6
edits
>SdkbBot m (→Overview: General fixes, removed erroneous space) |
(robot: Update article (please report if you notice any mistake or error in this edit)) |
||
Line 37: | Line 37: | ||
==Expansion== | ==Expansion== | ||
CIAL has decided to double the installed capacity of solar power generation. Another 10,000 panels would be installed in the remaining space to generate an additional 2.40 MW power. Panels to be installed atop the building and the new park would help generate 4 MW and another 7 MW through panels to be installed over the three km-long irrigation canal would take the total installed capacity to 26.50 MW. On 12 December 2020 a 5.1 MW Solar Carport was inaugurated along with the revamped T2 terminal, making it the largest solar carport in an airport. This addition also took the total capacity to 80 MW.<ref>{{cite web | url=http://www.thehindu.com/news/cities/Kochi/cial-to-double-solar-energy-capacity/article7926145.ece | title=CIAL to double solar energy capacity | | CIAL has decided to double the installed capacity of solar power generation. Another 10,000 panels would be installed in the remaining space to generate an additional 2.40 MW power. Panels to be installed atop the building and the new park would help generate 4 MW and another 7 MW through panels to be installed over the three km-long irrigation canal would take the total installed capacity to 26.50 MW. On 12 December 2020 a 5.1 MW Solar Carport was inaugurated along with the revamped T2 terminal, making it the largest solar carport in an airport. This addition also took the total capacity to 80 MW.<ref>{{cite web | url=http://www.thehindu.com/news/cities/Kochi/cial-to-double-solar-energy-capacity/article7926145.ece | title=CIAL to double solar energy capacity | work=The Hindu | date=28 November 2015 | accessdate=13 August 2016}}</ref> | ||
==Environmental impact== | ==Environmental impact== |