<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Purple_Line_%28Kolkata_Metro%29</id>
	<title>Purple Line (Kolkata Metro) - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Purple_Line_%28Kolkata_Metro%29"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Purple_Line_(Kolkata_Metro)&amp;action=history"/>
	<updated>2026-11-24T14:13:13Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Purple_Line_(Kolkata_Metro)&amp;diff=527402&amp;oldid=prev</id>
		<title>Coolblack5 at 12:43, 29 April 2026</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Purple_Line_(Kolkata_Metro)&amp;diff=527402&amp;oldid=prev"/>
		<updated>2026-04-29T12:43:22Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{short description|Transit line in India}}&lt;br /&gt;
{{Redirect|Kolkata Metro Line 3|other uses|Line 3 (disambiguation){{!}}Line 3}}&lt;br /&gt;
{{Use dmy dates|date=March 2017}}&lt;br /&gt;
{{Use Indian English|date=March 2017}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| name = &amp;lt;big&amp;gt; Purple Line &amp;lt;/big&amp;gt;&lt;br /&gt;
| color = {{rail color|Kolkata Metro|Purple}}&lt;br /&gt;
| image = ICF MEDHA 417.jpg&lt;br /&gt;
| image_width = 350px&lt;br /&gt;
| image_alt = &lt;br /&gt;
| caption = &lt;br /&gt;
| type = [[Rapid transit]]&lt;br /&gt;
| system = [[Kolkata Metro]]&lt;br /&gt;
| status = Operational&lt;br /&gt;
| locale = [[Kolkata Metropolitan Region]]&lt;br /&gt;
| start = {{stl|Kolkata Metro|Majerhat}} (North)&lt;br /&gt;
| end = {{stl|Kolkata Metro|Joka}} (South)&lt;br /&gt;
| connectinglines = Future: {{Plainlist|&lt;br /&gt;
* {{rint|Kolkata|Blue}}&lt;br /&gt;
* {{rint|Kolkata|Green}}&lt;br /&gt;
}}&lt;br /&gt;
| stations = {{Plainlist| &lt;br /&gt;
*Operational: 7&lt;br /&gt;
*Under construction: 5&lt;br /&gt;
*Approved: 3&lt;br /&gt;
}}&lt;br /&gt;
| routes = &lt;br /&gt;
| daily_ridership = {{Plainlist|&lt;br /&gt;
*8500–9000 [Weekdays]&lt;br /&gt;
*3500–4000 [Weekends]&lt;br /&gt;
}}&lt;br /&gt;
| linenumber = 3&lt;br /&gt;
| open = {{Start date and age|2022|12|30|df=yes}}&lt;br /&gt;
| lastextension = {{Start date and age|2024|03|06|df=yes}}&lt;br /&gt;
| owner = [[Indian Railways]]&lt;br /&gt;
| operator = [[Metro Railway, Kolkata]]&lt;br /&gt;
| character = [[Elevated railway|elevated]]&lt;br /&gt;
| depot = [[List of Kolkata Metro depots and yards|Joka Metro Depot]]&lt;br /&gt;
| stock = [[Integral Coach Factory|ICF]] MEDHA 414,417,418,802,803,804&lt;br /&gt;
| linelength = {{convert|27.55|km|mi|abbr=on}}&amp;lt;ref&amp;gt;{{cite news|title=Kolkata Metro Map|url=https://mtp.indianrailways.gov.in/view_section.jsp?lang=0&amp;amp;id=0,1,285}}&amp;lt;/ref&amp;gt;{{bulleted list| Operational: {{convert|7.75|km|mi|abbr=on}}| Under construction: {{convert|6.5|km|mi|abbr=on}}| Approved: {{convert|4.8|km|mi|abbr=on}}| Planned: {{convert|8.5|km|mi|abbr=on}}}}&lt;br /&gt;
| tracklength = &lt;br /&gt;
| tracks = 2&lt;br /&gt;
| gauge = {{Track gauge|5ft6in|lk=on}} [[broad gauge]]&lt;br /&gt;
| electrification = 750 [[Volt|V]] [[Direct current|DC]] using [[third rail]]&amp;lt;ref name=&amp;quot;railway-gazette&amp;quot; /&amp;gt;&lt;br /&gt;
| speed = {{cvt|80|km/h}} (designed) {{cvt|60-70|km/h}} (commercial)&lt;br /&gt;
| signalling = [[Communication-based train control|CBTC ATP signalling system]]&lt;br /&gt;
| website = {{URL|https://mtp.indianrailways.gov.in|Indian Railways}}&lt;br /&gt;
| elevation = &lt;br /&gt;
| map = [[File:Kolkata Metro Purple Line Route Map.png|300px]]{{Kolkata Metro Purple Line}}&lt;br /&gt;
| map_name = Route Map&lt;br /&gt;
