(Created page with " TUSCO Ltd, a joint venture renewable company of the THDC India Ltd and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA)<ref>https://energy.economictimes.indiatimes.com/news/renewable/pm-modi-to-lay-foundation-stone-of-ultra-mega-solar-park-in-jhansi/87791056</ref> ==Background== Ministry of New and Renewable Energy(MNRE), Government of India, has allocated 2000MW of Mega Renewable Energy Power Parks (UMREPPs) to be developed in the state of UP. A...")
 
m (clean up, added orphan, uncategorised, deadend tags)
 
Line 1: Line 1:
{{Multiple issues|
{{Dead end|date=October 2023}}
{{Orphan|date=October 2023}}
}}


TUSCO Ltd, a joint venture renewable company of the THDC India Ltd and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA)<ref>https://energy.economictimes.indiatimes.com/news/renewable/pm-modi-to-lay-foundation-stone-of-ultra-mega-solar-park-in-jhansi/87791056</ref>
'''TUSCO Ltd''', a joint venture renewable company of the THDC India Ltd and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA)<ref>https://energy.economictimes.indiatimes.com/news/renewable/pm-modi-to-lay-foundation-stone-of-ultra-mega-solar-park-in-jhansi/87791056</ref>


==Background==
==Background==
Ministry of New and Renewable Energy(MNRE), Government of India, has allocated 2000MW of Mega Renewable Energy Power Parks (UMREPPs)  to be developed in the state of UP. Accordingly, a Memorandum of Understanding (MoU) between THDCIL and Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) was signed on 06.08.2020 for formation of a Joint Venture Company, which came to be known as TUSCO Limited.
Ministry of New and Renewable Energy(MNRE), Government of India, has allocated 2000MW of Mega Renewable Energy Power Parks (UMREPPs)  to be developed in the state of UP. Accordingly, a Memorandum of Understanding (MoU) between THDCIL and Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) was signed on 06.08.2020 for formation of a Joint Venture Company, which came to be known as TUSCO Limited.


TUSCO Ltd., the JV Co. of THDCIL and UPNEDA with equity participation of THDCIL and UPNEDA in the ratio of 74:26 respectively, was incorporated on 12th September 2020.<ref>https://www.pv-magazine-india.com/2021/11/16/pm-narendra-modi-to-lay-foundation-stone-of-600-mw-solar-park-in-jhansi/</ref>
TUSCO Ltd., the JV Co. of THDCIL and UPNEDA with equity participation of THDCIL and UPNEDA in the ratio of 74:26 respectively, was incorporated on 12 September 2020.<ref>https://www.pv-magazine-india.com/2021/11/16/pm-narendra-modi-to-lay-foundation-stone-of-600-mw-solar-park-in-jhansi/</ref>


==Projects==
==Projects==
Line 16: Line 20:
===800 MW UMREPP at Chitrakoot===
===800 MW UMREPP at Chitrakoot===
MNRE has accorded in-principle approval to M/s TUSCO Ltd. for setting up 800 MW UMREPP at Tehsil Mau in District Chitrakoot on 18.08.2021. The land requirement for Chitrakoot Solar Park is 4000 acres (approx.) and the area of land spreads across the  9 villages namely Kharagdah, Chhataini Mafi, Manka Chhataini, Gahur, Kotwa Mafi, Dondiya Mafi, Kataiya Dandi, Chharehara and Chachokhar. Total private land approx. 2677 acres and government land approx. 1323 acres have been identified for the project. The process of land acquisition for the solar project is underway. The land for the solar project is being acquired on lease basis for 30 years. Chitrakoot Solar Park is expected to be commissioned by December 2025.<ref>https://www.indiatoday.in/india-today-insight/story/how-bundelkhand-is-powering-up-s-solar-industry-1760719-2021-01-19</ref>
MNRE has accorded in-principle approval to M/s TUSCO Ltd. for setting up 800 MW UMREPP at Tehsil Mau in District Chitrakoot on 18.08.2021. The land requirement for Chitrakoot Solar Park is 4000 acres (approx.) and the area of land spreads across the  9 villages namely Kharagdah, Chhataini Mafi, Manka Chhataini, Gahur, Kotwa Mafi, Dondiya Mafi, Kataiya Dandi, Chharehara and Chachokhar. Total private land approx. 2677 acres and government land approx. 1323 acres have been identified for the project. The process of land acquisition for the solar project is underway. The land for the solar project is being acquired on lease basis for 30 years. Chitrakoot Solar Park is expected to be commissioned by December 2025.<ref>https://www.indiatoday.in/india-today-insight/story/how-bundelkhand-is-powering-up-s-solar-industry-1760719-2021-01-19</ref>