Created by Jessicapierce
Last edited September 22, 2021
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Guntur–Krishna Canal section
Guntur Junction the starting point of Guntur–Krishna Canal section
Overview
StatusOperational
OwnerIndian Railways
LocaleAndhra Pradesh
TerminiKrishna Canal
Guntur
Service
Operator(s)South Coast Railway
History
Opened1966; 60 years ago (1966)
Technical
Line length25.36 km (15.76 mi)
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Route map
Template:Guntur–Krishna Canal section

The Guntur–Krishna Canal section is a section of Indian Railways. It connects Krishna Canal with Guntur and further, it also connects Howrah–Chennai main line at Krishna Canal, Guntur–Macherla section, Guntur–Tenali section, Tenali–Macherla sections at Guntur Junction.[1]

History

Vijayawada to Guntur broad-gauge section was opened in 1966.[2]

Jurisdiction

It is an electrified double-track railway having a length of 25.36 km (15.76 mi).[3]

References

  1. ↑ "Operations scenario" (PDF). South Central Railway. Retrieved 18 January 2016.
  2. ↑ "Time Line and Milestones of Events". South Central Railway. Retrieved 5 February 2015.
  3. ↑ "Jurisdiction of Guntur Division" (PDF). South Central Railway. Retrieved 24 May 2017.