Enathu Bailey bridge: Difference between revisions

From Bharatpedia, an open encyclopedia
m (1 revision imported)
(Add {{source}} tag)
Line 1: Line 1:
'''Enathu Bailey bridge''' was a [[Bailey bridge]] made by [[Indian Army]]<ref>{{cite news|title=Kerala's first military-made Bailey bridge set to open in Enathu|url=http://english.manoramaonline.com/news/kerala/2017/04/05/kerala-military-bailey-bridge-enathu-pathanamthitta.html|accessdate=10 April 2017|work=[[Malayala Manorama]]}}</ref><ref>{{cite news|title=Army to build Bailey Bridge at Enathu in a month|url=http://m.timesofindia.com/city/thiruvananthapuram/army-to-build-bailey-bridge-at-enathu-in-a-month/articleshow/57088537.cms|accessdate=10 April 2017|work=[[Times of India]]}}</ref> through [[Kallada River]] in [[Enathu]], [[Pathanamthitta district]], [[Kerala]]. <ref>{{cite news|title=Enathu Bailey bridge to be opened on April 10|url=http://m.timesofindia.com/city/thiruvananthapuram/enathu-bailey-bridge-to-be-opened-on-monday/articleshow/58075331.cms|accessdate=10 April 2017|work=[[Times of India]]}}</ref> The bridge is opened for public on 10 April 2017.<ref>{{cite news|title=Bailey bridge to be open on Monday|url=http://www.thehindu.com/news/national/kerala/bailey-bridge-to-be-open-on-monday/article17895449.ece|accessdate=10 April 2017|work=[[The Hindu]]}}</ref>The bridge is 54.50-metre-long 3.5 metres wide.<ref>{{cite news|title=Enathu Bailey bridge at to be opened before Vishu|url=http://english.mathrubhumi.com/mobile/news/kerala/bailey-bridge-at-enathu-to-be-opened-before-vishu-1.1846596|accessdate=10 April 2017|work=[[Mathrubhumi]]}}</ref><ref>{{cite news|title=Minister reviews Enathu Bailey bridge work|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/minister-reviews-bridge-work/article17755322.ece|accessdate=10 April 2017|work=[[The Hindu]]}}</ref>
'''Enathu Bailey bridge''' was a [[Bailey bridge]] made by [[Indian Army]]<ref>{{cite news|title=Kerala's first military-made Bailey bridge set to open in Enathu|url=http://english.manoramaonline.com/news/kerala/2017/04/05/kerala-military-bailey-bridge-enathu-pathanamthitta.html|accessdate=10 April 2017|work=[[Malayala Manorama]]}}</ref><ref>{{cite news|title=Army to build Bailey Bridge at Enathu in a month|url=http://m.timesofindia.com/city/thiruvananthapuram/army-to-build-bailey-bridge-at-enathu-in-a-month/articleshow/57088537.cms|accessdate=10 April 2017|work=[[Times of India]]}}</ref> through [[Kallada River]] in [[Enathu]], [[Pathanamthitta district]], [[Kerala]].<ref>{{cite news|title=Enathu Bailey bridge to be opened on April 10|url=http://m.timesofindia.com/city/thiruvananthapuram/enathu-bailey-bridge-to-be-opened-on-monday/articleshow/58075331.cms|accessdate=10 April 2017|work=[[Times of India]]}}</ref> The bridge is opened for public on 10 April 2017.<ref>{{cite news|title=Bailey bridge to be open on Monday|url=http://www.thehindu.com/news/national/kerala/bailey-bridge-to-be-open-on-monday/article17895449.ece|accessdate=10 April 2017|work=[[The Hindu]]}}</ref> The bridge is 54.50-metre-long 3.5 metres wide.<ref>{{cite news|title=Enathu Bailey bridge at to be opened before Vishu|url=http://english.mathrubhumi.com/mobile/news/kerala/bailey-bridge-at-enathu-to-be-opened-before-vishu-1.1846596|accessdate=10 April 2017|work=[[Mathrubhumi]]}}</ref><ref>{{cite news|title=Minister reviews Enathu Bailey bridge work|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/minister-reviews-bridge-work/article17755322.ece|accessdate=10 April 2017|work=[[The Hindu]]}}</ref>


In September 2017, the Indian Army dismantle the Bailey bridge, after the maintenance [[Enathu Bridge]] got completed..<ref>{{cite news|title=Dismantling of Bailey bridge begins at Adoor|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/dismantling-of-bailey-bridge-begins-at-adoor/article19688250.ece|work=The Hindu|accessdate=14 October 2017}}</ref>
In September 2017, the Indian Army dismantle the Bailey bridge, after the maintenance [[Enathu Bridge]] got completed.<ref>{{cite news|title=Dismantling of Bailey bridge begins at Adoor|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/dismantling-of-bailey-bridge-begins-at-adoor/article19688250.ece|work=The Hindu|accessdate=14 October 2017}}</ref>


==References==
==References==
{{reflist}}
{{reflist}}


{{Source|Wiki|S}}
[[Category:Bridges]]
[[Category:Bridges]]
[[Category:Transport in India]]
[[Category:Transport in India]]

Revision as of 01:56, 23 April 2021

Enathu Bailey bridge was a Bailey bridge made by Indian Army[1][2] through Kallada River in Enathu, Pathanamthitta district, Kerala.[3] The bridge is opened for public on 10 April 2017.[4] The bridge is 54.50-metre-long 3.5 metres wide.[5][6]

In September 2017, the Indian Army dismantle the Bailey bridge, after the maintenance Enathu Bridge got completed.[7]

References

  1. "Kerala's first military-made Bailey bridge set to open in Enathu". Malayala Manorama. Retrieved 10 April 2017.
  2. "Army to build Bailey Bridge at Enathu in a month". Times of India. Retrieved 10 April 2017.
  3. "Enathu Bailey bridge to be opened on April 10". Times of India. Retrieved 10 April 2017.
  4. "Bailey bridge to be open on Monday". The Hindu. Retrieved 10 April 2017.
  5. "Enathu Bailey bridge at to be opened before Vishu". Mathrubhumi. Retrieved 10 April 2017.
  6. "Minister reviews Enathu Bailey bridge work". The Hindu. Retrieved 10 April 2017.
  7. "Dismantling of Bailey bridge begins at Adoor". The Hindu. Retrieved 14 October 2017.

{{Source}} is deprecated. Please use a more specific template. See the documentation for a list of suggested templates.