Rayalaseema Thermal Power Station: Difference between revisions

Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1049/2192
>BrownHairedGirl
 
->Citation bot
(Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1049/2192)
Line 34: Line 34:
}}
}}


'''Rayalaseema Thermal Power Station''' is located at [[Kadapa]] in [[Andhra Pradesh]]. The power plant is one of the [[coal]] based power plants of [[Andhra Pradesh Power Generation Corporation Limited|APGENCO]].<ref name=ADB>http://www2.adb.org/Documents/PPARs/IND/22344-IND-PPAR.pdf {{dead link|date=May 2019}}</ref>
'''Rayalaseema Thermal Power Station''' is located at Yerraguntla (Md) in  [[Kadapa]](Dist) in [[Andhra Pradesh]]. The power plant is one of the [[coal]] based power plants of [[Andhra Pradesh Power Generation Corporation Limited|APGENCO]].<ref name=ADB>http://www2.adb.org/Documents/PPARs/IND/22344-IND-PPAR.pdf {{dead link|date=May 2019}}</ref>


== Capacity ==
== Capacity ==
Line 53: Line 53:


==Power Plant==
==Power Plant==
Rayalaseema Thermal Power Plant was developed under 3 stages namely stage I,II and III.
Rayalaseema Thermal Power Plant was developed under 3 stages namely stage I,II, III and IV.
The station is performing well in the recent years by achieving high plant load factor. It stood first in country during 98–99, 2002–03, 2003–04 and second during 99–2000, 2001–02.<ref>{{cite web|url=http://www.apgenco.gov.in/inner.asp?frm=viewpower&PSId=101&filename=PowerStations.xml&subhname=&pstype=Thermal&Tagname=PowerStations101&hname=Rayalaseema%20TPP|title=Rayalaseema Thermal Power Plant|publisher=Andhra Pradesh Power Generation Corporation Ltd.|accessdate=19 August 2010}}</ref>
The station is performing well in the recent years by achieving high plant load factor. It stood first in country during 98–99, 2002–03, 2003–04 and second during 99–2000, 2001–02.<ref>{{cite web|url=http://www.apgenco.gov.in/inner.asp?frm=viewpower&PSId=101&filename=PowerStations.xml&subhname=&pstype=Thermal&Tagname=PowerStations101&hname=Rayalaseema%20TPP|title=Rayalaseema Thermal Power Plant|publisher=Andhra Pradesh Power Generation Corporation Ltd.|accessdate=19 August 2010}}</ref>
The station has received Meritorious productivity awards for six consecutive years and Incentive award for seven consecutive years.<ref name=ADB /> [[BHEL]] commissioned stage IV unit 1x600MW in March 2018 leading to total installed capacity of RTPP to 1650MW.<ref>https://energy.economictimes.indiatimes.com/news/power/bhel-commissions-600-megawatt-thermal-power-plant-in-andhra-pradesh/63298985</ref>
The station has received Meritorious productivity awards for six consecutive years and Incentive award for seven consecutive years.<ref name=ADB /> [[BHEL]] commissioned stage IV unit 1x600MW in March 2018 leading to total installed capacity of RTPP to 1650MW.<ref>{{Cite web|url=https://energy.economictimes.indiatimes.com/news/power/bhel-commissions-600-megawatt-thermal-power-plant-in-andhra-pradesh/63298985|title = BHEL commissions 600 Megawatt thermal power plant in Andhra Pradesh - ET EnergyWorld}}</ref>


== References ==
== References ==
Anonymous user