Project 75 Alpha: Difference between revisions

robot: Create/upgrade articles. If there is a mistake please report on my talk page.
->Derekbridges
(fix sclass)
(robot: Create/upgrade articles. If there is a mistake please report on my talk page.)
Line 1: Line 1:
{{Short description|Indian class of nuclear-attack submarines under development}}
{{Short description|Indian class of nuclear-attack submarines under development}}
{{Use dmy dates|date=July 2019}}
{{Use dmy dates|date=July 2022}}
{{Use Indian English|date=December 2020}}
{{Use Indian English|date=December 2022}}
{{For|the conventional-attack submarine programme|Project 75I-class submarine}}
{{For|the conventional-attack submarine programme|Project 75I-class submarine}}
{|{{Infobox ship begin}}
{|{{Infobox ship begin}}
Line 16: Line 16:
| In commission range = 2030s
| In commission range = 2030s
| Total ships building =  
| Total ships building =  
| Total ships planned = 3+3
| Total ships planned = 6
| Total ships completed =  
| Total ships completed =  
| Total ships active = 0
| Total ships active =
| Total ships laid up =  
| Total ships laid up =  
| Total ships lost =  
| Total ships lost =  
| Total ships retired =  
| Total ships retired =  
| Total ships preserved =  
| Total ships preserved =  
| Cost = {{INRConvert|1.2|lc|lk=lc|year=2020}} total cost<ref name="ETfeb2020"/>
| Cost = {{INRConvert|1.2|lc|lk=lc|year=2022}} total cost<ref name="ETfeb2020"/>
}}
}}
{{Infobox ship characteristics
{{Infobox ship characteristics
Line 29: Line 29:
| Header caption =  
| Header caption =  
| Ship type = [[Nuclear submarine|Nuclear powered]] [[attack submarine]] ([[SSN (hull classification symbol)|SSN]])
| Ship type = [[Nuclear submarine|Nuclear powered]] [[attack submarine]] ([[SSN (hull classification symbol)|SSN]])
| Ship displacement = {{cvt|6000|t}}
| Ship displacement =
| Ship length =  
| Ship length =  
| Ship beam =  
| Ship beam =  
Line 49: Line 49:
| Ship sensors =  
| Ship sensors =  
| Ship EW =  
| Ship EW =  
| Ship armament = [[Varunastra (torpedo)|Varunastra]] heavyweight torpedo, [[Nirbhay]] / [[BrahMos]] / [[BrahMos-II]] land/anti-ship cruise missiles
| Ship armament = [[Varunastra (torpedo)|Varunastra]] heavyweight [[torpedo]], [[Nirbhay]], [[BrahMos]] and [[BrahMos-II]] [[land-attack missile|land-attack]]/[[anti-ship missile|anti-ship]] [[cruise missiles]]
| Ship notes =  
| Ship notes =  
}}
}}
|}
|}