| map_state = collapsed&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Purple Line&amp;#039;&amp;#039;&amp;#039; is a [[rapid transit]] metro line of the [[Kolkata Metro]] in [[Kolkata]], [[West Bengal]], [[India]]. A {{convert|7.75|km|mi}} stretch from [[Joka, Kolkata|Joka]] to [[Majerhat metro station|Majerhat]] of this line is operational as of 2025.&amp;lt;ref&amp;gt;{{Cite web |date=2022-12-30 |title=Kolkata Metro: First glimpse of Joka-Taratala route in pics |url=https://www.livemint.com/news/india/kolkata-metro-first-glimpse-of-joka-taratala-route-in-pics-11672372907422.html |access-date=2022-12-30 |website=mint |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;timesofindia.indiatimes.com&amp;quot;&amp;gt;{{Cite web|url=https://timesofindia.indiatimes.com/city/kolkata/work-on-fast-track-as-metro-eyes-new-links-in-next-2-yrs/articleshow/69717307.cms|title=Kolkata: Work on fast track as East-West Metro eyes new links in next two years {{!}} Kolkata News - Times of India|last=Bandyopadhyay|first=Krishnendu|website=The Times of India|language=en|access-date=2019-06-28|date=June 10, 2019|first2=Ajanta |last2=Chakraborty}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;TH&amp;quot;&amp;gt;{{cite news|title=PM Modi unveils multiple metro projects, including Kolkata underwater corridor|url=https://www.thehindu.com/news/national/pm-modi-unveils-multiple-metro-projects-including-kolkata-underwater-corridor/article67919706.ece|work=The Hindu|date=6 March 2024|access-date=6 March 2024|language=en}}&amp;lt;/ref&amp;gt; This line is planned to span {{convert|26.88|km|mi}} from [[IIM Calcutta|IIM-Joka]] in the southern region of [[Kolkata metropolitan region|Greater Kolkata]] to [[Eden Gardens]] in the [[Geography of Kolkata#Central Kolkata|Central Kolkata]].&amp;lt;ref&amp;gt;{{cite news|url=https://metrorailblog.blogspot.com/2017/07/rvnl-calls-up-tenders-for-joka-depot-of.html?m=1|title=Kolkata Metro Line 3}}&amp;lt;/ref&amp;gt; It will have interchanges with [[Blue Line (Kolkata Metro)|Blue Line]] at [[Park Street metro station (Kolkata)|Park Street]] and [[Esplanade metro station|Esplanade]] and with [[Green Line (Kolkata Metro)|Green Line]] at [[Esplanade metro station|Esplanade]].&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
&lt;br /&gt;
Previously, the stretch from [[Thakurpukur]] to [[Majerhat railway station|Majerhat]] was surveyed as a branch line of the [[Kolkata Circular Railway|circular railway]], and a metro line from [[Majerhat metro station|Majerhat]] to [[Dakshineswar metro station|Dakshineswar]] via [[Sealdah metro station|Sealdah]] (interchange with [[Green Line (Kolkata Metro)|Green Line]]) was planned.&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt; This plan was scrapped and a new metro line from further south in Joka to BBD Bagh was sanctioned in 2010–2011 with a total length of {{convert|17.22|km|mi|abbr=on}} at an anticipated cost of {{INRConvert|2619.02|c|lk=on|year=2010}}. Later the route was truncated to Esplanade. The corridor runs along Diamond Harbour Road, Khidirpur Road, and Jawaharlal Nehru Road, major arterial roads of Kolkata, and has passenger interchange facilities with the Blue Line and Green line at Esplanade and Blue line at Park street. The proposed Esplanade station will not be the same as that of the Blue Line and Green Line but a different station that will be built at B.C. Roy market ground. The line now has a new depot in [[Joka depot|Joka]]. Due to land acquisition problems&amp;lt;ref name=&amp;quot;:0&amp;quot;&amp;gt;{{cite web|title=Inability to procure land for depot leaves RVNL unsure of Joka-BBD Bag Metro&amp;#039;s 1st phase