'''Rayalaseema Thermal Power Station''' is located at [[Kadapa]] in [[Andhra Pradesh]]. The power plant is one of the [[coal]] based power plants of [[Andhra Pradesh Power Generation Corporation Limited|APGENCO]].<ref name=ADB>http://www2.adb.org/Documents/PPARs/IND/22344-IND-PPAR.pdf {{dead link|date=May 2019}}</ref> | '''Rayalaseema Thermal Power Station''' is located at Yerraguntla (Md) in [[Kadapa]](Dist) in [[Andhra Pradesh]]. The power plant is one of the [[coal]] based power plants of [[Andhra Pradesh Power Generation Corporation Limited|APGENCO]].<ref name=ADB>http://www2.adb.org/Documents/PPARs/IND/22344-IND-PPAR.pdf {{dead link|date=May 2019}}</ref> | ||
== Capacity == | == Capacity == | ||
Line 53: | Line 53: | ||
==Power Plant== | ==Power Plant== | ||
Rayalaseema Thermal Power Plant was developed under 3 stages namely stage I,II and | Rayalaseema Thermal Power Plant was developed under 3 stages namely stage I,II, III and IV. | ||
The station is performing well in the recent years by achieving high plant load factor. It stood first in country during 98–99, 2002–03, 2003–04 and second during 99–2000, 2001–02.<ref>{{cite web|url=http://www.apgenco.gov.in/inner.asp?frm=viewpower&PSId=101&filename=PowerStations.xml&subhname=&pstype=Thermal&Tagname=PowerStations101&hname=Rayalaseema%20TPP|title=Rayalaseema Thermal Power Plant|publisher=Andhra Pradesh Power Generation Corporation Ltd.|accessdate=19 August 2010}}</ref> | The station is performing well in the recent years by achieving high plant load factor. It stood first in country during 98–99, 2002–03, 2003–04 and second during 99–2000, 2001–02.<ref>{{cite web|url=http://www.apgenco.gov.in/inner.asp?frm=viewpower&PSId=101&filename=PowerStations.xml&subhname=&pstype=Thermal&Tagname=PowerStations101&hname=Rayalaseema%20TPP|title=Rayalaseema Thermal Power Plant|publisher=Andhra Pradesh Power Generation Corporation Ltd.|accessdate=19 August 2010}}</ref> | ||
The station has received Meritorious productivity awards for six consecutive years and Incentive award for seven consecutive years.<ref name=ADB /> [[BHEL]] commissioned stage IV unit 1x600MW in March 2018 leading to total installed capacity of RTPP to 1650MW.<ref>https://energy.economictimes.indiatimes.com/news/power/bhel-commissions-600-megawatt-thermal-power-plant-in-andhra-pradesh/63298985</ref> | The station has received Meritorious productivity awards for six consecutive years and Incentive award for seven consecutive years.<ref name=ADB /> [[BHEL]] commissioned stage IV unit 1x600MW in March 2018 leading to total installed capacity of RTPP to 1650MW.<ref>{{Cite web|url=https://energy.economictimes.indiatimes.com/news/power/bhel-commissions-600-megawatt-thermal-power-plant-in-andhra-pradesh/63298985|title = BHEL commissions 600 Megawatt thermal power plant in Andhra Pradesh - ET EnergyWorld}}</ref> | ||