no edit summary
imported>Aakash Singh India No edit summary |
imported>Aakash Singh India No edit summary |
||
Line 10: | Line 10: | ||
| type = [[Freight rail]] | | type = [[Freight rail]] | ||
| system = | | system = | ||
| status = 306 km Operational | | status = 306 km Operational (rest Under-construction) | ||
| locale = [[ | | locale = [[Delhi]], [[Uttar Pradesh]], [[Haryana]], [[Rajasthan]], [[Gujarat]] and [[Maharashtra]] | ||
| start = [[Dadri | | start = '''North:''' [[Dadri]], [[Uttar Pradesh]] | ||
| end = [[Jawaharlal Nehru Port Trust|JNPT]], [[Navi Mumbai]] | | end = '''South:''' [[Jawaharlal Nehru Port Trust|JNPT]], [[Navi Mumbai]] | ||
| stations = | | stations = | ||
| ridership2 = | | ridership2 = | ||
| owner = [[Indian Railways]] | | owner = [[Indian Railways]] | ||
| operator = [[Dedicated Freight Corridor Corporation of India|DFCCIL]] | | operator = [[Dedicated Freight Corridor Corporation of India|DFCCIL]] | ||
| character = | | character = | ||
| stock = | | stock = | ||
| linelength_km = 1504 | | linelength_km = 1504 | ||
| tracklength = | | tracklength = | ||
| gauge = {{RailGauge|5ft6in}} [[5 ft 6 in gauge railway|Indian broad gauge]] | |||
| gauge = {{RailGauge|5ft6in}} [[5 ft 6 in gauge railway|Indian broad gauge]] | | speed = | ||
| speed = | | elevation = | ||
| elevation = | |||
|map = {{Maplink|frame=yes|plain=yes|frame-width=290|frame-height=300|zoom=4|frame-align=center|type=line|stroke-width=3|id= Q17141138|title=Western Dedicated Freight Corridor}} | |map = {{Maplink|frame=yes|plain=yes|frame-width=290|frame-height=300|zoom=4|frame-align=center|type=line|stroke-width=3|id= Q17141138|title=Western Dedicated Freight Corridor}} | ||
|map_state = | |map_state = | ||
Line 31: | Line 30: | ||
{{Western Dedicated Freight Corridor}} | {{Western Dedicated Freight Corridor}} | ||
'''Western Dedicated Freight Corridor''' or '''Western DFC''' is a [[5 ft 6 in gauge railway|broad gauge]] freight corridor | '''Western Dedicated Freight Corridor''' or '''Western DFC''' is a 1,504 km long, under-construction [[5 ft 6 in gauge railway|broad gauge]] freight corridor in [[India]]. It will connect [[Dadri]] in [[Uttar Pradesh]] (near [[Delhi]]) with [[Jawaharlal Nehru Port]] in [[Navi Mumbai]], [[Maharashtra]]. This corridor is being built by the [[Dedicated Freight Corridor Corporation of India|DFCCIL]] ([[Indian Railways]]) and would be electrified with double-line operation. Western DFC entails a new single-line branch from Prithla ([[Palwal district|Palwal]]) to Tughlakabad ([[Delhi]]) running parallel to existing [[New Delhi railway station|New Delhi]]–[[Mathura Junction railway station|Mathura Jn.]] main passenger line. | ||
Western DFC is exclusively for transporting | Western DFC is exclusively for transporting freight at higher speed with increased load-carrying capacity. Main freight includes fertilizers, food grains, salt, coal, iron, steel and cement. It uses [[Butt_welding#Flash|Flash Butt Welded]] [[Rail_profile|head]]-[[Hardening (metallurgy)|hardened]] (HH) 250m-long [[Track (rail transport)|rails]] with track's axle load capacity of 32.5t compared to the existing 25t axle load used on Indian rail tracks. | ||
The [[Eastern Dedicated Freight Corridor]] (Eastern DFC) has a 46 km long branch line, that connects [[Khurja]] in [[Bulandshahr district]] on Eastern DFC with [[Dadri]] in [[Gautam Buddha Nagar district]] on the Western DFC. | |||
== | ==About DFC== | ||
