<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Second_Ishwar_Gupta_Setu</id>
	<title>Second Ishwar Gupta Setu - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Second_Ishwar_Gupta_Setu"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Second_Ishwar_Gupta_Setu&amp;action=history"/>
	<updated>2026-11-27T10:08:42Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Second_Ishwar_Gupta_Setu&amp;diff=533834&amp;oldid=prev</id>
		<title>ShielaPaxton36: Made First Entry From Scratch</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Second_Ishwar_Gupta_Setu&amp;diff=533834&amp;oldid=prev"/>
		<updated>2025-12-13T01:18:08Z</updated>

		<summary type="html">&lt;p&gt;Made First Entry From Scratch&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|Bridge under construction in Kalyani Expressway, West Bengal}}&lt;br /&gt;
{{Infobox bridge&lt;br /&gt;
| bridge_name      = Second Iswar Gupta Setu&lt;br /&gt;
| native_name      = দ্বিতীয় ঈশ্বর গুপ্ত সেতু&lt;br /&gt;
| native_name_lang =bn&lt;br /&gt;
| image            = [[File:Second Ishwar Gupta Setu Under Construction.jpg|centre|300px]]&lt;br /&gt;
| image_size       = &lt;br /&gt;
| alt              =&lt;br /&gt;
| caption          = The under-construction &amp;#039;&amp;#039;&amp;#039;Second Ishwar Gupta Setu&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
| official_name    = &lt;br /&gt;
| named_for         =[[Ishwar Chandra Gupta]]&lt;br /&gt;
| other_name       = &lt;br /&gt;
| carries          = [[Kalyani Expressway]], Roadway Only&lt;br /&gt;
| crosses          = [[Hooghly River]]&lt;br /&gt;
| locale           = [[Kalyani, West Bengal|Kalyani]], [[Kolkata Metropolitan Region]], {{flag|India}}&lt;br /&gt;
| owner            = [[West Bengal Highway Development Corporation|WBHDC]]&lt;br /&gt;
| maint            = &lt;br /&gt;
| id               = &lt;br /&gt;
| website          =&lt;br /&gt;
| architect        = &lt;br /&gt;
| designer         = [[COWI]]&lt;br /&gt;
| engineering      = &lt;br /&gt;
| design           = [[Extradosed bridge|extadosed]] [[Cable-stayed bridge|cable-stayed]] bridge&lt;br /&gt;
| material         = Concrete, steel&lt;br /&gt;
| length           = {{convert|714|m}}&lt;br /&gt;
| width            = {{convert|35|m}}&lt;br /&gt;
| height           = &lt;br /&gt;
| mainspan         = {{convert|120|m}}&lt;br /&gt;
| spans            = 7&lt;br /&gt;
| pierswater       = &lt;br /&gt;
| load             =&lt;br /&gt;
| clearance        = &lt;br /&gt;
| below            = &lt;br /&gt;
| life             = &lt;br /&gt;
| builder          = [[Larsen &amp;amp; Toubro]]&lt;br /&gt;
| fabricator       = &lt;br /&gt;
| begin            = 2018&lt;br /&gt;
| complete         = &lt;br /&gt;
| cost             = {{INRConvert|1396|c|year=2018}}&lt;br /&gt;
| open             = &lt;br /&gt;
| inaugurated      = &lt;br /&gt;
| toll             = &lt;br /&gt;
| traffic          = &lt;br /&gt;
| lanes           = 6&lt;br /&gt;
| preceded         =&lt;br /&gt;
| followed         =&lt;br /&gt;
| heritage         =&lt;br /&gt;
| collapsed        =&lt;br /&gt;
| closed           =&lt;br /&gt;
| replaces         =  &lt;br /&gt;
| map_cue          =&lt;br /&gt;
| map_image        =&lt;br /&gt;
| map_alt          =&lt;br /&gt;
| map_text         =&lt;br /&gt;
| map_width        =&lt;br /&gt;
| coordinates      = {{Coord|22.967113|N|88.407653|E|type:landmark|display=inline,title}}&lt;br /&gt;
| references       = &amp;lt;ref name=&amp;quot;NFN-Network&amp;quot;/&amp;gt;&lt;br /&gt;
| extra            =&lt;br /&gt;
}}&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Second Ishwar Gupta Setu&amp;#039;&amp;#039;&amp;#039; is an under-construction [[Extradosed bridge|Extradosed]] [[Cable-stayed bridge]] spanning the [[Hooghly River]], connecting [[Kalyani, West Bengal|Kalyani]] with [[Bansberia]] in [[Kolkata Metropolitan Region]]. It will be one of the most important Roadway Bridges of the [[Kolkata metropolitan region]], as it will be the fifth &amp;#039;&amp;#039;&amp;#039;Roadway bridge&amp;#039;&amp;#039;&amp;#039; crossing the [[Hooghly River]] within this Metropolitan area, alongside [[Vidyasagar Setu]], [[Howrah Bridge]], [[Nivedita Setu]] and [[Vivekananda Setu]]. It will facilitate crucial connectivity between the eastern and western parts of the [[Kolkata metropolitan region]]. The bridge is being constructed by [[Larsen &amp;amp; Toubro]], to the design of [[Rail India Technical and Economic Service|RITES]] and is part of the [[Kalyani Expressway]], under the jurisdiction of [[West Bengal Highway Development Corporation]].&amp;lt;ref name=&amp;quot;NFN-Network&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The concept of building a bridge across the [[Hooghly River]] was conceived in 2016. The original plan was to build a bridge as an alternative to the old [[Ishwar Gupta Setu]], which would connect Delhi Road and [[State Highway 6 (West Bengal)|State Highway 6]] with [[Kalyani Expressway]] and [[National Highway 12 (India)|National Highway 12]].&amp;lt;ref name=&amp;quot;NFN-Network&amp;quot;/&amp;gt; The [[Tower#Transportation_support|Pylon]]s of the bridge will lean outward from the deck, and they will be constructed using [[Concrete]]. The deck of the bridge consists of 7 [[Span (engineering)|Span]]s.&lt;br /&gt;
