|
|
| Line 1: |
Line 1: |
| {{Merge to|Chennai–Bengaluru-Mysuru high-speed rail corridor|discuss=Talk:Chennai–Bengaluru-Mysuru high-speed rail corridor#Proposed merge of Chennai–Bengaluru high-speed rail corridor into Chennai–Bengaluru-Mysuru high-speed rail corridor|date=February 2021}}
| | #REDIRECT [[Chennai–Mysuru high-speed rail corridor]] |
| {{Use dmy dates|date=June 2018}}
| |
| {{Use Indian English|date=June 2018}}
| |
| {{Infobox rail line
| |
| | name = Chennai–Bengaluru high-speed rail corridor
| |
| | other_name = Madras–Bangalore high-speed rail corridor
| |
| | native_name =
| |
| | native_name_lang =
| |
| | color =
| |
| | logo =
| |
| | logo_width =
| |
| | logo_alt =
| |
| | image =
| |
| | image_width =
| |
| | image_alt =
| |
| | caption =
| |
| | type =
| |
| | system =
| |
| | status =
| |
| | locale = India
| |
| | start = [[Chennai]]
| |
| | end = [[Bengaluru]]
| |
| | stations =
| |
| | routes =
| |
| | daily_ridership =
| |
| | ridership2 =
| |
| | planopen = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| |
| | open = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| |
| | yearcommenced = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| |
| | yearcompleted = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| |
| | close = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| |
| | event1label =
| |
| | event1 =
| |
| | event2label =
| |
| | event2 =
| |
| | event3label =
| |
| | event3 =
| |
| | owner =
| |
| | operator =
| |
| | character =
| |
| | depot =
| |
| | stock =
| |
| | linelength_km = 340
| |
| | linelength_mi =
| |
| | linelength =
| |
| | tracklength_km =
| |
| | tracklength_mi =
| |
| | tracklength =
| |
| | tracks =
| |
| | gauge = <!-- {{Track gauge|sg|allk=on}} {{Track gauge|1435mm|allk=on}} {{Track gauge|42in|lk=on}} etc -->
| |
| | load_gauge =
| |
| | minradius =
| |
| | routenumber =
| |
| | linenumber =
| |
| | electrification =
| |
| | speed_km/h = 320
| |
| | speed_mph = 200
| |
| | speed =
| |
| | signalling =
| |
| | elevation_m =
| |
| | elevation_ft =
| |
| | elevation =
| |
| | website =
| |
| | map =
| |
| | map_name =
| |
| | map_state = uncollapsed
| |
| }}
| |
| The '''Chennai–Bengaluru high-speed rail corridor''' (or Madras–Bangalore high-speed rail corridor) is a proposed {{convert|340|km|mi|adj=mid|long}} [[high-speed railway line]] that connects two major economic and state capitals in the southern parts of the Republic of India, [[Chennai]] and [[Bengaluru]].<ref>{{Cite news| url=http://economictimes.indiatimes.com/industry/transportation/railways/high-speed-rail-germany-to-study-chennai-bangalore-mysore-route/articleshow/52525878.cms| title=High-speed rail: Germany to study Chennai-Bangalore-Mysore route| date=2016-05-31| work=The Economic Times| access-date=2017-08-17}}</ref><ref>{{Cite news| url=http://timesofindia.indiatimes.com/city/bengaluru/High-speed-Bluru-Chennai-rail-may-be-scrapped/articleshow/46034826.cms| title=High-speed B’luru-Chennai rail may be scrapped| work=The Times of India| access-date=2017-08-17| date=January 28, 2015}}</ref>
| |
| | |
| Construction has yet to begin and the project still remains standing as a distant proposal. Several feasibility studies have been completed, notable by Germany and China.<ref name=":0">{{Cite news| url=http://starofmysore.com/high-speed-rail-germany-study-chennai-bengaluru-mysuru-route/| title=High-speed rail: Germany to study Chennai-Bengaluru-Mysuru route| date=2017-06-29| work=Star of Mysore| access-date=2017-08-17| language=en-US}}</ref> The Indian High Speed Rail Commission requested for route designs to be tendered in February 2020.<ref>{{Cite web|url=https://www.thenewsminute.com/article/bids-invited-route-design-mysuru-bengaluru-chennai-high-speed-rail-corridor-118069|access-date=2020-06-25|website=www.thenewsminute.com}}</ref>