commencement|url=http://www.millenniumpost.in/kolkata/inability-to-procure-land-for-depot-leaves-rvnl-unsure-of-joka-bbd-bag-metros-1st-phase-commencement-398145|last=NANDI|first=SOUMITRA|date=30 January 2020|website=www.millenniumpost.in|language=en|access-date=17 May 2020|archive-date=31 January 2020|archive-url=https://web.archive.org/web/20200131034620/http://www.millenniumpost.in/kolkata/inability-to-procure-land-for-depot-leaves-rvnl-unsure-of-joka-bbd-bag-metros-1st-phase-commencement-398145|url-status=live}}&amp;lt;/ref&amp;gt; and objections from the [[Ministry of Defence (India)|Ministry of Defence]], construction has been delayed several times since the beginning.&amp;lt;ref&amp;gt;{{cite web|title=580 crore sanctions to build Joka-BBD Bagh Metro depot – Rail Analysis India|url=http://railanalysis.in/rail-news/580-crore-sanctions-build-joka-bbd-bagh-metro-depot/|date=18 June 2019|archive-url=https://web.archive.org/web/20190618033514/http://railanalysis.in/rail-news/580-crore-sanctions-build-joka-bbd-bagh-metro-depot/|access-date=17 May 2020|archive-date=18 June 2019 |url-status=dead}}&amp;lt;/ref&amp;gt; Defence Ministry objected that the elevated corridor would overlook the [[Eastern Command (India)|Eastern Command headquarters]] at [[Fort William, India|Fort William]], Ordinance Depot at Mominpore. The change in alignment from elevated to underground increased the construction cost of the stretch from {{INRConvert|139|c|lk=|year=2020}} to {{INRConvert|3000|c|lk=on|year=2020}}.&amp;lt;ref name=&amp;quot;:22&amp;quot;&amp;gt;{{cite web|last=Bandyopadhyay|first=Krishnendu|date=30 Jul 2020|title=Kolkata: Defence nod makes journey of Joka Metro project easier|url=https://timesofindia.indiatimes.com/city/kolkata/defence-nod-makes-journey-of-joka-metro-project-easier/articleshow/77249361.cms|access-date=2021-04-13|website=The Times of India|language=en|archive-date=13 April 2021|archive-url=https://web.archive.org/web/20210413194158/https://timesofindia.indiatimes.com/city/kolkata/defence-nod-makes-journey-of-joka-metro-project-easier/articleshow/77249361.cms|url-status=live}}&amp;lt;/ref&amp;gt; The work resumed in several phases and new bids were invited by [[Rail Vikas Nigam Limited]] (RVNL) in April 2020.&amp;lt;ref&amp;gt;{{cite web|last=B|first=Krishnendu|date=1 March 2019|title=Work begins at Joka Metro depot, wall built|url=https://timesofindia.indiatimes.com/city/kolkata/work-begins-at-joka-metro-depot-wall-built/articleshow/68208956.cms|url-status=live|archive-url=https://web.archive.org/web/20200822120856/https://timesofindia.indiatimes.com/city/kolkata/work-begins-at-joka-metro-depot-wall-built/articleshow/68208956.cms|archive-date=22 August 2020|access-date=17 May 2020|website=The Times of India|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web|title=Bids invited for construction of Joka depot for Kolkata Metro Purple Line|url=https://www.urbantransportnews.com/bids-invited-for-construction-of-joka-depot-for-kolkata-metro-line-3/|last=Khare|first=Anushka|date=1 May 2020|website=Urban Transport News|language=en-US|access-date=17 May 2020|archive-date=16 May 2020|archive-url=https://web.archive.org/web/20200516100346/https://www.urbantransportnews.com/bids-invited-for-construction-of-joka-depot-for-kolkata-metro-line-3/|url-status=dead}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web|title=RVNL Invites Bids for Kolkata Metro Line-3&amp;#039;s Joka Depot|url=https://themetrorailguy.com/2020/04/28/rvnl-invites-bids-for-kolkata-metro-line-3s-joka-depot/|date=28 April 2020|website=The Metro Rail Guy|language=en-US|access-date=17 May 2020|archive-date=22 August 2020|archive-url=https://web.archive.org/web/20200822120858/https://themetrorailguy.com/2020/04/28/rvnl-invites-bids-for-kolkata-metro-line-3s-joka-depot/|url-status=live}}&amp;lt;/ref&amp;gt; It is India&amp;#039;s first metro line to run on indigenous head hardened rails, manufactured by [[Jindal Steel and Power|Jindal Steel &amp;amp; Power]].