6
edits
>BattyBot m (→Phase I: Removed/fixed incorrect author parameter(s), performed general fixes) |
m (robot: Update article (please report if you notice any mistake or error in this edit)) |
||
Line 7: | Line 7: | ||
| name = Green Line | | name = Green Line | ||
| other_name = North - South corridor | | other_name = North - South corridor | ||
| color = {{Namma Metro | | color = {{rail color|Namma Metro|Green}} | ||
| logo = | | logo = | ||
| logo_width = 150 | | logo_width = 150 | ||
| logo_alt = | | logo_alt = | ||
| image = | | image = Green line metro train.jpg | ||
| image_width = 300 | | image_width = 300 | ||
| caption = | | caption = A Green Line metro train | ||
| type = [[Rapid Transit]] | | type = [[Rapid Transit]] | ||
| system = [[Namma Metro]] | | system = [[Namma Metro]] | ||
Line 19: | Line 19: | ||
| locale = [[Bangalore|Bengaluru]], [[Karnataka]], India | | locale = [[Bangalore|Bengaluru]], [[Karnataka]], India | ||
| start = [[Nagasandra metro station|Nagasandra]] | | start = [[Nagasandra metro station|Nagasandra]] | ||
| end = [[ | | end = [[Silk Institute metro station|Silk Institute]] | ||
| stations = 29 (Operational)<br/>3 (Under Construction) | | stations = 29 (Operational)<br/>3 (Under Construction) | ||
| daily_ridership = 170,685 | | daily_ridership = 170,685 | ||
Line 29: | Line 29: | ||
| stock = Hyundai Rotem - BEML | | stock = Hyundai Rotem - BEML | ||
| depot = Peenya | | depot = Peenya | ||
| linelength_km = 30. | | linelength_km = 30.69 | ||
| tracklength = | | tracklength = | ||
| tracklength_km = | | tracklength_km = | ||
Line 50: | Line 50: | ||
}} | }} | ||
'''Green Line''' of [[Namma Metro]] was built along with the Purple Line during the first phase of | '''Green Line''' of [[Namma Metro]] was built along with the Purple Line during the first phase of construction of the [[Rapid transit|metro]] rail system for the city of [[Bengaluru]], [[Karnataka]], [[India]]. The 30.5 km line connects [[Nagasandra metro station|Nagasandra]] in the northwest to [[Silk Institute metro station|Silk Institute]] in the south. The line connects the industrial centers of [[Peenya]] and [[Yelahanka]] in the north with the central hub of [[Majestic, Bangalore|Majestic]] and the southern residential areas of Bangalore ([[Basavanagudi]], [[Jayanagar, Bangalore|Jayanagar]], [[Banashankari|Banshankari]] etc.). Green Line is mostly elevated, with 26 elevated stations and 3 underground stations. The Line passes through [[Majestic metro station|Majestic station]] which is an interchange station between Green and [[Purple Line (Namma Metro)|Purple Lines]]. | ||
When Phase II is completed, the line will stretch from Madavara in northwest to Silk Institute in the South. The length of the line will increase to {{Convert| | When Phase II is completed, the line will stretch from Madavara in northwest to Silk Institute in the South. The length of the line will increase to {{Convert|34.46|km|mi}}. | ||
==History== | ==History== | ||
Line 59: | Line 59: | ||
{|class="wikitable" style="text-align: center;" | {|class="wikitable" style="text-align: center;" | ||
|- | |- | ||
! colspan="6" style="background:#{{Namma Metro | ! colspan="6" style="background:#{{rail color|Namma Metro|Green}};" | <span style="color:WHITE;">'''History'''</span> | ||
|- | |- | ||
! Name | ! Name | ||
Line 79: | Line 79: | ||
