Teesta Low Dam - IV Hydropower Plant: Difference between revisions

Correction
(Correction)
Line 2: Line 2:
| name                =Teesta Low Dam - IV
| name                =Teesta Low Dam - IV
| name_official        =Teesta Low Dam - IV Hydropower Plant
| name_official        =Teesta Low Dam - IV Hydropower Plant
| image                = Lower Dam IV across Teesta River, AJTJ P1110110.jpg
| image                = Lower Dam IV across Teesta River, AJTJ P1110110.jpg
| image_size          =  
| image_size          =  
| image_caption        =  
| image_caption        =  
Line 44: Line 44:
| res_tidal_range      =  
| res_tidal_range      =  
| plant_operator      =  
| plant_operator      =  
| plant_commission    =2016<ref name=t/>
| plant_commission    = 2016<ref name=t/>
| plant_decommission  =  
| plant_decommission  =  
| plant_type          = R
| plant_type          = R
| plant_turbines      = 4 X 40 [[megawatt|MW]]
| plant_turbines      = 4 X 40 [[megawatt|MW]]
| plant_capacity      = 160 MW<ref name=t/>
| plant_capacity      = 160 MW<ref name=t/>
| plant_annual_gen    =720 MU<ref name=t/>  
| plant_annual_gen    = 720 MU<ref name=t/>  
| plant_net_generation=  
| plant_net_generation=  
| website              =  
| website              =  
Line 102: Line 102:


==The project==
==The project==
The project consists of a 45 m high dam with 4 penstocks of 45 m length and 7 m diameter each. The surface power house with installed capacity of 160 MW houses 4 units of 40 MW capacity each designed to operate under the net rated head of 25.05 M and designed to generate 720 million units in a 90% dependable year with 95% machine availability. Unit I, II, III and IV were commissioned in the month of February, March, July and August 2016<ref name=t>{{cite news |title=NHPC completes Teesta Low Dam-IV hydro project |url=https://energy.economictimes.indiatimes.com/news/renewable/nhpc-completes-teesta-low-dam-iv-hydro-project/53761998 |accessdate=31 January 2020 |date=19 August 2016 |language=English}}</ref><ref>{{cite news |title=BHEL starts 40-mw hydro power unit in West Bengal |url=https://economictimes.indiatimes.com/industry/energy/power/bhel-starts-40-mw-hydro-power-unit-in-west-bengal/articleshow/51120981.cms |accessdate=31 January 2020 |work=The Economic Times}}</ref> respectively. The state of [[West Bengal]] is the sole beneficiary of this power station. With the construction of the project the area is also benefited by development infrastructure, education, medical facilities and employment avenues.
The project consists of a 45 m high dam with 4 penstocks of 45 m length and 7 m diameter each. The surface powerhouse with installed capacity of 160 MW houses 4 units of 40 MW capacity each designed to operate under the net rated head of 25.05 M and designed to generate 720 million units in a 90% dependable year with 95% machine availability. Unit I, II, III and IV were commissioned in the month of February, March, July and August 2016<ref name=t>{{cite news |title=NHPC completes Teesta Low Dam-IV hydro project |url=https://energy.economictimes.indiatimes.com/news/renewable/nhpc-completes-teesta-low-dam-iv-hydro-project/53761998 |accessdate=31 January 2020 |date=19 August 2016 |language=English}}</ref><ref>{{cite news |title=BHEL starts 40-mw hydro power unit in West Bengal |url=https://economictimes.indiatimes.com/industry/energy/power/bhel-starts-40-mw-hydro-power-unit-in-west-bengal/articleshow/51120981.cms |accessdate=31 January 2020 |work=The Economic Times}}</ref> respectively. The state of [[West Bengal]] is the sole beneficiary of this power station. With the construction of the project the area is also benefited by development infrastructure, education, medical facilities and employment avenues.


== References ==