&amp;lt;ref&amp;gt;{{cite web|last=Bandyopadhyay|first=Krishnendu|date=12 August 2020|title=Kolkata: Joka-Esplanade to be India&amp;#039;s first Metro to run on indigenous rails|url=https://timesofindia.indiatimes.com/city/kolkata/joka-esplanade-to-be-indias-first-metro-to-run-on-indigenous-rails/articleshow/77493124.cms|url-status=live|archive-url=https://web.archive.org/web/20200812230910/https://timesofindia.indiatimes.com/city/kolkata/joka-esplanade-to-be-indias-first-metro-to-run-on-indigenous-rails/articleshow/77493124.cms|archive-date=12 August 2020|access-date=12 August 2020|website=The Times of India|language=en}}&amp;lt;/ref&amp;gt; The extension of this line to IIM and Diamond Park for {{convert|2|km|mi|abbr=on}} was sanctioned in the 2012–2013 Budget at a cost of {{INRConvert|294.49|c|lk=on|year=2012}}. The work is being executed by RVNL.&amp;lt;ref name=&amp;quot;Joka-Esplanade Metro on the anvil&amp;quot;&amp;gt;{{cite news|last=Chakraborty|first=Monotosh|date=10 July 2010|title=Joka-Eplanade Metro on the anvil|work=The Times of India|url=https://timesofindia.indiatimes.com/city/kolkata/Joka-BBD-Bag-Metro-on-the-anvil/articleshow/6149695.cms|url-status=live|archive-date=2 October 2016|archive-url=https://web.archive.org/web/20161002181411/http://timesofindia.indiatimes.com/city/kolkata/Joka-BBD-Bag-Metro-on-the-anvil/articleshow/6149695.cms}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The [[Mominpur metro station]] was planned to be built across a 2500 sq. m area. However, the Ministry of Defence objected to the elevated structure, saying that it would overlook the Ordnance depot. This forced RVNL to stall the entire project, and RVNL almost dropped the station from the plan even though it alone would have a projected 20,000 passengers during peak hours. Underground Mominpur station was also not possible due to the sharp gradient from [[Taratala metro station]].&amp;lt;ref name=&amp;quot;:23&amp;quot; /&amp;gt; After a series of discussions and consultations with the Ministry of Defence and Government of West Bengal in 2016, it was decided to shift the station around {{convert|1|km|mi|abbr=on}} northward, near the Alipore Bodyguard Lines.&amp;lt;ref name=&amp;quot;:24&amp;quot;&amp;gt;{{cite web|last=Byandhopadhyay|first=Krishnendu|date=17 April 2016|title=Kolkata&amp;#039;s Mominpore station jinx broken, Joka-BBD Bag Metro rises again|url=https://timesofindia.indiatimes.com/city/kolkata/Kolkatas-Mominpore-station-jinx-broken-Joka-BBD-Bag-Metro-rises-again/articleshow/51861284.cms|url-status=live|archive-url=https://web.archive.org/web/20170131020447/http://timesofindia.indiatimes.com/city/kolkata/Kolkatas-Mominpore-station-jinx-broken-Joka-BBD-Bag-Metro-rises-again/articleshow/51861284.cms|archive-date=31 January 2017|access-date=18 May 2020|website=The Times of India|language=en}}&amp;lt;/ref&amp;gt; But, after a year Defence Ministry approved the Mominpur metro station in its original location as the change in alignment would have delayed the project and budget overrun. It will be the last elevated station of the corridor.