Himachal Pradesh State Electricity Board: Difference between revisions

Created by AnomieBOT
Last edited October 1, 2025
>AnomieBOT
m Dating maintenance tags: {{Typo help inline}}
 
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Short description|Indian electrical contractor}}
{{Use dmy dates|date=September 2019}}
{{Use dmy dates|date=September 2019}}
{{Use Indian English|date=September 2019}}
{{Use Indian English|date=September 2019}}
Line 8: Line 9:
{{Infobox company
{{Infobox company
| name = Himachal Pradesh State Electricity Board Limited
| name = Himachal Pradesh State Electricity Board Limited
| logo = HBSEBL logo.jpg
| logo =
| logo_size =  
| logo_size =  
| native_name = विद्युत भवन
| native_name = विद्युत भवन
Line 17: Line 18:
| location = [[Annadale, Shimla|Annadale]] Road, Kumar House, [[Shimla]], [[Himachal Pradesh]], [[India]]
| location = [[Annadale, Shimla|Annadale]] Road, Kumar House, [[Shimla]], [[Himachal Pradesh]], [[India]]
| area_served = [[Himachal Pradesh]]
| area_served = [[Himachal Pradesh]]
| key_people = Chairman - ''' Shri Ram Subhag Singh (IAS)'''   
| key_people = Chairman - ''' Shri Prabodh Saxena (IAS)'''   
     Managing Director - '''Er. R.K Sharma '''
     Managing Director - '''Er. Sandeep Kumar'''
| products = Electricity Distribution
| products = Electricity Distribution
| revenue =  
| revenue =  
Line 25: Line 26:
| num_employees =  
| num_employees =  
| homepage = https://www.hpseb.in
| homepage = https://www.hpseb.in
}}'''Himachal Pradesh State Electricity Board Limited''' ('''HPSEBL''') is a (state government undertaking) electricity board operating within the state of [[Himachal Pradesh]], [[India]], that generates and supplies power through a network of transmission, sub- transmission, and distribution lines. Himachal Pradesh State Electricity Board which was constituted on 1 September 1971<ref>{{Cite web|url=http://www.hpseb.com/history.html|title=History|website=www.hpseb.com|access-date=2018-04-12}}</ref> in accordance with the provisions of Electricity Supply Act (1948)<ref>{{Cite web|url=http://www.cercind.gov.in/ElectSupplyAct1948.pdf|title=Electricity Supply Act (1948)}}</ref> and has been reorganized as Himachal Pradesh State Electricity Board Limited from 2010<ref>{{Cite news|url=http://indianexpress.com/article/cities/chandigarh/hpseb-is-now-history/|title=HPSEB is now history|date=2010-05-26|work=The Indian Express|access-date=2018-04-12|language=en-US}}</ref><ref>{{Cite web|url=http://www.hpseb.com/notification(office%20order)/A.A.R.%202010-11.pdf|title=First Annual Administrative Report of Himachal Pradesh State EIectricity Board :imited}}</ref> under company act 1956.
}}
'''Himachal Pradesh State Electricity Board Limited''' ('''HPSEBL''') is a (state government undertaking) electricity board operating within the state of [[Himachal Pradesh]], [[India]], that generates and supplies power through a network of transmission, sub- transmission, and distribution lines. Himachal Pradesh State Electricity Board which was constituted on 1 September 1971<ref>{{Cite web|url=http://www.hpseb.com/history.html|title=History|website=www.hpseb.com|access-date=2018-04-12}}</ref> in accordance with the provisions of Electricity Supply Act (1948)<ref>{{Cite web|url=http://www.cercind.gov.in/ElectSupplyAct1948.pdf|title=Electricity Supply Act (1948)}}</ref> and has been reorganized as Himachal Pradesh State Electricity Board Limited from 2010<ref>{{Cite news|url=http://indianexpress.com/article/cities/chandigarh/hpseb-is-now-history/|title=HPSEB is now history|date=2010-05-26|work=The Indian Express|access-date=2018-04-12|language=en-US}}</ref><ref>{{Cite web|url=http://www.hpseb.com/notification(office%20order)/A.A.R.%202010-11.pdf|title=First Annual Administrative Report of Himachal Pradesh State EIectricity Board Limited}}</ref> under company act 1956.


