<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Rishikesh%E2%80%93Karnaprayag_line</id>
	<title>Rishikesh–Karnaprayag line - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Rishikesh%E2%80%93Karnaprayag_line"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Rishikesh%E2%80%93Karnaprayag_line&amp;action=history"/>
	<updated>2026-11-05T07:39:22Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Rishikesh%E2%80%93Karnaprayag_line&amp;diff=530566&amp;oldid=prev</id>
		<title>SherleneGirardi: added new stub - done</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Rishikesh%E2%80%93Karnaprayag_line&amp;diff=530566&amp;oldid=prev"/>
		<updated>2026-02-05T19:29:37Z</updated>

		<summary type="html">&lt;p&gt;added new stub - done&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|Railway under construction in India}}&lt;br /&gt;
{{Use dmy dates|date=August 2017}}&lt;br /&gt;
{{Use Indian English|date=August 2017}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| box_width                       = &lt;br /&gt;
| name                            = Rishikesh–Karnaprayag line&lt;br /&gt;
| color                           = &lt;br /&gt;
| logo                            = &lt;br /&gt;
| logo_width                      = &lt;br /&gt;
| logo_alt                        = &lt;br /&gt;
| image                           = &lt;br /&gt;
| image_width                     = &lt;br /&gt;
| image_alt                       = &lt;br /&gt;
| caption                         = &lt;br /&gt;
| type                            = &lt;br /&gt;
| system                          = Broad gauge&lt;br /&gt;
| status                          = Under construction&lt;br /&gt;
| locale                          = [[Uttarakhand]]&lt;br /&gt;
| start                           = {{stnlnk|Yog Nagari Rishikesh}}&lt;br /&gt;
| end                             = [[Karnaprayag]]&lt;br /&gt;
| stations                        = 12&lt;br /&gt;
| routes                          = Single track&lt;br /&gt;
| ridership2                      = &lt;br /&gt;
| open                            = &lt;br /&gt;
| close                           = &lt;br /&gt;
| owner                           = [[Rail Vikas Nigam]]&lt;br /&gt;
| operator                        = [[Indian Railways]]&lt;br /&gt;
| character                       = &lt;br /&gt;
| depot                           = &lt;br /&gt;
| stock                           = &lt;br /&gt;
| linelength_km                   = 126&lt;br /&gt;
| tracklength_km                  = 126&lt;br /&gt;
| gauge                           = {{track gauge|1676mm}}&lt;br /&gt;
| minradius_m                     = 440&lt;br /&gt;
| racksystem                      = &lt;br /&gt;
| routenumber                     = &lt;br /&gt;
| linenumber                      = &lt;br /&gt;
| electrification                 = 25 kV 50 Hz AC OHE&lt;br /&gt;
| speed_km/h                      = 100&lt;br /&gt;
| elevation_m                     = 1451&lt;br /&gt;
| website                         = http://www.indianrailways.gov.in&lt;br /&gt;
| map                             = {{Rishikesh–Karnaprayag line}}&lt;br /&gt;