India's first 2 DFCs, | The [[Government of India]] established the [[Dedicated Freight Corridor Corporation of India]] (DFCCIL) on 30 October 2006 to undertake construction of this project.<ref name=dfcinfratech1>[https://www.railway-technology.com/projects/western-dedicated-freight-corridor/ Western Dedicated Freight Corridor, India], Railway-technology.com.</ref> India's first 2 DFCs, Western Dedicated Freight Corridor from [[Dadri]] in [[Uttar Pradesh]] to [[Navi Mumbai]] in [[Maharashtra]] and [[Eastern Dedicated Freight Corridor]] (Eastern DFC) from [[Ludhiana]] in [[Punjab, India|Punjab]] to [[Dankuni]] in [[West Bengal]], via [[Khurja]] are aimed at decongesting the railway network by moving 70% of India's goods train to these two corridors. As of August 2021, both DFCs are on track for completion by June 2022.<ref name=kya1/> | ||
==Route== | ==Route== | ||
The Western Dedicated Freight Corridor will begin at [[Dadri | The Western Dedicated Freight Corridor (Western DFC) will begin at [[Dadri]] in [[Uttar Pradesh]] (near [[Delhi]]) covering a new patch of railway line between [[Dadri]] - [[Rewari]] and then will run parallel to existing railway line via [[Narnaul]], [[Sri Madhopur]] and [[Reengus]] (Sikar). The other important station will be [[Phulera]] and [[Marwar|Marwar Junction]] in [[Rajasthan]], [[Palanpur]], [[Amli, India|Amli Road]] ([[Sabarmati railway station|Sabarmati]]), [[Makarpura]] ([[Vadodara]]), [[Gothangam railway station|Gothangam]]/ [[Kosad]] in [[Gujarat]] and [[Vasai Road railway station|Vasai Road]] in [[Maharashtra]] before it terminates at [[Jawaharlal Nehru Port Trust|JNPT]] (Nhava Sheva Port) in [[Maharashtra]]'s [[Raigad district]].<ref name=dfcinfratech1/> | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 80: | Line 72: | ||
==Construction== | ==Construction== | ||
The DFCCIL has divided the construction work of the Western DFC into 5 section for contracting purposes.<ref>{{cite news|last1=Das|first1=Mamuni|title=Rlys’ reluctance to cede control delays $1-billion World Bank loan|url=http://www.thehindubusinessline.com/economy/logistics/rlys-reluctance-to-cede-control-delays-1billion-world-bank-loan/article4577431.ece|access-date=5 May 2014|work=The Hindu Business Line|date=3 April 2013|language=en}}</ref> The 141 km long [[Dadri]]–[[Rewari]] section also including Prithla–Tughlaqabad branch line. | |||
{| class="sortable wikitable" | {| class="sortable wikitable" | ||
Line 93: | Line 85: | ||
! Completion Date | ! Completion Date | ||
|- | |- | ||
| [[Dadri]] | | [[Dadri]] – [[Rewari]] | ||
| style="text-align:center;"|141 | | style="text-align:center;"|141 | ||
| Dadri-Rewari | | Dadri-[[Greater Noida]]-Prithla-Sohna-Rewari | ||
| {{pending|Under construction}} | | {{pending|Under construction}} | ||
|L&T-Sojitz | | [[Larsen & Toubro|L&T]]-[[Sojitz]] consortium<ref>{{cite news|last1=Tandon|first1=Shubhra|title=Larsen & Toubro set to win Rs 4,000 cr western dedicated freight corridor project|url=http://www.financialexpress.com/industry/companies/larsen-toubro-set-to-win-rs-4000-cr-western-dedicated-freight-corridor-project/340842/|work=The Financial Express|date=8 August 2016}}</ref> | ||
| 2021 December | | 2021 December | ||
|- | |- | ||
| [[Rewari]] | | [[Rewari]] – [[Banaskantha district|Iqbalgadh]] | ||
| style="text-align:center;"|641 | | style="text-align:center;"|641 | ||
| Rewari-Phulera (near Jaipur)-Ajmer-Marwar- | | Rewari-Phulera (near [[Jaipur]])-Ajmer-Marwar-Iqbalgadh (near [[Palanpur]]) | ||
| {{active| | | {{active|Partly-operational}} | ||
| [[Larsen & Toubro|L&T]]-[[Sojitz]] | | [[Larsen & Toubro|L&T]]-[[Sojitz]] consortium | ||