== Restructuring ==
== Restructuring ==
Line 31: Line 33:


== Functions ==
== Functions ==
HPSEBL is responsible for the supply of Uninterrupted & Quality power to all consumers in Himachal Pradesh. Power is being supplied through a network of Transmission, Sub-Transmission & Distribution lines laid in the state. Since its inception, Board has made long strides in executing the targets entrusted to it.
HPSEBL is responsible for the supply of Uninterrupted & Quality power to all consumers in Himachal Pradesh. Power is being supplied through a network of Transmission, Sub-Transmission & Distribution lines laid in the state. Since its inception, Board has made long strides in executing the targets entrusted to it


== Himachal Pradesh Area Load Despatch Centre (HPALDC) ==
== Himachal Pradesh Area Load Despatch Centre (HPALDC) ==
Line 162: Line 164:
* Himachal Pradesh has the honor of providing electricity at lowest tariff in the country.
* Himachal Pradesh has the honor of providing electricity at lowest tariff in the country.
* Himachal Pradesh achieved unique distinction of 100% metering, billing and collection.
* Himachal Pradesh achieved unique distinction of 100% metering, billing and collection.
* Achieved highest household/consumer coverage ratio in the country i.e. about 98% as per REC's survey & they have been adjudged one of the best Board's in the country.
* Achieved highest household/consumer coverage ratio in the country i.e. about 98% as per REC's survey & they have been adjudged one of the best Board's in the country.
* Installed and commissioned a power house at the highest altitude in the world (Rongtong Power House at an altitude of approx. 12,000&nbsp;ft.).
* Installed and commissioned a power house at the highest altitude in the world (Rongtong Power House at an altitude of approx. 12,000&nbsp;ft.).
* Installed and commissioned a totally underground Power House which is unique in Asia (Bhaba Power House – 120 MW).
* Installed and commissioned a totally underground power House which is unique in Asia (Bhaba Power House – 120 MW).
* Introduced Hassle-free online Utility Bill Payments Systems.
* Introduced Hassle-free online Utility Bill Payments Systems.
* Started 128-bit SSL encryption – secure e-commerce systems.
* Started 128-bit SSL encryption – secure e-commerce systems.
Line 177: Line 179:
* [http://www.cercind.gov.in/ElectSupplyAct1948.pdf Electricity Supply Act (1948)]  
* [http://www.cercind.gov.in/ElectSupplyAct1948.pdf Electricity Supply Act (1948)]  
* [http://www.cercind.gov.in/Act-with-amendment.pdf Indian Electricity Act]
* [http://www.cercind.gov.in/Act-with-amendment.pdf Indian Electricity Act]
* [https://govttyari.in/hpseb/ HPSEB Job Vacancy]


{{Power stations of Himachal Pradesh}}
{{Power stations of Himachal Pradesh}}

Latest revision as of 21:55, 1 October 2025


Himachal Pradesh State Electricity Board Limited
Native name
विद्युत भवन
IndustryElectricity generation, transmission, distribution
Founded1 September 1971
HeadquartersAnnadale Road, Kumar House, Shimla, Himachal Pradesh, India
Area served
Himachal Pradesh
Key people
Chairman - Shri Prabodh Saxena (IAS) Managing Director - Er. Sandeep Kumar
ProductsElectricity Distribution
Websitehttps://www.hpseb.in

Himachal Pradesh State Electricity Board Limited (HPSEBL) is a (state government undertaking) electricity board operating within the state of Himachal Pradesh, India, that generates and supplies power through a network of transmission, sub- transmission, and distribution lines. Himachal Pradesh State Electricity Board which was constituted on 1 September 1971[1] in accordance with the provisions of Electricity Supply Act (1948)[2] and has been reorganized as Himachal Pradesh State Electricity Board Limited from 2010[3][4] under company act 1956.