The Indian Navy aims to procure new [[Nuclear submarine|nuclear-powered]] [[attack submarines]] (SSN) under '''Project 75 Alpha'''.<ref>{{Cite news|last=Bhattacharjee|first=Sumit|date=2020-12-04|title=INS Vikrant may be inducted by 2022-23, says ENC Chief|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/andhra-pradesh/ins-vikrant-may-be-inducted-by-2022-23-says-enc-chief/article33243875.ece|access-date=2020-12-04|issn=0971-751X}}</ref> The [[Government of India]] approved the construction of six of such submarines in February 2015.<ref>{{cite news |url=http://articles.economictimes.indiatimes.com/2015-02-18/news/59268906_1_submarines-frigates-indian-ocean-region |title=Government clears construction of 7 stealth frigates, 6 nuclear-powered attack submarines |newspaper=[[The Economic Times]] |date=18 February 2015 |access-date=19 April 2015}}</ref> These will be designed by the Navy's in-house Directorate of Naval Design and built in India at the Shipbuilding Centre at [[Visakhapatnam]]. The construction is expected to commence on 2023-24 while the first submarine is expected to enter service in 2032.
The Indian Navy aims to procure new [[Nuclear submarine|nuclear-powered]] [[attack submarines]] (SSN) under '''Project 75 Alpha'''.<ref>{{Cite news|last=Bhattacharjee|first=Sumit|date=2020-12-04|title=INS Vikrant may be inducted by 2022-23, says ENC Chief|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/andhra-pradesh/ins-vikrant-may-be-inducted-by-2022-23-says-enc-chief/article33243875.ece|access-date=2020-12-04|issn=0971-751X}}</ref> The [[Government of India]] approved the construction of six of such submarines in February 2015.<ref>{{cite news |url=http://articles.economictimes.indiatimes.com/2015-02-18/news/59268906_1_submarines-frigates-indian-ocean-region |title=Government clears construction of 7 stealth frigates, 6 nuclear-powered attack submarines |newspaper=[[The Economic Times]] |date=18 February 2015 |access-date=19 April 2022}}</ref> These will be designed by the Navy's in-house Directorate of Naval Design and built in India at the Shipbuilding Centre at [[Visakhapatnam]]. The construction is expected to commence on 2023-24 while the first submarine is expected to enter service in 2032.


Since India is a traditional user of Russian nuclear submarines (with [[INS Chakra (2011)|INS ''Chakra'']] on lease) the new domestically built submarines would be third class of SSN operated by Indian navy after leased [[Charlie-class submarine|''Charlie I'']] and [[Akula-class submarine|''Akula II'']]-class submarines.<ref name=natinterest>{{cite magazine|url=http://nationalinterest.org/blog/the-buzz/watch-out-china-india-building-6-nuclear-attack-submarines-12276|title=Watch Out, China: India Is Building 6 Nuclear Attack Submarines|magazine=[[The National Interest]]|date=18 February 2015|access-date=19 April 2015}}</ref><ref>{{cite web |title=India finalizing plans to order three more Scorpene submarines |url=http://timesofindia.indiatimes.com/india/India-finalizing-plans-to-order-three-more-Scorpene-submarines/articleshow/50035641.cms |website=The Times of India |access-date=2015-12-04}}</ref>
Since India is a traditional user of Russian nuclear submarines (with [[INS Chakra (2011)|INS ''Chakra'']] on lease) the new domestically built submarines would be third class of SSN operated by Indian navy after leased [[Charlie-class submarine|''Charlie I'']] and [[Akula-class submarine|''Akula II'']]-class submarines.<ref name=natinterest>{{cite magazine|url=http://nationalinterest.org/blog/the-buzz/watch-out-china-india-building-6-nuclear-attack-submarines-12276|title=Watch Out, China: India Is Building 6 Nuclear Attack Submarines|magazine=[[The National Interest]]|date=18 February 2015|access-date=19 April 2022}}</ref><ref>{{cite web |title=India finalizing plans to order three more Scorpene submarines |url=http://timesofindia.indiatimes.com/india/India-finalizing-plans-to-order-three-more-Scorpene-submarines/articleshow/50035641.cms |website=The Times of India |access-date=2015-12-04}}</ref>


==Development==
==Development==
Line 63: Line 63:
The submarines will be powered by a miniature [[Pressurized water reactor|pressurised water reactor]] (PWR) being developed by the [[Bhabha Atomic Research Centre]] which has already supplied a similar 83 MW miniature reactor for the [[Arihant-class submarine]] SSBNs.<ref name=natinterest/>
The submarines will be powered by a miniature [[Pressurized water reactor|pressurised water reactor]] (PWR) being developed by the [[Bhabha Atomic Research Centre]] which has already supplied a similar 83 MW miniature reactor for the [[Arihant-class submarine]] SSBNs.<ref name=natinterest/>