&lt;br /&gt;
== History ==&lt;br /&gt;
=== Plans ===&lt;br /&gt;
The first bridge across the Hooghly River between [[Bansberia|Banshberia]] and [[Kalyani, West Bengal|Kalyani]] was constructed in 1989, but in the 2010s, structural defects and structural weaknesses were noticed in the bridge. A proposal for a new bridge to replace the old one was first raised in 2014.&amp;lt;ref name=&amp;quot;Eisamay1&amp;quot;&amp;gt;{{cite news |last1=Manḍala |first1=Rajata |title=বৃহত্তর কলকাতার গতি ফেরাবে বিকল্প পথ |url=https://eisamay.com/west-bengal-news/ring-road-outside-kolkata-to-reduce-traffic-congestion/articleshow/36649717.cms |access-date=30 January 2024 |work=Eisamay |language=bn}}&amp;lt;/ref&amp;gt; The approval of this bridge project was given by the [[Government of West Bengal]] in 2015.&amp;lt;ref name=&amp;quot;The-Times-of-India&amp;quot;&amp;gt;{{cite news |last1=Chakraborti |first1=Suman |title=West Bengal plans six-lane bridge over Hooghly |url=https://timesofindia.indiatimes.com/city/kolkata/west-bengal-plans-six-lane-bridge-over-hooghly/articleshow/46362895.cms |access-date=30 January 2024 |work=The Times of India |date=25 February 2015 |location=Kolkata}}&amp;lt;/ref&amp;gt; The bridge was planned as part of the 21 km long road project connecting Delhi Road and [[National Highway 12 (India)|National Highway 12]].&amp;lt;ref&amp;gt;{{cite web |title=L&amp;amp;T Construction bags orders worth Rs 1,521 cr |url=https://www.projectstoday.com/News/LT-Construction-bags-orders-worth-Rs-1521-cr |website=www.projectstoday.com |access-date=30 January 2024}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A competition was held for preparation of Detailed Project Report (DPR) for the bridge, where the engineering merits of the proposals were examined by [[Rail India Technical and Economic Service]]. Denmark&amp;#039;s [[COWI A/S|COWI]] agency was selected to prepare the Detailed Project Report (DPR). [[IIT Kharagpur]], [[IIT Madras]] and [[IIT Kanpur]] were appointed as consultants for the bridge. Seismic aspects were seriously considered in approving the design.&amp;lt;ref name=&amp;quot;Eisamay2&amp;quot;&amp;gt;{{cite news |title=মগরায় রাজ্যের দীর্ঘতম সেতু, দায়িত্বে নিগম |url=https://eisamay.com/west-bengal-news/kolkata-news/west-bengal-will-built-longest-bridge-of-the-state-at-magra/articleshow/50287965.cms |access-date=30 January 2024 |work=Eisamay |date=23 December 2015 |language=bn |archive-date=30 January 2024 |archive-url=https://web.archive.org/web/20240130190205/https://eisamay.com/west-bengal-news/kolkata-news/west-bengal-will-built-longest-bridge-of-the-state-at-magra/articleshow/50287965.cms |url-status=dead }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
=== Construction ===&lt;br /&gt;
A ceremony to mark the construction works was held in 2018.&amp;lt;ref name=&amp;quot;millenniumpost&amp;quot;&amp;gt;{{cite web |title=Now, travel to Kalyani-Dankuni in 30 minutes |url=https://www.millenniumpost.in/kolkata/now-travel-to-kalyani-dankuni-in-30-minutes-268853 |publisher=www.millenniumpost.in |access-date=30 January 2024 |language=en |date=30 October 2024}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Description ==&lt;br /&gt;
=== Architectural features ===&lt;br /&gt;
The second Ishwar Gupta Bridge is an [[Extradosed bridge|extadosed]] [[Cable-stayed bridge|cable-stayed]] bridge. 6 concrete-built pylons hold the cables. The bridge consists of a steel-framed concrete deck including two carriageways, with a total length of 714 meters (2,343 ft). The total width of the two deck [[Carriageway|carriageways]] is 35 meters (115 ft).&amp;lt;ref name=&amp;quot;NFN-Network&amp;quot;&amp;gt;{{cite web |title=New Ishwar Gupta Bridge To Add Beauty To 21Km Long Mogra-Barojaguli Flyover |url=https://newsfromnadia.in/new-ishwar-gupta-bridge-to-add-beauty-to-21km-long-mogra-barojaguli-flyover/#google_vignette |publisher=NFN Network |access-date=30 January 2024 |date=15 January 2019}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Bridges in West Bengal]]&lt;br /&gt;
[[Category:Cable-stayed bridges in India]]&lt;/div&gt;</summary>
		<author><name>ShielaPaxton36</name></author>
	</entry>
</feed>