| map_state                       = collapsed&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Rishikesh–Karnaprayag line&amp;#039;&amp;#039;&amp;#039; is a 126 km long under-construction [[railway line]], connecting [[Yog Nagari Rishikesh railway station]] in [[Rishikesh]] city in the Himalayan foothills [[Sivalik Hills]] to [[Karnaprayag]] city in the [[Garhwal region]] in [[Lower Himalayan Range]] of [[Uttarakhand]] state of India. It is the main feeder route to [[Indian Railways]]&amp;#039; [[Char Dham Railway]] project which aims to connect the [[Char Dham]] pilgrimage shrines of [[Yamunotri]], [[Gangotri]], [[Badrinath]] and [[Kedarnath]]. As part of an [[Future of rail transport in India#Geo|Indian geostrategic initiative]] to build infrastructure along the [[Line of Actual Control|India-China border]] to discourage Chinese expansion, this rail line is of national strategic importance,&amp;lt;ref name=&amp;quot;char1&amp;quot;&amp;gt;{{Cite news|url=http://www.india.com/business/chardham-to-get-rail-connectivity-indian-railways-pilgrimage-linking-project-to-cost-rs-43-29-crore-2124237/|title=Chardham to get rail connectivity; Indian Railways pilgrimage linking project to cost Rs 43.29 crore|last=Dangwal|first=Sandhya|date=2017-05-12|work=India.com|access-date=2017-05-30|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;char2&amp;quot;&amp;gt;{{Cite news|url=http://timesofindia.indiatimes.com/city/dehradun/railway-minister-lays-foundation-stone-for-final-location-survey-on-char-dham-route/articleshow/58659661.cms|title=Railway minister lays foundation stone for final location survey on char dham route|work=The Times of India|access-date=2017-05-30}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=finet1/&amp;gt; which will cut down the travel time to 2 and half hours by railway from earlier 8 hours taken by the road.&amp;lt;ref name=railstath1&amp;gt;[https://www.msn.com/hi-in/news/other/uttarakhand-%E0%A4%89%E0%A4%A4%E0%A5%8D%E0%A4%A4%E0%A4%B0-%E0%A4%96%E0%A4%82%E0%A4%A1-%E0%A4%AE%E0%A5%87%E0%A4%82-%E0%A4%AA%E0%A4%B9-%E0%A4%A1%E0%A4%BC-%E0%A4%82-%E0%A4%95-%E0%A4%9A-%E0%A4%B0%E0%A4%95%E0%A4%B0-%E0%A4%AC%E0%A4%A8-%E0%A4%B0%E0%A4%B9-%E0%A4%B0%E0%A5%87%E0%A4%B2-%E0%A4%AE-%E0%A4%B0%E0%A5%8D%E0%A4%97-125-%E0%A4%95-%E0%A4%B2-%E0%A4%AE-%E0%A4%9F%E0%A4%B0-%E0%A4%B2%E0%A4%82%E0%A4%AC-%E0%A4%B0%E0%A5%82%E0%A4%9F-17-%E0%A4%B8%E0%A5%81%E0%A4%B0%E0%A4%82%E0%A4%97-%E0%A4%82-%E0%A4%B8%E0%A5%87-%E0%A4%B9-%E0%A4%95%E0%A4%B0-%E0%A4%97%E0%A5%81%E0%A4%9C%E0%A4%B0%E0%A5%87%E0%A4%97/vi-AA1BP0kf?ocid=msedgntp&amp;amp;pc=U531&amp;amp;cvid=47cc52cd1fbc44979db595b4e6be0015&amp;amp;ei=43 Uttarakhand: उत्तराखंड में पहाड़ों को चीरकर बन रहा रेल मार्ग, 125 किलोमीटर लंबा रूट 17 सुरंगों से होकर गुजरेगा], msn.com, 29 March 2025.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
[[Satpal Maharaj]] began a survey for the project as Minister of Railways of [[Uttarakhand]] in 1996.&amp;lt;ref&amp;gt;{{cite web|url=http://www.irfca.org/docs/railway-ministers.html|title=Railway Ministers|access-date=6 April 2016|publisher=IRFCA}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;rkrail&amp;quot;&amp;gt;{{cite web|url=http://www.merapahadforum.com/development-issues-of-uttarakhand/proposal-for-train-till-bageshwar/msg86385/?PHPSESSID=31af99fdc9162b6cc76754ced97d0484#msg86385|title=Several Rail Projects Yet To Take Off in State}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news|url=http://www.tribuneindia.com/2011/20111102/dun.htm#7|title=Rishikesh Karnprayag Project|newspaper=[[The Tribune (Chandigarh)|Tribune India]]|access-date=6 April 2016}}&amp;lt;/ref&amp;gt; &lt;br /&gt;
