16,952
edits
->The Anomebot2 (Replacing geodata: {{coord missing|Kerala}}) |
CleanupBot (talk | contribs) m (clean up) |
||
Line 4: | Line 4: | ||
{{Short description|A dam in Kerala, India}} | {{Short description|A dam in Kerala, India}} | ||
'''Moozhiyar Dam''' is a small dam located close to [[Kakki Reservoir|Kaki Reservoir]] in [[Ranni]] Forest, [[Sitathod Grama Panchayath|Sitathod Grama Panchayat]], [[Pathanamthitta]] District, [[Kerala]]. The Kakkad Hydroelectric Project is powered by water from the dam. <ref>{{Citation|title=മൂഴിയാർ ഡാമിൻറെ ഷട്ടറുകൾ തുറക്കും {{!}} Moozhiyar dam|url=https://www.youtube.com/watch?v=f2jTgw9h0k4|language=en|access-date=2021-07-21}}</ref>The water level is set at 192.5 meters. KSEB is responsible for the maintenance of the dam and other ancillary works. The Kakkad Hydroelectric Project generates 50 MW of electricity using 2 turbines of 25 MW each year.<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-26|website=www.kseb.in}}</ref> The annual output is 262 MU. The machine was commissioned on 16 September 1999. Kakkad Hydro electric Project is the second stage development of [[Pamba River|Pamba river]] basin. The installed capacity is 50 MW (2 x 25MW). This scheme utilises the tail race water from Sabarigiri power station and flow received from [[moozhiyar]] and velluthode rivers. Two dams feed water to the powerhouse. The Moozhiyar Dam creates the main reservoir of this project.<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-21|website=www.kseb.in}}</ref>Taluks through which release flow are | '''Moozhiyar Dam''' is a small dam located close to [[Kakki Reservoir|Kaki Reservoir]] in [[Ranni]] Forest, [[Sitathod Grama Panchayath|Sitathod Grama Panchayat]], [[Pathanamthitta]] District, [[Kerala]]. The Kakkad Hydroelectric Project is powered by water from the dam.<ref>{{Citation|title=മൂഴിയാർ ഡാമിൻറെ ഷട്ടറുകൾ തുറക്കും {{!}} Moozhiyar dam|url=https://www.youtube.com/watch?v=f2jTgw9h0k4|language=en|access-date=2021-07-21}}</ref> The water level is set at 192.5 meters. KSEB is responsible for the maintenance of the dam and other ancillary works. The Kakkad Hydroelectric Project generates 50 MW of electricity using 2 turbines of 25 MW each year.<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-26|website=www.kseb.in}}</ref> The annual output is 262 MU. The machine was commissioned on 16 September 1999. Kakkad Hydro electric Project is the second stage development of [[Pamba River|Pamba river]] basin. The installed capacity is 50 MW (2 x 25MW). This scheme utilises the tail race water from Sabarigiri power station and flow received from [[moozhiyar]] and velluthode rivers. Two dams feed water to the powerhouse. The Moozhiyar Dam creates the main reservoir of this project.<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-21|website=www.kseb.in}}</ref> Taluks through which release flow are | ||
[[Ranni]], [[Konni, Kerala|Konni]], [[Kozhencherry]], [[Thiruvalla]], [[Chengannur]], [[Kuttanad | [[Ranni]], [[Konni, Kerala|Konni]], [[Kozhencherry]], [[Thiruvalla]], [[Chengannur]], [[Kuttanad]]u, [[Mavelikkara|Mavelikara]] and [[Karthikappally]].<ref>{{Cite web|title=MOOZHIYAR DAM – KSEB Limted Dam Safety Organisation|url=https://dams.kseb.in/?p=125|access-date=2021-07-26|language=en-US}}{{CC-notice|cc=bysa2.5}}</ref> | ||
==Specifications== | ==Specifications== | ||
Line 27: | Line 27: | ||
==Reservoir== | ==Reservoir== | ||
Size of the Water Spread Area is 0.1457 km<sup>2</sup> and the Full Reservoir Level (FRL) is at 192.63 m. Minimum Drawdown level (MDDL) is 181.36 m and Effective Storage at FRL is at 1.16 MCM<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-07|website=www.kseb.in}}</ref> Sabari giri Power Station commissioned during 1966 -67 with six generators having vertical shaft pelton turbine as the prime mover. After power generation, water from the power station is released to the Moozhiyar reservoir | Size of the Water Spread Area is 0.1457 km<sup>2</sup> and the Full Reservoir Level (FRL) is at 192.63 m. Minimum Drawdown level (MDDL) is 181.36 m and Effective Storage at FRL is at 1.16 MCM<ref>{{Cite web|title=Kerala State Electricity Board Limited - Pamba Basin HydroProjects|url=https://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en|access-date=2021-07-07|website=www.kseb.in}}</ref> Sabari giri Power Station commissioned during 1966 -67 with six generators having vertical shaft pelton turbine as the prime mover. After power generation, water from the power station is released to the Moozhiyar reservoir | ||
==References== | ==References== |