| 2021 March | | 2021 March | ||
|- | |- | ||
| [[ | | [[Banaskantha district|Iqbalgadh]] – [[Vadodara]] | ||
| style="text-align:center;"|304 | | style="text-align:center;"|304 | ||
| | | Iqbalgadh (near Palanpur)-Mehsana-Amli Road (near Ahmadabad)-Vadodara | ||
| {{pending|Under construction}} | | {{pending|Under construction}} | ||
| L&T-Sojitz-Gayatri Projects | | [[Larsen & Toubro|L&T]]-[[Sojitz]]-[https://www.gayatri.co.in/ Gayatri Projects] consortium | ||
| 2021 September | | 2021 September | ||
|- | |- | ||
| [[Vadodara]] | | [[Vadodara]] – [[Sachin, Gujarat|Sachin]] | ||
| style="text-align:center;"|163 | | style="text-align:center;"|163 | ||
| Vadodara-[[ | | Vadodara-Sachin (near [[Surat]]) | ||
| {{pending|Under construction}} | | {{pending|Under construction}} | ||
| Mitsui-IRCON-Tata | | [[Mitsui & Co.|Mitsui]]-[[Ircon International|IRCON]]-[[Tata Group|Tata Projects]] consortium<ref name="thbl-5jan16">{{cite news|last1=Kumar|first1=V Rishi|title=Mitsui-led consortium starts work on Western Dedicated Freight Corridor Project|url=http://www.thehindubusinessline.com/economy/logistics/mitsui-tata-projects-ircon-consortium-commence-work-on-western-dedicated-freight-corridor-project/article8068709.ece|work=The Hindu Business Line|date=5 January 2016|language=en}}</ref> | ||
| 2022 June | | 2022 June | ||
|- | |- | ||
| [[Sachin, Gujarat|Sachin]] | | [[Sachin, Gujarat|Sachin]] – [[Jawaharlal Nehru Port|JNPT]] | ||
| style="text-align:center;"|265 | | style="text-align:center;"|265 | ||
| | | Sachin (near Surat)-Valsad-Vasai Road-Jawaharlal Nehru Port | ||
| {{pending|Under construction}} | | {{pending|Under construction}} | ||
| Mitsui-IRCON-Tata | | [[Mitsui & Co.|Mitsui]]-[[Ircon International|IRCON]]-[[Tata Group|Tata Projects]] consortium<ref name="thbl-5jan16"/> | ||
| 2022 June | | 2022 June | ||
|- | |- | ||
! Total | ! Total | ||
! | ! 1,504 | ||
| | | | ||
| | | | ||
Line 135: | Line 127: | ||
| | | | ||
|} | |} | ||
==Status updates== | |||
* '''Oct 2006:''' The [[Dedicated Freight Corridor Corporation of India]] (DFCCIL) is formed by the Ministry of Railways on 30 October 2006. | |||
* '''Aug 2018:''' On 15 August 2018, DFCCIL successfully conducted the inaugural run of an Indian Railways freight train along the 190 km segment between New Ateli and New Phulera stations.<ref>{{cite web|url=https://www.thehindu.com/news/national/ateli-enters-history-on-a-freight-train/article24861766.ece|title=Ateli enters history on a freight train|first=Yuthika|last=Bhargava|date=4 September 2018|via=www.thehindu.com}}</ref> | |||
* '''Dec 2019:''' In 28 December 2019, DFCCIL successfully tested the 306 km stretch between Kishangarh Balawas (Rewari) and Madar (Ajmer). | |||
* '''July 2020:''' In July 2020, testing for the 352.7 km Madar to Palanpur stretch was completed.<ref>[http://www.maritimegateway.com/dfccil-launches-trial-run-new-palanpur-durai DFCCIL launches trial run]</ref> At that time, 99% of the required land for the two corridors had been acquired, and 56% of the WDFC and 60% of the EDFC were complete.<ref name=kya1>[https://economictimes.indiatimes.com/industry/transportation/railways/railways-two-big-ticket-projects-dfc-bullet-train-on-track-despite-lockdown-railway-board-chairman-vk-yadav/articleshow/76856700.cms Railways' two big ticket projects DFC, bullet train on track despite lockdown: Railway Board Chairman VK Yadav]. Economic Times, 6 June 2020.</ref> | |||
* '''Jan 2021:''' The 306 km route commenced operations on 7 January 2021. | |||
==See also== | ==See also== |