| UG 2 || 18 June 2017<ref name=":0" /> ||[[Sampige Road metro station|Sampige Road]]||[[National College metro station|National College]]||{{convert|4.0|km|mi|abbr=on}}<ref>{{cite web|last1=ReporterBengaluru|first1=Staff|title=BMRCL races to meet April 15 deadline|url=http://www.thehindu.com/news/cities/bangalore/bmrcl-races-to-meet-april-15-deadline/article17428832.ece|website=The Hindu|access-date=8 March 2017|language=en}}</ref>||3 | | UG 2 || 18 June 2017<ref name=":0" /> ||[[Sampige Road metro station|Sampige Road]]||[[National College metro station|National College]]||{{convert|4.0|km|mi|abbr=on}}<ref>{{cite web|last1=ReporterBengaluru|first1=Staff|title=BMRCL races to meet April 15 deadline|url=http://www.thehindu.com/news/cities/bangalore/bmrcl-races-to-meet-april-15-deadline/article17428832.ece|website=The Hindu|access-date=8 March 2017|language=en}}</ref>||3 | ||
|- | |- | ||
| Reach 4B || 15 January 2021 <ref name=":1">{{Cite web|title=Revised dates due to covid|url=https://www.thenewsminute.com/article/how-will-covid-19-impact-already-delayed-metro-projects-bengaluru-130028|access-date=2020-09-07|website=www.thenewsminute.com}}</ref>||[[Yelachenahalli metro station|Yelachenahalli]]|| Silk Institute||{{convert|6.29|km|mi|abbr=on}}<ref name = "BM Phase II length"/>||5 | | Reach 4B || 15 January 2021 <ref name=":1">{{Cite web|title=Revised dates due to covid|url=https://www.thenewsminute.com/article/how-will-covid-19-impact-already-delayed-metro-projects-bengaluru-130028|access-date=2020-09-07|website=www.thenewsminute.com}}</ref>||[[Yelachenahalli metro station|Yelachenahalli]]|| [[Silk Institute metro station|Silk Institute]]||{{convert|6.29|km|mi|abbr=on}}<ref name = "BM Phase II length"/>||5 | ||
|- | |- | ||
| Reach 3C || ''June 2022''<ref name=":1" /> ||[[Nagasandra metro station|Nagasandra]]||Madavara||{{convert|3.77|km|mi|abbr=on}}<ref name = "BM Phase II length">{{cite web|title=BMRCL begins razing structures for metro to Whitefield|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-manpower-crunch-may-delay-kanakapura-mysuru-road-metro-lines/articleshow/76764238.cms?|website=Bangalore Mirror|access-date=4 April 2017}}</ref>||3 | | Reach 3C || ''June 2022''<ref name=":1" /> ||[[Nagasandra metro station|Nagasandra]]||Madavara||{{convert|3.77|km|mi|abbr=on}}<ref name = "BM Phase II length">{{cite web|title=BMRCL begins razing structures for metro to Whitefield|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-manpower-crunch-may-delay-kanakapura-mysuru-road-metro-lines/articleshow/76764238.cms?|website=Bangalore Mirror|access-date=4 April 2017}}</ref>||3 | ||
Line 105: | Line 105: | ||
Contract for construction of the 6.5 km Reach 4B from Yelachenahalli to Silk Institute (previously named Anjanapura) was awarded to Nagarjuna Construction Co. The extension was estimated to cost {{INRConvert|508.86|c}}.<ref name="ET22">{{cite web|title=At Rs 247 crore, contract for Namma Metro purple line extension finalised|url=http://economictimes.indiatimes.com/industry/transportation/railways/at-rs-247-crore-contract-for-namma-metro-purple-line-extension-finalised/articleshow/57386842.cms|website=The Economic Times|access-date=28 February 2017}}</ref> Civil work on the extension began in October 2016<ref name="DC22" /> and was completed by 2020. Trial runs were conducted on 18–19 December 2020<ref>{{cite web |title=CMRS Inspects Bangalore Metro Green Line's Anjanapura Extn |url=https://themetrorailguy.com/2020/11/19/cmrs-inspects-bangalore-metro-green-lines-anjanapura-extn/ |website=The Metro Rail Guy |access-date=14 January 2021}}</ref> following