Restructuring[edit | edit source]

The Himachal Pradesh State Electricity Board has been re-organized as Himachal Pradesh State Electricity Board Ltd. w.e.f. 14.06.2010 under Company Act.1956.

Functions[edit | edit source]

HPSEBL is responsible for the supply of Uninterrupted & Quality power to all consumers in Himachal Pradesh. Power is being supplied through a network of Transmission, Sub-Transmission & Distribution lines laid in the state. Since its inception, Board has made long strides in executing the targets entrusted to it

Himachal Pradesh Area Load Despatch Centre (HPALDC)[edit | edit source]

Himachal Pradesh Area Load Despatch Center has been established to ensure integrated operation of the power system of HPSEBL with the Northern Region Load Dispatch Center of India[5] to Monitor system parameters and security, System studies, planning and contingency analysis, Analysis of tripping and facilitating remedial measures, Daily scheduling and operational planning, Facilitating bilateral exchanges, Computation of energy dispatch and drawal[check spelling] values using SEMs, Augmentation of telemetry, computing and communication facilities.[6]

Generation[edit | edit source]

PROJECTS UNDER OPERATION
Sr. No. Name of Project Name of Basin Installed capacity(MW)
A. STATE SECTOR:
1 Andhra Yamuna 16.95
2 Giri Yamuna 60.00
3. Gumma Yamuna 3.00
4. Rukti Satluj 1.50
5. Chaba Satluj 1.75
6. Rongtong Satluj 2.00
7. Nogli Satluj 2.50
8. Bhaba Satluj 120.00
9. Ganvi Satluj 22.50
10. Binwa Beas 6.00
11. Gaj Beas 10.50
12. Baner Beas 12.00
13. Uhl-II (Bassi) Beas 60.00
14. Larji Beas 126.00
15. Khauli Beas 12.00
16. Sal-II Ravi 2.00
17. Holi Ravi 3.00
18 Bhuri Singh P/House Ravi 0.45
19 Killar Ravi 0.30
20 Thirot Ravi 4.50
Total 466.95

Notable Achievements[edit | edit source]

  • Himachal Pradesh achieved 100 percent Electrification in to all its census villages in the year 1988.
  • Ensured 24 x 7 uninterrupted Power Supply.
  • Himachal Pradesh has the honor of providing electricity at lowest tariff in the country.
  • Himachal Pradesh achieved unique distinction of 100% metering, billing and collection.
  • Achieved highest household/consumer coverage ratio in the country i.e. about 98% as per REC's survey & they have been adjudged one of the best Board's in the country.
  • Installed and commissioned a power house at the highest altitude in the world (Rongtong Power House at an altitude of approx. 12,000 ft.).
  • Installed and commissioned a totally underground power House which is unique in Asia (Bhaba Power House – 120 MW).
  • Introduced Hassle-free online Utility Bill Payments Systems.
  • Started 128-bit SSL encryption – secure e-commerce systems.
  • Ensured safe and timely Energy bills payments using Credit/Debit cards or Net-banking

References[edit | edit source]

  1. "History". www.hpseb.com. Retrieved 12 April 2018.
  2. "Electricity Supply Act (1948)" (PDF).
  3. "HPSEB is now history". The Indian Express. 26 May 2010. Retrieved 12 April 2018.
  4. "First Annual Administrative Report of Himachal Pradesh State EIectricity Board Limited" (PDF).
  5. "Northern Region Load Dispatch Center of India".
  6. "|| Himachal Pradesh Area Load Despatch & Communication Centre ||". hpaldc.org. Retrieved 12 April 2018.

External links[edit | edit source]

Template:Power stations of Himachal Pradesh

Template:Power Projects in Himachal Pradesh