<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Visakhapatnam_Refinery</id>
	<title>Visakhapatnam Refinery - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Visakhapatnam_Refinery"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Visakhapatnam_Refinery&amp;action=history"/>
	<updated>2026-10-28T03:42:31Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Visakhapatnam_Refinery&amp;diff=277320&amp;oldid=prev</id>
		<title>-&gt;Citation bot: Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1953/2193</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Visakhapatnam_Refinery&amp;diff=277320&amp;oldid=prev"/>
		<updated>2021-10-09T09:20:53Z</updated>

		<summary type="html">&lt;p&gt;Add: title. Changed bare reference to CS1/2. | &lt;a href=&quot;https://en.bharatpedia.org/wiki/BP:UCB&quot; class=&quot;extiw&quot; title=&quot;wp:UCB&quot;&gt;Use this bot&lt;/a&gt;. &lt;a href=&quot;https://en.bharatpedia.org/wiki/BP:DBUG&quot; class=&quot;extiw&quot; title=&quot;wp:DBUG&quot;&gt;Report bugs&lt;/a&gt;. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1953/2193&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{More citations needed|date=September 2018}}&lt;br /&gt;
[[File:HPCL from Yarada hill.jpg|thumb|A view of HPCL (top-left) from Yarada Hill, [[Visakhapatnam]]]]&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Visakhapatnam Refinery&amp;#039;&amp;#039;&amp;#039; (officially: &amp;#039;&amp;#039;&amp;#039;Visakh Refinery&amp;#039;&amp;#039;&amp;#039;), is one of the two [[oil refinery|oil refineries]] of [[HPCL]] in India, the other being [[Mumbai Refinery]]. This was one of the first major industries of [[Visakhapatnam]] and first oil refinery on the East Coast. After the nationalisation, HPCL has transformed itself into a mega Public Sector Undertaking and it is second largest integrated oil company in India.&lt;br /&gt;
&lt;br /&gt;
==History of Visakha refinery==&lt;br /&gt;
&lt;br /&gt;
Visakha refinery was commissioned by Caltex Oil Refining (India) in 1957, with an installed capacity of 0.675{{nbsp}}million [[tonne]] per year.&lt;br /&gt;
&lt;br /&gt;
The facility was acquired by the Government of India in 1976 and amalgamated with HPCL in 1978 by the [http://www.hindustanpetroleum.com/Upload/En/UPdf/CORIL-AMALGAMATION-1978.pdf CORIL-HPCL Amalgamation Order, 1978].&lt;br /&gt;
&lt;br /&gt;
The refinery&amp;#039;s capacity was increased to 4.5{{nbsp}}million tonne per year under the first major expansion project in 1985, known as Visakha Refinery Expansion Project-I (VREP-I).&lt;br /&gt;
&lt;br /&gt;
Its refining capacity was increased to 7.5{{nbsp}}million tonne per year under VREP-II in 1999, and again to 8.3{{nbsp}}million tonne per year in 2010.&lt;br /&gt;
&lt;br /&gt;
==Visakh Refinery Modernisation Project (VRMP)&amp;lt;ref&amp;gt;{{Cite web|url=https://www.hydrocarbons-technology.com/projects/visakh-refinery-modernisation-project-visakhapatnam/|title = Visakh Refinery Modernisation Project, Visakhapatnam - Hydrocarbons Technology}}&amp;lt;/ref&amp;gt; ==&lt;br /&gt;
&lt;br /&gt;
Visakh Refinery Modernisation Project (VRMP) is a brownfield expansion of the Visakh refinery located in Visakhapatnam, India. The project is being executed by the state-owned Hindustan Petroleum Corporation Limited (HPCL).&lt;br /&gt;
&lt;br /&gt;
VRMP will expand the refining capacity of the Visakh refinery from 8.3{{nbsp}}million [[tonne]] per year to 15{{nbsp}}million tonne per year, while enabling the production and distribution of Bharat Stage-VI (BS-VI)-compliant fuels.&lt;br /&gt;
&lt;br /&gt;
BS VI is a new emission standard that will align India&amp;#039;s motor vehicle regulations with European Union (EU) regulations for light-duty passenger cars and commercial vehicles, heavy-duty trucks and buses, and two-wheeled vehicles. The standard is due to be implemented in India from 2020.&lt;br /&gt;
&lt;br /&gt;
The VRMP project is estimated to involve an investment of approximately $3.1bn and is scheduled for completion in 2020.&lt;br /&gt;
&lt;br /&gt;
===Details of Visakh Refinery Modernisation Project===&lt;br /&gt;
&lt;br /&gt;
HPCL received approval from the Ministry of Environment, Forest, and Climate Change (MoEFCC) for the VRMP in February 2016.&lt;br /&gt;
&lt;br /&gt;
The expansion project is being carried out on an area adjacent to the east portion of the existing site.&lt;br /&gt;
&lt;br /&gt;