which the extension was inaugurated on 14 January 2021,<ref>{{cite news |last1=Lalitha |first1=S |title=First line of Bangalore Metro's Phase-2 flagged off |url=https://www.newindianexpress.com/cities/bengaluru/2021/jan/14/first-line-of-bangalore-metros-phase-2-flagged-off-2250181.html |access-date=14 January 2021 |work=The New Indian Express |date=14 January 2021}}</ref> making it the first section of Phase II to start commercial operations. | Contract for construction of the 6.5 km Reach 4B from Yelachenahalli to Silk Institute (previously named Anjanapura) was awarded to Nagarjuna Construction Co. The extension was estimated to cost {{INRConvert|508.86|c}}.<ref name="ET22">{{cite web|title=At Rs 247 crore, contract for Namma Metro purple line extension finalised|url=http://economictimes.indiatimes.com/industry/transportation/railways/at-rs-247-crore-contract-for-namma-metro-purple-line-extension-finalised/articleshow/57386842.cms|website=The Economic Times|access-date=28 February 2017}}</ref> Civil work on the extension began in October 2016<ref name="DC22" /> and was completed by 2020. Trial runs were conducted on 18–19 December 2020<ref>{{cite web |title=CMRS Inspects Bangalore Metro Green Line's Anjanapura Extn |url=https://themetrorailguy.com/2020/11/19/cmrs-inspects-bangalore-metro-green-lines-anjanapura-extn/ |website=The Metro Rail Guy |access-date=14 January 2021}}</ref> following which the extension was inaugurated on 14 January 2021,<ref>{{cite news |last1=Lalitha |first1=S |title=First line of Bangalore Metro's Phase-2 flagged off |url=https://www.newindianexpress.com/cities/bengaluru/2021/jan/14/first-line-of-bangalore-metros-phase-2-flagged-off-2250181.html |access-date=14 January 2021 |work=The New Indian Express |date=14 January 2021}}</ref> making it the first section of Phase II to start commercial operations. | ||
In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031 km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).<ref name = "DC22">{{cite web|title=BMRCL invites bids for 3-km extension from Nagasandra.|url=http://www.deccanherald.com/content/575499/bmrcl-invites-bids-3-km.html|website=Deccan Herald|access-date=28 February 2017}}</ref> Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of {{INRConvert|247.41|c}} and a deadline for completion of 27 months.<ref name="ET22"/><ref>{{cite web|title=Metro to start work on third stretch of Phase-II|url=http://www.newindianexpress.com/cities/bengaluru/2017/apr/10/metro-to-start-work-on-third-stretch-of-phase-ii-1591915.html|website=The New Indian Express|access-date=13 April 2017}}</ref> The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.<ref>{{cite web |title=Work on BIEC Metro link begins as Jindal land acquired |url=https://www.deccanherald.com/content/629788/work-biec-metro-link-begins.html |website=Deccan Herald |access-date=8 October 2018 |language=en |date=25 August 2017}}</ref> Construction work on Reach 3C is expected to be ready by | In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031 km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).<ref name = "DC22">{{cite web|title=BMRCL invites bids for 3-km extension from Nagasandra.|url=http://www.deccanherald.com/content/575499/bmrcl-invites-bids-3-km.html|website=Deccan Herald|access-date=28 February 2017}}</ref> Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of {{INRConvert|247.41|c}} and a deadline for completion of 27 months.