&lt;br /&gt;
The project&amp;#039;s [[Cornerstone|foundation stone]] was scheduled to be laid by [[United Progressive Alliance]] chairperson [[Sonia Gandhi]] on 9 November 2011. &amp;lt;ref&amp;gt;{{cite journal|url=http://www.merinews.com/article/work-on-rishikesh-karnaprayag-rail-line-to-commence-soon-satpal-maharaj/15860540.shtml|title=Work on Rishikesh-Karnaprayag rail line to commence soon: Satpal Maharaj|access-date=6 April 2016|publisher=meri news}}&amp;lt;/ref&amp;gt; Alignment of the 126-kilometer-long railway project was completed in 2013,&amp;lt;ref&amp;gt;{{cite journal|url=http://zeenews.india.com/news/uttarakhand/alignment-plan-finalised-for-rishikesh-karnaprayag-railway-line_876403.html|title=Alignment plan finalized for Rishikesh-Karnaprayag railway line|date=14 September 2013 |publisher=[[Zee News]]|access-date=6 April 2016}}&amp;lt;/ref&amp;gt; but the project was delayed by political wrangling.&amp;lt;ref&amp;gt;{{cite journal|url=http://www.business-standard.com/article/economy-policy/rail-project-caught-in-unsavory-political-controversy-114031400695_1.html|title=Rail project caught in unsavory political controversy|newspaper=Business Standard India |date=14 March 2014 |publisher=business-standard|access-date=6 April 2016|last1=Prashant |first1=Shishir }}&amp;lt;/ref&amp;gt; &lt;br /&gt;
&lt;br /&gt;
The detailed feasibility work finally began in 2015 under the leadership of [[Narendra Modi]] led [[National Democratic Alliance]] government. Design contracts for tunnel and bridge construction were awarded in 2019. Italferr, the engineering arm of [[Ferrovie dello Stato Italiane|FS Italiane Group]], received the contract for the design and supervision of the 12-km-long section (running almost entirely through tunnels) of the Himalaya Tunnel as part of a joint venture with Swiss firm [[Lombardi Engineering|Lombardi SA]].&amp;lt;ref&amp;gt;{{Cite web|url=https://www.italferr.it/content/italferr/en/media/sala-stampa/2019/2/6/italferr-is-awarded-a-new-contract-in-india.html|title=Italferr is awarded a new contract in India|website=www.italferr.it|access-date=2019-12-15}}&amp;lt;/ref&amp;gt; That construction began in 2018. Work on the first [[Absolute block signalling|block section]], from the Virbhadra railway station to {{stnlnk|Yog Nagari Rishikesh}}, began in June 2018 and was completed in 2020.&lt;br /&gt;
&lt;br /&gt;
== Strategic importance==&lt;br /&gt;
{{anchor | Strategic | Significance | Importance }}&lt;br /&gt;
&lt;br /&gt;
It will play a vital role in national security and the welfare of Uttarakhand,&amp;lt;ref name=fea1&amp;gt;{{cite news|url=http://www.hindustantimes.com/dehradun/coming-soon-india-s-longest-railway-tunnel-on-rishikesh-karnprayag-route/story-wS8XHEfypDEXqdmkby3aAN.html|title=Coming soon: India&amp;#039;s longest railway tunnel on Rishikesh-Karnprayag route|newspaper=[[Hindustan Times]]|access-date=21 September 2016}}&amp;lt;/ref&amp;gt; by reducing travel time between Rishikesh and Karnaprayag from 6-7 hours to {{frac|2|1|2}} hours.&amp;lt;ref name=char3/&amp;gt; The line will serve pilgrims and local residents, and will be able to rapidly move troops to the [[Line of Actual Control|India-China border]].&amp;lt;ref&amp;gt;{{cite news|url=http://www.tribuneindia.com/news/uttarakhand/rishikesh-karanprayag-rail-line-priority-project-mp/205103.html|title=Rishikesh-Karanprayag rail line priority project: MP|newspaper=[[The Tribune (Chandigarh)|Tribune India]]|access-date=6 April 2016}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Project features==&lt;br /&gt;