| |
| | |
| The proposal would see the journey times between the two cities reduced to around ninety minutes with upgrading work costing around 200Rs/km.<ref>{{Cite web| url=http://constructionbusinesstoday.in/business-bytes/survey-on-for-bullet-train-service-between-mysore-bangalore-chennai| title=Business Bytes: Survey on for bullet train service between Mysore-Bangalore-Chennai| website=Construction Business Today| language=en-gb| access-date=2017-08-17| url-status=dead| archiveurl=https://web.archive.org/web/20170818085901/http://constructionbusinesstoday.in/business-bytes/survey-on-for-bullet-train-service-between-mysore-bangalore-chennai| archivedate=August 18, 2017| date=2015| publisher=VOL Media Pvt Ltd.}}</ref>
| |
| | |
| == History ==
| |
| The current journey from Chennai to Bengaluru run at {{convert|55|km/h|abbr=on}} and takes 6–7 hours to complete, with ticket prices starting for Second Seating as little as ₹150 and for Sleeper Class at ₹230. The Shatabdi Express runs at an average of {{convert|70|km/h|abbr=on}}, covering the distance in 5 hours with ticket prices starting at ₹975.<ref>{{Cite web| url=http://epaperbeta.timesofindia.com/Article.aspx?eid=31806&articlexml=BLURU-CHENNAI-RAIL-High-speed-train-may-be-28012015002030| title=B'LURU-CHENNAI RAIL - High-speed train may be scrapped| website=Times of India| language=en| access-date=2017-08-17| url-status=dead| archiveurl=https://web.archive.org/web/20170930224148/http://epaperbeta.timesofindia.com/Article.aspx?eid=31806&articlexml=BLURU-CHENNAI-RAIL-High-speed-train-may-be-28012015002030| archivedate=September 30, 2017}}</ref>
| |
| | |
| [[Karnataka]] Chief Minister, suggested that the state wanted to run [[Shinkansen|bullet trains]] to Chennai, and was conducting talks with his counterparts in [[Japan]] about the topic.<ref>{{Cite web| url=http://www.railway-technology.com/news/newskarnataka-operate-bullet-trains-bangalore-mysore-chennai| title=Karnataka to operate bullet trains from Bangalore to Mysore and Chennai| website=Railway Technology| access-date=2017-08-17| date=September 18, 2013}}</ref> He commented that the journey could be done in less that one hour though no studies had yet been conducted prior to those words.<ref name=":0" />
| |
| | |
| A feasibility study by [[China]] on the project was submitted to the Federal Government in June 2015.<ref>{{Cite web| url=http://hsrc.in/projects3.html| title=Projects: Chennai-Bangaluru-Mysore| website=High Speed Rail Corporation of India| access-date=2017-08-17}}</ref> While Germany also proposed to conduct its own feasibility study at the same time.<ref>{{Cite news| url=http://citytoday.news/study-of-high-speed-rail-project-from-germany-on-chennai-bengaluru-mysuru-sector/| title=Study of High Speed Rail Project from Germany on Chennai-Bengaluru-Mysuru sector| date=2017-06-30| work=Mysuru Today| access-date=2017-08-17| language=en-US}}</ref> The then Railways Minister, Suresh Prabhu, suggested that the route would be one of the next high-speed railways to be implemented in India.<ref>{{Cite news| url=http://www.dnaindia.com/mumbai/report-suresh-prabhu-promises-new-bullet-train-routes-2131899| title=Suresh Prabhu promises new bullet train routes| date=2015-10-06| work=dna| access-date=2017-08-17| language=en-US}}</ref>
| |
| | |