<ref name="ET22"/><ref>{{cite web|title=Metro to start work on third stretch of Phase-II|url=http://www.newindianexpress.com/cities/bengaluru/2017/apr/10/metro-to-start-work-on-third-stretch-of-phase-ii-1591915.html|website=The New Indian Express|access-date=13 April 2017}}</ref> The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.<ref>{{cite web |title=Work on BIEC Metro link begins as Jindal land acquired |url=https://www.deccanherald.com/content/629788/work-biec-metro-link-begins.html |website=Deccan Herald |access-date=8 October 2018 |language=en |date=25 August 2017}}</ref> Construction work on Reach 3C is expected to be ready by June–August 2022.<ref>{{Cite web|date=3 July 2020|first=Christin Mathew |last=Philip|title=Bangalore Metro News: Manpower crunch may delay Kanakapura, Mysuru Road Metro lines|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-manpower-crunch-may-delay-kanakapura-mysuru-road-metro-lines/articleshow/76764238.cms|access-date=2020-09-07|website=The Times of India|language=en}}</ref> | ||
==Stations== | ==Stations== | ||
Line 112: | Line 112: | ||
{|class="wikitable" style="text-align: center;" | {|class="wikitable" style="text-align: center;" | ||
! align="center" colspan="7" style="background:#{{Namma Metro | ! align="center" colspan="7" style="background:#{{rail color|Namma Metro|Green}};"| <span style="color:WHITE;">'''Green Line'''</span> | ||
|- | |- | ||
! rowspan="2"|# | ! rowspan="2"|# | ||
Line 124: | Line 124: | ||
|- | |- | ||
|1|| style="text-align:center;"|{{metro|Madavara}}||ಮದವರ | |1|| style="text-align:center;"|{{metro|Madavara}}||ಮದವರ | ||
| | |September 2022 | ||
| ||Elevated | | ||Elevated | ||
| | | | ||
Line 130: | Line 130: | ||
|2|| style="text-align:center;"|{{metro|Chikkabidarakallu}}|| | |2|| style="text-align:center;"|{{metro|Chikkabidarakallu}}|| | ||
ಚಿಕ್ಕಬಿದರಕಲ್ಲು | ಚಿಕ್ಕಬಿದರಕಲ್ಲು | ||
|'' | |''September 2022''|| ||Elevated | ||
| | | | ||
|- | |- | ||
|3|| style="text-align:center;"|{{metro|Manjunathanagara}}||ಮಂಜುನಾಥನಗರ | |3|| style="text-align:center;"|{{metro|Manjunathanagara}}||ಮಂಜುನಾಥನಗರ | ||
|'' | |''September 2022'' | ||
| ||Elevated | | ||Elevated | ||
| | | | ||
Line 154: | Line 154: | ||
|- | |- | ||
|9|| style="text-align:center;"|[[Goraguntepalya metro station|Goraguntepalya]]|| ಗೊರಗುಂಟೆಪಾಳ್ಯ | |9|| style="text-align:center;"|[[Goraguntepalya metro station|Goraguntepalya]]|| ಗೊರಗುಂಟೆಪಾಳ್ಯ | ||
| 1 March 2014 ||{{ | | 1 March 2014 ||{{rint|subway}} {{rcb|Namma Metro|Orange|inline=yes}} (''Planned, Ph lll'')||Elevated|| | ||
|- | |- | ||
|10|| style="text-align:center;"|[[Yeshwanthpur metro station|Yeshwanthpura]]|| ಯಶವಂತಪುರ | |10|| style="text-align:center;"|[[Yeshwanthpur metro station|Yeshwanthpura]]|| ಯಶವಂತಪುರ | ||
Line 178: | Line 178: | ||
|- | |- | ||
|17|| style="text-align:center;"|[[Majestic metro station|Nadaprabhu Kempegowda station, Majestic]]|| ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್ | |17|| style="text-align:center;"|[[Majestic metro station|Nadaprabhu Kempegowda station, Majestic]]|| ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್ | ||
| 18 June 2017 ||{{ | | 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Purple|inline=yes}}, | ||
{{rint|bus}}[[Kempegowda Bus Station]], | {{rint|bus}}[[Kempegowda Bus Station]], | ||
Line 203: | Line 203: | ||
|- | |- | ||
|24|| style="text-align:center;"|[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]|| ರಾಷ್ಟೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ | |24|| style="text-align:center;"|[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]|| ರಾಷ್ಟೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ | ||