{{anchor|Rail Line Project | Project | Features }}&lt;br /&gt;
&lt;br /&gt;
This {{INRConvert|16200|c}} project, with 35 bridges, and 105&amp;amp;nbsp;km (85 percent) will run through 17 tunnels including 15.1-km [[Devprayag]]-Lachmoli tunnel which was reportedly India&amp;#039;s longest tunnel in 2016.&amp;lt;ref name=char3/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Route==&lt;br /&gt;
{{anchor|Railway routes | Route }}&lt;br /&gt;
&lt;br /&gt;
The Rishikesh–Karnaprayag line, which begins at {{stnlnk|Yog Nagari Rishikesh}} station (385 m ) and ends at [[Karnaprayag]] station (825 m ) city,&amp;lt;ref name=&amp;quot;char3&amp;quot;/&amp;gt; will have the following 12 stations (sequentially listed southwest to northwest direction) all of which are in Uttarakhand state.&lt;br /&gt;
&lt;br /&gt;
* [[Dehradun district]]&lt;br /&gt;
** {{stnlnk|Yog Nagari Rishikesh}} in [[Rishikesh]]: since the railway line could not be extended from the [[Rishikesh railway station]] (RKSH) in the city through densely populated areas, a rail line was built from the [[Virbhadra]] station to the new [[Yog Nagari Rishikesh railway station]] (YNRK).&amp;lt;ref name=&amp;quot;char3&amp;quot;&amp;gt;{{Cite news|url=http://www.hindustantimes.com/dehradun/coming-soon-india-s-longest-railway-tunnel-on-rishikesh-karnprayag-route/story-wS8XHEfypDEXqdmkby3aAN.html|title=Coming soon: India&amp;#039;s longest railway tunnel on Rishikesh–Karnaprayag route|date=2016-09-19|work=Hindustan Times|access-date=2017-05-30|language=en}}&amp;lt;/ref&amp;gt; &lt;br /&gt;
&lt;br /&gt;
* [[Tehri Garhwal district]]&lt;br /&gt;
** Muni Ki Reti&lt;br /&gt;
&lt;br /&gt;
* [[Pauri Garhwal district]]&lt;br /&gt;
** Shivpuri&lt;br /&gt;
&lt;br /&gt;
* Tehri Garhwal district&lt;br /&gt;
** Manjilgaon&lt;br /&gt;
** Sakni&lt;br /&gt;
** Devprayag&lt;br /&gt;
** Kirtinagar&lt;br /&gt;
&lt;br /&gt;
* Pauri Garhwal district&lt;br /&gt;
** Srinagar&lt;br /&gt;
** Dungripanth (Dhari devi) &lt;br /&gt;
&lt;br /&gt;
* [[Rudraprayag district]]&lt;br /&gt;
** Dhari &lt;br /&gt;
** Gholtir &lt;br /&gt;
* [[Chamoli district]]&lt;br /&gt;
** Karnaprayag&lt;br /&gt;
&lt;br /&gt;
==Related connectivity==&lt;br /&gt;
&lt;br /&gt;
* [[Char Dham Railway]]: Rishikesh–Karnaprayag line is a feeder line to the Char Dham Railway, the later has the following 4 sub-sections:&lt;br /&gt;
** [[Doiwala–Dehradun–Uttarkashi–Maneri Gangotri Railway]]&lt;br /&gt;
*** [[Uttarkashi–Palar Yamunotri Railway]], midway fork from the Gangotri Railway&lt;br /&gt;
** [[Karnaprayag–Saikot–Sonprayag Kedarnath Railway]]&lt;br /&gt;
*** [[Saikot–Joshimath Badrinath Railway]], midway fork from the Kedarnath Railway&lt;br /&gt;
&lt;br /&gt;
* [[Char Dham Highway]]: will complement the Rishikesh–Karnaprayag line mostly along the same route&lt;br /&gt;
&lt;br /&gt;
* [[Parvatmala]], ropeway project across India, including ropeways in some of the destinations of the  Rishikesh–Karnaprayag line&lt;br /&gt;