| Japan Railway Technical Service (JARTS) and Oriental Consultants submitted a feasibility study in early 2016 about constructing the high-speed railway line through a PPP with the government.<ref>{{Cite web| url=http://www.construction-ic.com/HomePage/Projects?returnUrl=/Projects/Overview/139351| title=(untitled)| website=Construction Intelligence Center| access-date=2017-08-17| url-access=subscription}}</ref> In mid-2016, the government of Andhra Pradesh floated a Special Purpose Vehicle to support the creation of high-speed railways passing through the state.<ref>{{Cite news| url=http://www.thehindu.com/news/cities/Vijayawada/High-speed-trains-from-Amaravati-to-Chennai-soon/article14384683.ece| title=High-speed trains from Amaravati to Chennai soon| work=The Hindu| access-date=2017-08-17| language=en| date=September 16, 2016}}</ref> French state-owned company SNCF also expressed an interest in building a high-speed railway line too.<ref>{{Cite news| url=http://www.telegraphindia.com/1160606/jsp/business/story_89503.jsp| title=Reality check on bullet train ambition| date=2016-06-06| access-date=2017-08-17| website=The Telegraph}}</ref>
| |
| | |
| In early 2017, Indian Railways (IR) responded to a proposal by Elon Musk for a Hyperloop to connect the two cities in thirty minutes, saying that it would be unlikely due to government bureaucracy.<ref>{{Cite news| url=http://detechter.com/chennai-to-bangalore-in-just-30-minutes-hyperloops-high-speed-train-headed-to-india/| title=Chennai to Bangalore in Just 30 minutes - Hyperloop's high-speed train headed to India| date=2017-01-17| work=Detechter| access-date=2017-08-17| language=en-US}}</ref>
| |
| | |
| During the June 2017 opening of Bengaluru's Green Line, Japan’s Ambassador to India, Kenji Hiramatsu, suggested that the railway line should be built with support from Japanese development funds.<ref>{{Cite web| url=http://www.deccanherald.com/content/617994/japan-pushes-bluru-chennai-high.html| title=Japan pushes for B'luru-Chennai high-speed rail| website=Deccan Herald| access-date=2017-08-17| date=June 18, 2017| author=DH News Service}}</ref>
| |
| | |
| == Description ==
| |
| The high-speed railway line would mainly be built alongside the existing railway between the two cities. However, a {{convert|38|km|mi|adj=mid|long}} viaduct between Bangarapet and Vaniyambadi, as well as a {{convert|44|km|mi|adj=mid|long}} viaduct between Katpadi and Arakkonam, would need to be constructed due to hilly terrain.<ref name=":1">{{Cite web| url=http://www.webeotransportation.com/copy-of-miami-metro-rail-transbay-e| title=Bangalore to Chennai Bullet Train| date=April 21, 2017| website=Webeo Transportation| access-date=2017-08-17}}</ref>
| |
| | |
| There would be two new railway stations built underground in Chennai and one at Bengaluru, would witness the high-speed trains, running at around {{convert|320|km/h|abbr=on}}<ref name=":1" />
| |
| | |
| ==Stations==
| |
| Stations are proposed at:
| |
| Chennai Central UG (Interchange with Railways,Suburban Railways and Metro),
| |
| Poonamallee (Interchange with Metro),
| |
| Arakkonam,
| |
| Chittor,
| |
| Bangarapet,
| |
| Bengaluru Majestic UG (Interchange with Railways and Metro),
| |
| Chennapatna,
| |
| Mandya,
| |
| Mysore.
| |
| | |
| The depot for 435km long line proposed to come up at Poonamallee, a suburb of Chennai.
| |
| | |
| == See also ==
| |
| *[[Mumbai–Ahmedabad high-speed rail corridor]] (India's first approved high-speed railway project)
| |
| *[[High-speed rail in India|High-Speed Rail in India]]
| |
| *[[National High Speed Rail Corporation Limited]]
| |
| | |
| == References ==
| |
| {{reflist}}
| |
| | |
| {{High-speed rail in India}}
| |
| {{High-speed rail}}
| |
| | |
| {{DEFAULTSORT:Chennai-Bengaluru high-speed rail corridor}}
| |
| [[Category:Transport in Bangalore]]
| |
| [[Category:Transport in Chennai]]
| |
| [[Category:Rail transport in Tamil Nadu]]
| |
| [[Category:Rail transport in Karnataka]]
| |
| [[Category:High-speed rail in India]]
| |
| [[Category:Standard gauge railways in India]]
| |
| [[Category:Proposed infrastructure in Tamil Nadu]]
| |