>Citation bot Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 538/2182 |
robot: Update article (please report if you notice any mistake or error in this edit) |
||
| Line 2: | Line 2: | ||
{{Use dmy dates|date=May 2019}} | {{Use dmy dates|date=May 2019}} | ||
{{Use Indian English|date=May 2019}} | {{Use Indian English|date=May 2019}} | ||
'''Gautami Combined Cycle Power Plant''' is located at [[Peddapuram]] in [[ | '''Gautami Combined Cycle Power Plant''' is located at [[Peddapuram]] in [[Kakinada district]] in state of [[Andhra Pradesh]]. The power plant is one of the gas-based power plants of [[GVK (conglomerate)|GVK Group]]. | ||
In Jun 2003, GVK secured an amended 15yr PPA with APDISCOM for the Gautami project not far from Jegurupadu in Peddapuram, Kakinada district. Financial closure was in Mar 2004. The project was originally developed by Satyam Construction Co (later acquired by Nagarjuna Construction) with Maytas Infra and IJM (India) Infrastructure Ltd. GVK successively bought out most of the Nagarjuna stake and is the controlling shareholder. Equipment was ordered on a turnkey basis from Alstom in Jul 2004 for €180mn. Construction was started with completion expected in Jun 2006. In the event, Gautami did not commission until Jun 2009. The original budget was about Rs1300 Cr and the plant came in at Rs1450 cr. Gautami has a Ground Support Agreement with GAIL for the term of the PPA. In May 2010, GVK awarded a contract to a consortium including Siemens, Hyundai, and L&T for two 392-MW blocks to extend Gautami. These blocks are expected to cost Rs3,200cr | |||
== Capacity == | == Capacity == | ||
| Line 15: | Line 17: | ||
[[Category:Natural gas-fired power stations in Andhra Pradesh]] | [[Category:Natural gas-fired power stations in Andhra Pradesh]] | ||
[[Category:Buildings and structures in | [[Category:Buildings and structures in Kakinada district]] | ||
[[Category:2009 establishments in Andhra Pradesh]] | [[Category:2009 establishments in Andhra Pradesh]] | ||
[[Category:Energy infrastructure completed in 2009]] | [[Category:Energy infrastructure completed in 2009]] | ||
{{ | {{Kakinada-geo-stub}} | ||
{{India-powerstation-stub}} | {{India-powerstation-stub}} | ||
Revision as of 21:31, 19 May 2022
This article needs additional citations for verification. (May 2019) |
Gautami Combined Cycle Power Plant is located at Peddapuram in Kakinada district in state of Andhra Pradesh. The power plant is one of the gas-based power plants of GVK Group.
In Jun 2003, GVK secured an amended 15yr PPA with APDISCOM for the Gautami project not far from Jegurupadu in Peddapuram, Kakinada district. Financial closure was in Mar 2004. The project was originally developed by Satyam Construction Co (later acquired by Nagarjuna Construction) with Maytas Infra and IJM (India) Infrastructure Ltd. GVK successively bought out most of the Nagarjuna stake and is the controlling shareholder. Equipment was ordered on a turnkey basis from Alstom in Jul 2004 for €180mn. Construction was started with completion expected in Jun 2006. In the event, Gautami did not commission until Jun 2009. The original budget was about Rs1300 Cr and the plant came in at Rs1450 cr. Gautami has a Ground Support Agreement with GAIL for the term of the PPA. In May 2010, GVK awarded a contract to a consortium including Siemens, Hyundai, and L&T for two 392-MW blocks to extend Gautami. These blocks are expected to cost Rs3,200cr
Capacity
The power plant has installed capacity of 469 MW.[1]