KSR Bengaluru–Ernakulam Intercity Express: Difference between revisions

m
m (robot: Import articles to fix broken redirects)
 
 
Line 46: Line 46:
It is hauled by an Golden Rock-based WDP4D (earlier Erode-based), WDG4 or WDP4B or an Erode-based WDM-3D from Bangalore to Erode. From Erode to Ernakulam, it is hauled by an Erode-based WAP-4. This train runs daily each way, as Train no: 12677 (Ernakulam Exp) departing Bangalore City Junction  at 06:10hrs and reaching Ernakulam Junction at 16:55 hrs and Train no: 12678 (Bangalore Exp) departing Ernakulam Junction at 09:10 hrs and reaching Bangalore City Junction at 19:50 hrs. It covers a distance of {{convert|587|km}} in each direction and the journey duration is about 10 hours and 40 minutes. It runs with an ICF rake. The [[Rake (train)|rake]] of the train usually contains 4 unreserved coaches, 11 second sitting coaches, 2 AC chair car coaches, a pantry car, a high-capacity parcel van, and 2 SLR cars, making a total of 21 coaches. It is running due to the [[COVID-19 pandemic]] as 02677/02678 and is hauled by a Golden Rock-based WDP4D or WDP4B throughout the journey.  
It is hauled by an Golden Rock-based WDP4D (earlier Erode-based), WDG4 or WDP4B or an Erode-based WDM-3D from Bangalore to Erode. From Erode to Ernakulam, it is hauled by an Erode-based WAP-4. This train runs daily each way, as Train no: 12677 (Ernakulam Exp) departing Bangalore City Junction  at 06:10hrs and reaching Ernakulam Junction at 16:55 hrs and Train no: 12678 (Bangalore Exp) departing Ernakulam Junction at 09:10 hrs and reaching Bangalore City Junction at 19:50 hrs. It covers a distance of {{convert|587|km}} in each direction and the journey duration is about 10 hours and 40 minutes. It runs with an ICF rake. The [[Rake (train)|rake]] of the train usually contains 4 unreserved coaches, 11 second sitting coaches, 2 AC chair car coaches, a pantry car, a high-capacity parcel van, and 2 SLR cars, making a total of 21 coaches. It is running due to the [[COVID-19 pandemic]] as 02677/02678 and is hauled by a Golden Rock-based WDP4D or WDP4B throughout the journey.  


For first time, from July 2nd 2022, full end-to-end run with electric locomotive run has started using a "WAP-7"(locomotive) based out of [[Electric Loco Shed, Royapuram|Royapuram Electric Loco Shed]] after the commissioning of electrification along the 'Bengaluru(Baiyyappanahalli) - Salem' line.
For first time, from July 2, 2022, full end-to-end run with electric locomotive run has started using a "WAP-7"(locomotive) based out of [[Electric Loco Shed, Royapuram|Royapuram Electric Loco Shed]] after the commissioning of electrification along the 'Bengaluru(Baiyyappanahalli) - Salem' line.


=== Rake/coach composition ===
=== Rake/coach composition ===
16,952

edits