'''Khurja super thermal power project''' or '''Khurja STPS''' is a proposed 1320 [[megawatt]],<ref>{{Cite news|url=https://www.livemint.com/Politics/CqkGXTN6lqvRvoR28IASVL/Centres-green-nod-to-Rs9747-crore-Khurja-power-project-in.html|title=Centre’s green nod to Rs9,747 crore Khurja power project in UP|last=PTI|date=2017-04-02|work=Mint|access-date=2018-08-03}}</ref> [[coal-fired plant|coal-fired]] supercritical power plant planned to be built at [[Khurja]] in [[Bulandshahr]], [[Uttar Pradesh]], [[India]]. The project is the first thermal power project by [[THDC Ltd]], projected to cost ₹12676 crores (US$1.8 billion). It is a two unit power plant, with the first unit expected to be  completed by November 2022 and the second by April 2023.
'''Khurja super thermal power project''' or '''Khurja STPS''' is a proposed 1320 [[megawatt]],<ref>{{Cite news|url=https://www.livemint.com/Politics/CqkGXTN6lqvRvoR28IASVL/Centres-green-nod-to-Rs9747-crore-Khurja-power-project-in.html|title=Centre's green nod to Rs9,747 crore Khurja power project in UP|last=PTI|date=2017-04-02|work=Mint|access-date=2018-08-03}}</ref> [[coal-fired plant|coal-fired]] supercritical power plant planned to be built at [[Khurja]] in [[Bulandshahr]], [[Uttar Pradesh]], [[India]]. The project is the first thermal power project by [[THDC Ltd]], projected to cost ₹12676 crores (US$1.8 billion). It is a two unit power plant, with the first unit expected to be  completed by November 2022 and the second by April 2023.


==Project==
==Project==
[[THDC Ltd]] floated tenders for award of main package in June 2018. Land has been acquired by THDC and project completion is planned by 2023. The coal requirement would be 7.2 million tonnes per annum which will be sourced from the Amelia Coal mines in Madhya Pradesh.<ref>https://energy.economictimes.indiatimes.com/news/power/thdc-to-float-rs-8000-crore-tender-for-khurja-thermal-power-plant/64436298</ref><ref>{{Cite news|url=https://timesofindia.indiatimes.com/city/lucknow/PIB-grants-pre-construction-clearance-to-Khurja-Super-Thermal-Power-Plant/articleshow/48717165.cms|title=PIB grants pre-construction clearance to Khurja Super Thermal Power Plant - Times of India|work=The Times of India|access-date=2018-08-03}}</ref>
[[THDC Ltd]] floated tenders for award of main package in June 2018. Land has been acquired by THDC and project completion is planned by 2023. The coal requirement would be 7.2 million tonnes per annum which will be sourced from the Amelia Coal mines in Madhya Pradesh.<ref>{{Cite web|url=https://energy.economictimes.indiatimes.com/news/power/thdc-to-float-rs-8000-crore-tender-for-khurja-thermal-power-plant/64436298|title=THDC to float Rs 8,000 crore tender for Khurja thermal power plant - ET EnergyWorld}}</ref><ref>{{Cite news|url=https://timesofindia.indiatimes.com/city/lucknow/PIB-grants-pre-construction-clearance-to-Khurja-Super-Thermal-Power-Plant/articleshow/48717165.cms|title=PIB grants pre-construction clearance to Khurja Super Thermal Power Plant - Times of India|work=The Times of India|access-date=2018-08-03}}</ref>


==Clearances==
==Clearances==
The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC).<ref>https://www.business-standard.com/article/news-ians/khurja-super-thermal-power-plant-gets-environmental-clearance-117040301282_1.html</ref> The environmental impact assessment report was submitted to MoEF&CC in November 2016.<ref>http://www.environmentclearance.nic.in/writereaddata/EIA/071220166HP7XLOZKhurjaSTPPEIAReport.pdf</ref>
The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC).<ref>{{Cite news|url=https://www.business-standard.com/article/news-ians/khurja-super-thermal-power-plant-gets-environmental-clearance-117040301282_1.html|title = Khurja Super Thermal Power Plant gets environmental clearance|newspaper = Business Standard India|date = 3 April 2017}}</ref> The environmental impact assessment report was submitted to MoEF&CC in November 2016.<ref>{{Cite web |url=http://www.environmentclearance.nic.in/writereaddata/EIA/071220166HP7XLOZKhurjaSTPPEIAReport.pdf |title=Archived copy |access-date=27 July 2018 |archive-date=27 July 2018 |archive-url=https://web.archive.org/web/20180727181041/http://www.environmentclearance.nic.in/writereaddata/EIA/071220166HP7XLOZKhurjaSTPPEIAReport.pdf |url-status=dead }}</ref>


==Capacity==
==Capacity==
Line 53: Line 53:
{{Reflist}}
{{Reflist}}


{{Portal|India|Energy}}
 
{{Power Plants of Uttar Pradesh}}
{{Power Plants of Uttar Pradesh}}



Latest revision as of 14:25, 14 August 2023

Khurja Super Thermal Power Plant
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).
Official nameKhurja STPS
CountryIndia
LocationDashahra Kherli, Khurja (Bulandshahr)
CoordinatesLua error in Module:Coordinates at line 611: attempt to index field 'wikibase' (a nil value).
StatusProposed
Construction beganDec 2018
Construction cost₹12,676 Crores
(USD $1.83 billion)
Owner(s)THDC Ltd
Operator(s)Mr.Neeraj Sharma
Thermal power station
Primary fuelCoal
Power generation
Script error: No such module "Infobox power station".
Nameplate capacity1320 MW
External links
Websitewww.thdc.co.in

Khurja super thermal power project or Khurja STPS is a proposed 1320 megawatt,[1] coal-fired supercritical power plant planned to be built at Khurja in Bulandshahr, Uttar Pradesh, India. The project is the first thermal power project by THDC Ltd, projected to cost ₹12676 crores (US$1.8 billion). It is a two unit power plant, with the first unit expected to be completed by November 2022 and the second by April 2023.

Project[edit]

THDC Ltd floated tenders for award of main package in June 2018. Land has been acquired by THDC and project completion is planned by 2023. The coal requirement would be 7.2 million tonnes per annum which will be sourced from the Amelia Coal mines in Madhya Pradesh.[2][3]

Clearances[edit]

The project has been accorded environmental clearance by the Ministry of Environment, Forest and Climate Change (MoEF&CC).[4] The environmental impact assessment report was submitted to MoEF&CC in November 2016.[5]

Capacity[edit]

The planned capacity of the thermal power plant is 1320 MW (2 x 660 MW)

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I Unit I 660MW Feb 2024 Tenders floated
Stage I Unit II 660MW Dec 2024 Tender floated

References[edit]

  1. PTI (2 April 2017). "Centre's green nod to Rs9,747 crore Khurja power project in UP". Mint. Retrieved 3 August 2018.
  2. "THDC to float Rs 8,000 crore tender for Khurja thermal power plant - ET EnergyWorld".
  3. "PIB grants pre-construction clearance to Khurja Super Thermal Power Plant - Times of India". The Times of India. Retrieved 3 August 2018.
  4. "Khurja Super Thermal Power Plant gets environmental clearance". Business Standard India. 3 April 2017.
  5. "Archived copy" (PDF). Archived from the original (PDF) on 27 July 2018. Retrieved 27 July 2018.{{cite web}}: CS1 maint: archived copy as title (link)