The scope of the project consists of the installation of primary processing units such as a 9{{nbsp}}million tonne per year crude distillation unit (CDU) replacing one of the three existing CDUs, a 3.3{{nbsp}}million tonne per year vacuum gas oil hydrocracker and a 290,000{{nbsp}} tonne per year naphtha isomerisation unit (NIU).&lt;br /&gt;
&lt;br /&gt;
An additional 3.1{{nbsp}}million tonne per year solvent de-asphalting (SDA) unit, a 2.5{{nbsp}}million tonne per year slurry hydrocracker unit (SHCU) and a 96t/day propylene recovery unit (PRU) are also outlined in the plans.&lt;br /&gt;
&lt;br /&gt;
Other auxiliary units being built under the project include two 113{{nbsp}}million tonne per year hydrogen generation units (HGUs), two 360t/day sulphur recovery units (SRUs) including tail gas treatment units (TGTUs), and a 36,000{{nbsp}} tonne per year fuel gas pressure-swing adsorption (PSA) unit.&lt;br /&gt;
&lt;br /&gt;
A 300t/h non-hydro-processing sour-water stripper (SWS-I), a 185t/h hydro-processing sour-water stripper (SWS-II), two 540t/h amine regeneration units (ARUs), a 112,000{{nbsp}}tonne per year sulphur recovery LPG treating unit will also be installed.&lt;br /&gt;
&lt;br /&gt;
The current effluent treatment plants (EFPs) are set to be replaced by a 1,000m³/h integrated effluent treatment plant (IETP).&lt;br /&gt;
&lt;br /&gt;
Various existing units, including a naphtha hydro-treating unit, a continuous catalytic reformer and a diesel hydro-treating unit are also being revamped as part of the modernisation. Additionally, a duel fuel-powered captive power plant (CPP) will be built.&lt;br /&gt;
&lt;br /&gt;
The project will also involve the construction of a new utility system comprising a re-circulating sea cooling water system consisting of cooling tower cells and water pumps, as well as a demineralised water system featuring a new reverse osmosis (RO) system and water tanks.&lt;br /&gt;
&lt;br /&gt;
==Technology upgrades at Visakh refinery==&lt;br /&gt;
&lt;br /&gt;
VRMP will implement Honeywell UOP Penex™ process technology to produce a high-octane gasoline component called isomerate, and a Unicracking™ hydrocracking unit to produce cleaner burning diesel fuel.&lt;br /&gt;
&lt;br /&gt;
The Penex employs high-activity isomerisation and benzene impregnation catalysts from Honeywell UOP.&lt;br /&gt;
&lt;br /&gt;
Unicracking processes use highly effective catalysts to yield higher quantities of cleaner-burning fuels from a range of feedstock. The innovative configuration of the fractionation unit ensures effective separation of the products, while minimising capital costs and operating expenses.&lt;br /&gt;
&lt;br /&gt;
The two processes will significantly increase the capability of the refinery to deliver petrol and diesel in compliance with the new BS-VI clean fuels standards.&lt;br /&gt;
&lt;br /&gt;
&amp;quot;VRMP will expand the refining capacity of the Visakh refinery from 8.3{{nbsp}}million tonne per year to 15{{nbsp}}million tonne per year, while enabling the production of Bharat Stage-VI (BS-VI)-compliant fuels.&amp;quot;&lt;br /&gt;
The planned integration of innovative technologies will also enhance gross margins of the refinery by generating high-value transportation fuels from low-value raw materials.&lt;br /&gt;
&lt;br /&gt;
==VRCFP (Visakh Refinery Clean Fuels Project)==&lt;br /&gt;
This project was implemented by the Projects Department at Visakh Refinery. This project is essentially to produce fuels for environment improvement at an estimated cost of Rs 16352&amp;amp;nbsp;million with an FE component of Rs 2525&amp;amp;nbsp;million.&lt;br /&gt;
&lt;br /&gt;
The project was approved by the Board on 30 April 2003. M/s EIL is the consultant for the project. Process licensors include M/s UOP, M/s Axens and M/s Belco.&lt;br /&gt;
&lt;br /&gt;
{{Coord missing|Andhra Pradesh}}&lt;br /&gt;
&lt;br /&gt;
{{Use dmy dates|date=September 2019}}&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Oil refineries in India]]&lt;br /&gt;
[[Category:Economy of Visakhapatnam]]&lt;br /&gt;
[[Category:Companies based in Visakhapatnam]]&lt;br /&gt;
[[Category:Energy in Andhra Pradesh]]&lt;br /&gt;
[[Category:1957 establishments in Andhra Pradesh]]&lt;br /&gt;
[[Category:Indian companies established in 1957]]&lt;br /&gt;
[[Category:Hindustan Petroleum]]&lt;br /&gt;
[[Category:Hindustan Petroleum buildings and structures]]&lt;/div&gt;</summary>
		<author><name>-&gt;Citation bot</name></author>
	</entry>
</feed>