Amaravati seed capital road: Difference between revisions

Created by Dawnseeker2000
Last edited July 2, 2021
>Dawnseeker2000
m date format audit, minor formatting
 
>BattyBot
m top: Removed/fixed incorrect author parameter(s), performed general fixes
 
Line 17: Line 17:
}}
}}


'''Amaravati Seed Capital Road or ASC Road''' is an ongoing arterial [[Flyover (road)|flyover]] road project and a part of ''Amaravati Seed Access Road Network'' to connect the city of [[Vijayawada]] with [[Amaravati]].<ref>{{cite news|title=Eight-lane road to connect Vijayawada, Amaravati|url=http://www.thehansindia.com/posts/index/Andhra-Pradesh/2016-10-17/Eight-lane-road-to-connect-Vijayawada-Amaravati/259214|accessdate=17 January 2017|work=The Hans India}}</ref><ref>{{cite news|last1=Reporter|first1=Staff|title=Seed capital access roads in tendering stage|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/Seed-capital-access-roads-in-tendering-stage/article17291422.ece|accessdate=3 May 2017|work=The Hindu|language=en}}</ref> It is built by the [[Andhra Pradesh Capital Region Development Authority]] (APCRDA) with an estimated cost of {{INRConvert|2.3|b}} and has a total length of {{Convert|21|km|mi|abbr=on}}.<ref>{{cite news|title=High-speed road to Amaravati|url=http://www.deccanchronicle.com/nation/current-affairs/260616/high-speed-road-to-amaravati.html|accessdate=29 June 2016|work=Deccan Chronicle|date=26 June 2016}}</ref><ref>{{cite news|title=AP government clips wings of CRDA|url=http://timesofindia.indiatimes.com/city/hyderabad/AP-government-clips-wings-of-CRDA/articleshow/51818302.cms|accessdate=29 June 2016|work=The Times of India|date=14 April 2016}}</ref>
'''Amaravati Seed Capital Road or ASC Road''' is an ongoing arterial [[Flyover (road)|flyover]] road project and a part of ''Amaravati Seed Access Road Network'' to connect the city of [[Vijayawada]] with [[Amaravati]].<ref>{{cite news|title=Eight-lane road to connect Vijayawada, Amaravati|url=http://www.thehansindia.com/posts/index/Andhra-Pradesh/2016-10-17/Eight-lane-road-to-connect-Vijayawada-Amaravati/259214|accessdate=17 January 2017|work=The Hans India}}</ref><ref>{{cite news|author=Staff Reporter|title=Seed capital access roads in tendering stage|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/Seed-capital-access-roads-in-tendering-stage/article17291422.ece|accessdate=3 May 2017|work=The Hindu|language=en}}</ref> It is built by the [[Andhra Pradesh Capital Region Development Authority]] (APCRDA) with an estimated cost of {{INRConvert|2.3|b}} and has a total length of {{Convert|21|km|mi|abbr=on}}.<ref>{{cite news|title=High-speed road to Amaravati|url=http://www.deccanchronicle.com/nation/current-affairs/260616/high-speed-road-to-amaravati.html|accessdate=29 June 2016|work=Deccan Chronicle|date=26 June 2016}}</ref><ref>{{cite news|title=AP government clips wings of CRDA|url=http://timesofindia.indiatimes.com/city/hyderabad/AP-government-clips-wings-of-CRDA/articleshow/51818302.cms|accessdate=29 June 2016|work=The Times of India|date=14 April 2016}}</ref>


== Phase–I ==
== Phase–I ==

Latest revision as of 05:11, 2 July 2021

Amaravati Seed Capital Road
Route information
Length21 km (13 mi)
Major junctions
West endDondapadu
East endKanakadurga Varadhi junction (National Highway 16)
Highway system

Amaravati Seed Capital Road or ASC Road is an ongoing arterial flyover road project and a part of Amaravati Seed Access Road Network to connect the city of Vijayawada with Amaravati.[1][2] It is built by the Andhra Pradesh Capital Region Development Authority (APCRDA) with an estimated cost of 2.3 billion (US$32 million) and has a total length of 21 km (13 mi).[3][4]

Phase–I[edit | edit source]

The proposed phase–I of the road will be constructed for a length of 18.3 km (11.4 mi) between Dondapadu–near Kondaveetivagu by the end of 2018.[5]

References[edit | edit source]

  1. "Eight-lane road to connect Vijayawada, Amaravati". The Hans India. Retrieved 17 January 2017.
  2. Staff Reporter. "Seed capital access roads in tendering stage". The Hindu. Retrieved 3 May 2017.
  3. "High-speed road to Amaravati". Deccan Chronicle. 26 June 2016. Retrieved 29 June 2016.
  4. "AP government clips wings of CRDA". The Times of India. 14 April 2016. Retrieved 29 June 2016.
  5. "CM allots first lot of plots in Amaravati". The Hindu. 26 June 2016. Retrieved 29 June 2016.