On 24 June 2019, it was reported that {{INRConvert|100|c}} have been allocated for the initial phase of the project. The submarines will be designed by Directorate of Naval Design and the development is expected to continue till 2025. [[Mishra Dhatu Nigam]] is developing a new hull material that is expected to allow the submarine to dive to deeper depths than {{sclass|Arihant|submarine|4}}. A scaled down model of the submarine is planned to be tested first. The total cost of the project is estimated to be around {{INRConvert|1|lc|lk=on|year=2020}}.<ref>{{Cite news|url=https://economictimes.indiatimes.com/news/defence/work-begins-on-indias-next-gen-nuclear-powered-submarines/articleshow/69921014.cms|title=Work begins on India’s next gen nuclear-powered submarines|last=Pubby|first=Manu|date=2019-06-24|work=The Economic Times|access-date=2019-07-02|url-status=live|archive-url=https://web.archive.org/web/20190624164324/https://economictimes.indiatimes.com/news/defence/work-begins-on-indias-next-gen-nuclear-powered-submarines/articleshow/69921014.cms|archive-date=24 June 2019}}</ref>
On 24 June 2019, it was reported that {{INRConvert|100|c}} have been allocated for the initial phase of the project. The submarines will be designed by Directorate of Naval Design and the development is expected to continue till 2025. [[Mishra Dhatu Nigam]] is developing a new hull material that is expected to allow the submarine to dive to deeper depths than {{sclass|Arihant|submarine|4}}. A scaled down model of the submarine is planned to be tested first. The total cost of the project is estimated to be around {{INRConvert|1|lc|lk=on|year=2022}}.<ref>{{Cite news|url=https://economictimes.indiatimes.com/news/defence/work-begins-on-indias-next-gen-nuclear-powered-submarines/articleshow/69921014.cms|title=Work begins on India’s next gen nuclear-powered submarines|last=Pubby|first=Manu|date=2019-06-24|work=The Economic Times|access-date=2019-07-02|url-status=live|archive-url=https://web.archive.org/web/20190624164324/https://economictimes.indiatimes.com/news/defence/work-begins-on-indias-next-gen-nuclear-powered-submarines/articleshow/69921014.cms|archive-date=24 June 2022}}</ref>


In February 2020, ''[[The Economic Times]]'' reported that the preliminary design phase of the programme has been successfully completed. The report stated that Submarine Design Group of the Directorate of Naval Design, assisted by the [[DRDO]], will now start working on the detailed design and construction phase of the programme.<ref name="ETfeb2020">{{Cite news|last=Pubby|first=Manu|url=https://economictimes.indiatimes.com/news/defence/indias-rs-1-2-l-cr-n-submarine-project-closer-to-realisation/articleshow/74234776.cms|title=India’s Rs 1.2 lakh crore nuclear submarine project closer to realisation|date=2020-02-21|work=The Economic Times|access-date=2020-02-23}}</ref>
In February 2020, ''[[The Economic Times]]'' reported that the preliminary design phase of the programme has been successfully completed. The report stated that Submarine Design Group of the Directorate of Naval Design, assisted by the [[DRDO]], will now start working on the detailed design and construction phase of the programme.<ref name="ETfeb2020">{{Cite news|last=Pubby|first=Manu|url=https://economictimes.indiatimes.com/news/defence/indias-rs-1-2-l-cr-n-submarine-project-closer-to-realisation/articleshow/74234776.cms|title=India’s Rs 1.2 lakh crore nuclear submarine project closer to realisation|date=2020-02-21|work=The Economic Times|access-date=2020-02-23}}</ref>
Line 85: Line 85:
[[Category:Nuclear-powered submarines]]
[[Category:Nuclear-powered submarines]]
[[Category:Submarine classes]]
[[Category:Submarine classes]]
[[Category:2020s ships]]
[[Category:Attack submarines]]
[[Category:Attack submarines]]
[[Category:Submarines of the Indian Navy]]
[[Category:Submarines of the Indian Navy]]