Gorakhpur–Lokmanya Tilak Terminus Superfast Express

From Bharatpedia, an open encyclopedia
Revision as of 01:00, 7 August 2021 by imported>Colonies Chris (minor fixes, replaced: - → – (11), {{rws| → {{stnlnk| (15), {{RailGauge| → {{track gauge|, LHB CoachesLHB coaches, WAP 4 → WAP-4 (4), Gorakhpur Junction → {{stnlnk|Gorakhpur Junction)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Sant Kabir Dham Superfast Express
File:LTT-GKP SF Exp.jpg
Overview
Service typeSuperfast Express
LocaleUttar Pradesh, Madhya Pradesh & Maharashtra
First service7 February 2010; 15 years ago (2010-02-07)
Current operator(s)Northern Eastern Railways
Route
StartGorakhpur Junction (GKP)
Stops15
EndLokmanya Tilak Terminus (LTT)
Distance travelled1,692 km (1,051 mi)
Average journey time30 hours 10 minutes
Service frequencyDaily
Train number(s)12541 / 12542
On-board services
Class(es)2A, 3A, SL, UR/GEN
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable
Observation facilitiesLarge windows
Baggage facilitiesYes
Technical
Rolling stockLHB coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed58 km/h (36 mph) average including halts

The 12541 / 12542 Gorakhpur–Lokmanya Tilak Terminus Sant Kabir Dham Superfast Express is a Superfast Express train belonging to Indian Railways that runs between Gorakhpur Junction and Lokmanya Tilak Terminus, Kurla (Mumbai) via Basti in India. It operates as train number 12541 from Gorakhpur Junction to Lokmanya Tilak Terminus and as train number 12542 in the reverse direction.

Coaches[edit]

12541/12542 Gorakhpur Junction–Lokmanya Tilak Terminus Sant Kabir Dham Superfast Express presently has 2 AC 2 tier, 3 AC 3 tier, 9 Sleeper class, 5 General Unreserved coaches & 1 Pantry car. As with most train services in India, coach composition may be amended at the discretion of Indian Railways depending on demand.

Service[edit]

12541 Gorakhpur Junction–Lokmanya Tilak Terminus Sant Kabir Dham Superfast Express covers the distance of 1680 kilometres in 30 hours 25 mins (55.23 km/hr) & 1683 kilometres in 30 hours 00 mins as 12542 Lokmanya Tilak Terminus Gorakhpur Junction Sant Kabir Dham Superfast Express (56.10 km/hr). As the average speed of the train is more than 55 km/hr, its fare includes a Superfast surcharge

It goes via Aishbagh Badshah Nagar route without reversing its direction at Lucknow Jct.

Route & halts[edit]

Traction[edit]

It is hauled by a Bhusawal-based WAP-4 or Kalyan-based WAP-7 locomotive in both directions.

Gallery[edit]

References[edit]