&lt;br /&gt;
==Status==&lt;br /&gt;
{{anchor|Current status | Current }}&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2024 Nov&amp;#039;&amp;#039;&amp;#039;: 60% of the project&amp;#039;s budget has been utilised with 70% work completed, with 28 of the 38 planned tunnel breakthroughs completed, and the remaining 10 are scheduled for breakthroughs by March 2025, 11 stations were under-construction.&amp;lt;ref name=conup1&amp;gt;[https://www.financialexpress.com/business/railways-rishikesh-karnaprayag-rail-line-likely-to-operate-by-2026-end-officials-say-60-of-its-budget-utilised-so-far-3674132/ Rishikesh-Karnaprayag rail line likely to operate by 2026 end, officials say 60% of its budget utilised so far], Financial Express, 19 November 2024.&amp;lt;/ref&amp;gt;&amp;lt;ref name=finet1&amp;gt;[https://www.financialexpress.com/business/railways-indian-railways-rishikesh-karnaprayag-bg-rail-project-11-stations-under-construction-176-km-of-tunnel-work-completed-3615763/ Indian Railways’ Rishikesh-Karnaprayag BG rail line project: 11 stations under construction, 176 km of tunnel work completed], Financial Express, 19 Sept 2024.&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;2024update&amp;quot;&amp;gt;{{cite web | url=https://infra.economictimes.indiatimes.com/news/railways/70-work-on-laying-rishikesh-karnaprayag-rail-line-completed-official/108329082 | title=70% work on laying Rishikesh-Karnaprayag rail line completed: Official - ET Infra }}&amp;lt;/ref&amp;gt;  &lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2025 Nov&amp;#039;&amp;#039;&amp;#039;: 201 km tunneling work out of 213 completed. The earlier project completion date of December 2026 has been revised to more realistic completion date of December 2028.&amp;lt;ref name=compu1&amp;gt;[https://www.thedailyjagran.com/uttarakhand/rishikesh-karnaprayag-railway-line-project-to-be-completed-by-dec-2028-confirm-officials-40045263 Rishikesh-Karnaprayag Railway Line: Project To Be Completed By Dec 2028, Confirm Officials], Daily Jagran, accessed 27 Nov 2025.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
* &amp;#039;&amp;#039;&amp;#039;2025 Dec&amp;#039;&amp;#039;&amp;#039;:76 % physical work completed with 69% budget spent (Rs 26,841 crore out of the total estimated Rs 38,953 crore project cost).&amp;lt;ref&amp;gt;[https://ipm.mospi.gov.in/Home/ViewPdf/26?path=FlashReport_December_2025.pdf GoI MSPI Report], MSPI, Dec 2025.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==See also==&lt;br /&gt;
* [[Diamond Quadrilateral]] (railway project)&lt;br /&gt;
* [[Golden Quadrilateral]] (road project)&lt;br /&gt;
* [[Setu Bharatam]] (project to eliminate at-grade crossings)&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
{{Transport in India}}&lt;br /&gt;
&lt;br /&gt;
{{Railways in Northern India}}&lt;br /&gt;
&lt;br /&gt;
{{DEFAULTSORT:Rishikesh - Karnaprayag Railway}}&lt;br /&gt;
[[Category:Northern Railway zone|*]]&lt;br /&gt;
[[Category:Proposed railway lines in India]]&lt;br /&gt;
[[Category:Proposed infrastructure in Uttarakhand]]&lt;br /&gt;
[[Category:Rail transport in Uttarakhand]]&lt;br /&gt;
[[Category:Transport in Rishikesh]]&lt;/div&gt;</summary>
		<author><name>SherleneGirardi</name></author>
	</entry>
</feed>