Shantiniketan Express

From Bharatpedia, an open encyclopedia
Revision as of 23:54, 5 July 2021 by imported>Colonies Chris (minor fixes, replaced: {{rws| → {{stnlnk| (6), {{RailGauge| → {{track gauge|, LHB CoachesLHB coaches, WAP 7 → WAP-7, Howrah Junction || 10:10 AM || 0 (Source) || Day 1 |- | 2 || BWN || [[Barddhaman Junction railway station|Bar)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Shantiniketan Express
File:Coalfield Exp.jpg
Overview
Service typeExpress
First service1 August 1985; 39 years ago (1985-08-01)
Current operator(s)Eastern Railways
Route
StartHowrah Junction (HWH)
Stops12
EndBolpur Shantiniketan (BHP)
Distance travelled146 km (91 mi)
Average journey time2 hours 15 minutes
Service frequencyDaily[lower-alpha 1]
Train number(s)12337 / 12338
On-board services
Class(es)Chair Car, General Unreserved
Seating arrangementsYes
Sleeping arrangementsNo
Catering facilitiesE-catering
Observation facilitiesLarge windows
Baggage facilitiesBelow the seats
Technical
Rolling stockLHB coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed65 km/h (40 mph) average including halts

The 12337 / 12338 Shantiniketan Express is a Express train of the Indian Railways connecting Howrah Junction in West Bengal and Bolpur Shantiniketan of West Bengal. It is currently being operated with 12337/12338 train numbers on a daily basis. [1][2]

Service[edit]

The 12337/ Shantiniketan Express has an average speed of 65 km/hr and covers 146 km in 2 hrs 15 mins. 12338/Shantiniketan Express has an average speed of 59 km/hr and 146 km in 2 hrs 30 mins.

Route & Halts[edit]

The important halts of the train are:

Schedule[edit]

12337[edit]

  • Runs daily
Sl No. Station code Station name Time (IST) Distance (km) Day
1 HWH Howrah Junction 10:10 AM 0 (Source) Day 1
2 BWN Barddhaman Jn 11:17 AM 95 Day 1
3 GKH Guskara railway station 11:57 AM 127 Day 1
4 BHP Bolpur Shantiniketan 12:30 PM 146 (Destination) Day 1

12338[edit]

  • Runs daily
Sl No. Station code Station name Time (IST) Distance (km) Day
1 BHP Bolpur Shantiniketan 1:10 PM 0 (Source) Day 1
2 GKH Guskara railway station 1:27 PM 19 Day 1
3 BWN Barddhaman Jn 2:05 PM 52 Day 1
4 HWH Howrah Junction 3:40 PM 146 (Destination) Day 1

Coach composition[edit]

The train has LHB rake. The train consists of 18 coaches:

  • 2 A.C. Chair Car
  • 1 Reserved Chair Car
  • 13 General coaches
  • 2 generator car

Traction[edit]

Both trains are hauled by a Howrah-based WAP-7 electric locomotive from Howrah to Bolpur and vice versa.

Rake sharing[edit]

It shares its rake with the Agniveena Express and the Coalfield Express.

See also[edit]

Notes[edit]

  1. Runs two days in a week for every direction.

External links[edit]

References[edit]