&amp;lt;ref name=&amp;quot;:23&amp;quot;&amp;gt;{{cite web|last=Jayanta Gupta|date=18 February 2017|title=Defence ministry clears decks for Mominpore metro station|url=https://timesofindia.indiatimes.com/city/kolkata/defence-ministry-clears-decks-for-mominpore-metro-station/articleshow/57212658.cms|url-status=live|archive-url=https://web.archive.org/web/20170220190231/http://timesofindia.indiatimes.com/city/kolkata/defence-ministry-clears-decks-for-mominpore-metro-station/articleshow/57212658.cms|archive-date=20 February 2017|access-date=17 May 2020|website=The Times of India|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web|date=19 July 2019|title=RVNL invites bids for consultancy services for Kolkata Metro extension|url=https://www.urbantransportnews.com/rvnl-invites-bids-for-consultancy-services-for-kolkata-metro-extension-project/|archive-url=https://web.archive.org/web/20190722134745/https://urbantransportnews.com/rvnl-invites-bids-for-consultancy-services-for-kolkata-metro-extension-project/|archive-date=22 July 2019|access-date=18 May 2020|website=Urban Transport News|language=en-US|url-status=dead}}&amp;lt;/ref&amp;gt; Now, the proposed underground Khidirpur metro station is planned at the Alipore Bodyguard Lines.&amp;lt;ref&amp;gt;{{cite web|last=Chakraborty|first=Ajanta|date=14 Dec 2020|title=Kolkata: Joka Metro skirts school bottleneck with route tweak|url=https://timesofindia.indiatimes.com/city/kolkata/joka-metro-skirts-school-bottleneck-with-route-tweak/articleshow/79710735.cms|access-date=2021-04-13|website=The Times of India|language=en|archive-date=13 April 2021|archive-url=https://web.archive.org/web/20210413194157/https://timesofindia.indiatimes.com/city/kolkata/joka-metro-skirts-school-bottleneck-with-route-tweak/articleshow/79710735.cms|url-status=live}}&amp;lt;/ref&amp;gt; There were also hurdles regarding clearance for tunneling under defence lands.&amp;lt;ref name=&amp;quot;:24&amp;quot; /&amp;gt; In 2020, the Defence Ministry eased out the process as lease rent wasn&amp;#039;t required anymore for tunneling as long the overground ownership of the land did not change.&amp;lt;ref name=&amp;quot;:22&amp;quot; /&amp;gt; On 30 December 2022 the Joka - Taratala section and on 6 March 2024, the Taratala - Majerhat section was inaugurated remotely by Prime Minister Narendra Modi, completing the 7.75&amp;amp;nbsp;km Phase 1 stretch.&lt;br /&gt;
&lt;br /&gt;
Commercial Operations between Joka and Majerhat began on 6 March 2024&lt;br /&gt;
&lt;br /&gt;
The service starts from Joka starts at 6:40 am and at Majherhat from 7:03 am and ends at Joka at 9:05 pm and at Majherhat at 9:26 pm , with 84 pairs of services from Monday to Friday. The trains run at a frequency of first 2 service from Joka and 1 service from Majerhat are 23 minutes and rest services are 21 minutes.&lt;br /&gt;
&lt;br /&gt;
In a separate development, Kolkata metro has announced that the Purple Line, running between Joka and Majerhat, will be available on Saturdays as well. The services are expected to cater to the large population employed in the IT sector. &lt;br /&gt;
&lt;br /&gt;
The services have begun on November 22, 2025. According to a press release by the Kolkata Metro Rail Corporation, a total of 40 services, 20 UP and 20 Down, will operate every Saturday at an interval of 21 minutes.&lt;br /&gt;
&lt;br /&gt;
On Saturdays, the first train will depart from Joka to Majerhat at 1:25 PM, while the first train from Majerhat will leave at 1:49 PM for Joka. The last service from Joka to Majerhat will run at 8:11 pm. The final train from Majerhat to Joka will depart at 8.32 pm. The frequency of first 2 trains from Joka are 28 minutes and first 1 train from Majerhat is 24 minutes, rest services are of 21 minutes. There are no services on Sundays.&lt;br /&gt;
&lt;br /&gt;