| 18 June 2017 ||{{ | | 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Yellow|inline=yes}} (''Under Construction'')||Elevated|| | ||
|- | |- | ||
|25|| style="text-align:center;"|[[Banashankari metro station|Banashankari]]|| ಬನಶಂಕರಿ | |25|| style="text-align:center;"|[[Banashankari metro station|Banashankari]]|| ಬನಶಂಕರಿ | ||
Line 209: | Line 209: | ||
|- | |- | ||
|26|| style="text-align:center;"|[[Jayaprakash Nagar metro station|Jaya Prakash Nagar]]|| ಜಯ ಪ್ರಕಾಶ ನಗರ | |26|| style="text-align:center;"|[[Jayaprakash Nagar metro station|Jaya Prakash Nagar]]|| ಜಯ ಪ್ರಕಾಶ ನಗರ | ||
| 18 June 2017 ||{{ | | 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Orange|inline=yes}} (''Planned ph lll'')||Elevated|| | ||
|- | |- | ||
|27|| style="text-align:center;"|[[Yelachenahalli metro station|Yelachenahalli]]|| ಎಲಚೇನಹಳ್ಳಿ | |27|| style="text-align:center;"|[[Yelachenahalli metro station|Yelachenahalli]]|| ಎಲಚೇನಹಳ್ಳಿ | ||
Line 229: | Line 229: | ||
| | | | ||
|- | |- | ||
|31|| style="text-align:center;"| | |31|| style="text-align:center;"|[[Thalaghattapura metro station|Thalaghattapura]]|| ತಲಘಟ್ಟಪುರ | ||
| 15 January 2021 | | 15 January 2021 | ||
| ||Elevated | | ||Elevated | ||
Line 256: | Line 256: | ||
==Operations== | ==Operations== | ||
===Frequency and capacity=== | ===Frequency and capacity=== | ||
Trains initially operated on the Green Line from 6 am to 11 pm. This was extended from 5AM to 11PM from 1 December 2015. The frequency along the line was 15 minutes between 5AM and | Trains initially operated on the Green Line from 6 am to 11 pm. This was extended from 5AM to 11PM from 1 December 2015. The frequency along the line was 15 minutes between 5AM and 8AM and 8PM and 11PM, and 10 minutes between 8AM and 8PM.<ref name="newindianexpress">{{cite web|url=http://www.newindianexpress.com/cities/bengaluru/Metro-Services-Extended/2015/11/26/article3147404.ece|publisher=newindianexpress.com|title=Metro Services Extended- The New Indian Express|access-date=10 April 2017}}</ref> Trains halt for 30 seconds at each station.<ref>{{cite web|last=Nair |first=Anisha |url=http://news.oneindia.in/bangalore/malleshwaram-peenya-metro-phase-ready-public-use-from-march-1-1404191.html |title=Malleshwaram-Peenya metro phase ready for public use from March 1 |publisher=News Oneindia |date=1 March 2014 |access-date=27 March 2014}}</ref> The 24.2 km journey is usually covered in about 42 minutes. Each six-coach train has a capacity of 2,004 passengers.<ref name="thehindu1"/> | ||
==See also== | ==See also== | ||
*[[Namma Metro]] | *[[Namma Metro]] | ||
* [[Purple Line (Namma Metro)|Purple Line]] | ** [[Purple Line (Namma Metro)|Purple Line]] | ||
* [[Yellow Line (Namma Metro)|Yellow Line]] | ** [[Yellow Line (Namma Metro)|Yellow Line]] | ||
* [[Pink Line (Namma Metro)|Pink Line]] | ** [[Pink Line (Namma Metro)|Pink Line]] | ||
* [[Blue Line (Namma Metro)|Blue Line]] | ** [[Blue Line (Namma Metro)|Blue Line]] | ||
** [[Orange Line (Namma Metro)|Orange Line]] | |||
* [[List of Namma Metro stations|List of Namma Metro Stations]] | * [[List of Namma Metro stations|List of Namma Metro Stations]] | ||
* [[Rapid transit in India]] | * [[Rapid transit in India]] | ||
Line 276: | Line 277: | ||
{{Commons|Namma Metro}} | {{Commons|Namma Metro}} | ||
{{Namma Metro | {{Namma Metro}} | ||
[[Category:Namma Metro lines]] | [[Category:Namma Metro lines]] |