". The Hans India. Retrieved 17 January 2017.
- ↑ Staff Reporter. "Seed capital access roads in tendering stage". The Hindu. Retrieved 3 May 2017.
- ↑ "High-speed road to Amaravati". Deccan Chronicle. 26 June 2016. Retrieved 29 June 2016.
- ↑ "AP government clips wings of CRDA". The Times of India. 14 April 2016. Retrieved 29 June 2016.
- ↑ "CM allots first lot of plots in Amaravati". The Hindu. 26 June 2016. Retrieved 29 June 2016.