On 12 January 2025, it was reported that Metro authorities decided to extend the line to [[Eden Gardens]] instead of Esplanade to facilitate commuters and connect Strand Road, BBD Bag and Calcutta High Court.&amp;lt;ref&amp;gt;{{Cite news |last=Chakraborty |first=Ajanta |date=12 January 2025 |title=Kolkata metro plans to extend Joka-Esplanade Purple Line to Eden Gardens |url=https://timesofindia.indiatimes.com/city/kolkata/kolkata-metro-plans-to-extend-joka-esplanade-purple-line-to-eden-gardens/articleshow/117163620.cms |access-date=15 January 2025 |work=[[Times of India]]}}&amp;lt;/ref&amp;gt; Subsequently, in March 2025 railways sanctioned {{INRConvert|1000|c|lk=on|year=2012}} for the extension.&amp;lt;ref&amp;gt;{{Cite news |date=2025-03-11 |title=Rlys sanctions 1k cr for Eden Gardens metro stn |url=https://timesofindia.indiatimes.com/city/kolkata/rlys-sanctions-1k-cr-for-eden-gardens-metro-stn/articleshow/118901481.cms |access-date=2025-03-11 |work=The Times of India |issn=0971-8257}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
On 25 March 2025, [[The Times of India]] reported that Metro railway sent a proposal to Ministry of Railways to extend the Diamond Park Branch to Tollygunge, which will be {{cvt|8.5|km}} long.&amp;lt;ref name=&amp;quot;The Times of India&amp;quot;&amp;gt;{{Cite book |title=The Times of India |publication-date=2025-03-25 |pages=2}}&amp;lt;/ref&amp;gt; In this route three underground station at Thakurpukur Cancer Hospital, Ramchandrapur and Panchanantala will come.&amp;lt;ref name=&amp;quot;epaper.indiatimes.com&amp;quot;&amp;gt;{{Cite web |title=Times ePaper Online - Read Today’s English, Marathi News Paper Online |url=https://epaper.indiatimes.com/article-share?article=25_03_2025_002_006_toikc_TOI |access-date=2025-04-30 |website=The Economic Times}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Development==&lt;br /&gt;
[[File:The Prime Minister, Shri Narendra Modi flags off Metro train on Joka-Taratala stretch of Purple Line of Kolkata Metro via video conferencing on December 30, 2022.jpg|thumb|Prime Minister [[Narendra Modi]] inaugurates the Joka-Majerhat stretch of Purple Line of Kolkata Metro on December 30, 2022.]] &lt;br /&gt;
Around {{convert|8.5|km|mi}} of the project will be elevated and the rest of {{convert|6.32|km|mi}} of the metro line will be underground.&amp;lt;ref name=&amp;quot;timesofindia.indiatimes.com&amp;quot;/&amp;gt; The project is getting delayed due to nonavailability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.&amp;lt;ref&amp;gt;{{Cite web|url=https://timesofindia.indiatimes.com/city/kolkata/work-begins-at-joka-metro-depot-wall-built/articleshow/68208956.cms|title=Work begins at Joka Metro depot, wall built {{!}} Kolkata News - Times of India|last=Bandyopadhyay|first=Krishnendu|date=March 1, 2019|website=The Times of India|language=en|access-date=2019-06-28}}&amp;lt;/ref&amp;gt; Tenders for its construction and plant &amp;amp; machinery were invited in April 2020.&amp;lt;ref&amp;gt;{{Cite web|url=https://themetrorailguy.com/2020/04/28/rvnl-invites-bids-for-kolkata-metro-line-3s-joka-depot/|title=RVNL Invites Bids for Kolkata Metro Line-3&amp;#039;s Joka Depot|date=2020-04-28|website=The Metro Rail Guy|language=en-US|access-date=2020-04-29}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Construction was further delayed in September 2018 due to the [[2018 Kolkata bridge collapse|Majerhat Bridge collapse]], the metro was being built right next to the bridge.&lt;br /&gt;
&lt;br /&gt;
Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.&lt;br /&gt;
&lt;br /&gt;
By 15 September 2022, the stretch from Joka to Taratala has been fully constructed and electrification has been done. Testing trials are underway from Joka to Taratala using the old decommissioned Metro Rakes. Eventually in service there will be new air conditioned metro rakes. The stretch from Majerhat to Esplanade is under construction.&lt;br /&gt;
&lt;br /&gt;
[[Prime Minister of India|Prime Minister]] [[Narendra Modi]] inaugurated the Joka-Taratala stretch, including Joka metro station of Kolkata Metro&amp;#039;s Purple Line on 30 December 2022 in the presence of [[List of chief ministers of West Bengal|West Bengal Chief Minister]] [[Mamata Banerjee]] and Indian Railway Minister [[Ashwini Vaishnaw]]. Some students from schools especially [[St Thomas School, Kolkata|St Thomas Boys School]], whose premises are utilised for planned [[Khidirpur metro station]] in this stretch, were granted the rare opportunity to be the first ones to ride in this Joka-Taratala stretch after the inauguration.&amp;lt;ref name=&amp;quot;livemint&amp;quot;&amp;gt;{{cite news |title=Kolkata Metro: First glimpse of Joka-Taratala route in pics |url=https://www.livemint.com/news/india/kolkata-metro-first-glimpse-of-joka-taratala-route-in-pics-11672372907422.html |access-date=30 December 2022 |publisher=www.livemint.com |date=30 December 2022 |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |title=In-pics: Inaugration of Vande Bharat Express, Joka-Taratala Metro &amp;amp; more news from Kolkata |url=https://www.telegraphindia.com/my-kolkata/news/in-pics-inaugration-of-vande-bharat-express-joka-taratala-metro-more-news-from-kolkata-photogallery/cid/1906840 |access-date=2022-12-31 |website=www.telegraphindia.com}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |date=2020-12-18 |title=Another school demands Metro route tweak |work=The Times of India |url=https://timesofindia.indiatimes.com/city/kolkata/another-school-demands-metro-route-tweak/articleshow/79784896.cms |access-date=2023-05-02 |issn=0971-8257}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
After lot of hardships and developmental work the [[Taratala metro station|Taratala]]–[[Majerhat metro station|Majerhat]] section of Kolkata Metro Purple Line was inaugurated on 6 March 2024 by Prime Minister [[Narendra Modi]], along with the truncated sections of [[Esplanade metro station|Esplanade]]–[[Howrah Maidan metro station|Howrah Maidan]] under [[Green Line (Kolkata Metro)|Green Line]] and [[Kavi Subhash metro station|Kavi Subhash]]–[[Hemanta Mukhopadhyay metro station|Hemanta Mukhopadhyay]] under [[Orange Line (Kolkata Metro)|Orange Line]].&amp;lt;ref&amp;gt;{{Cite news |date=2024-02-19 |title=Hope for ops start of three new Metro links in March first week |url=https://timesofindia.indiatimes.com/city/kolkata/hope-for-ops-start-of-three-new-metro-links-in-march-first-week/articleshow/107806433.cms |access-date=2024-02-21 |work=The Times of India |issn=0971-8257}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |last=MP |first=Team |date=2023-10-10 |title=RVNL targets completion of Majerhat to Esplanade Metro stretch within 48 months |url=https://www.millenniumpost.in/bengal/rvnl-targets-completion-of-majerhat-to-esplanade-metro-stretch-within-48-months-536066 |access-date=2024-03-17 |website=www.millenniumpost.in |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
On 10 July 2025, a significant milestone was achieved in this project as the assembled [[Tunnel boring machine|TBM]]– S1410 (Durga) started digging up the tunnel near [[Khidirpur metro station]], inside the premises of [[St Thomas School, Kolkata|St Thomas School]]. This digging work will continue till [[Park Street metro station (Kolkata)|Park Street metro station]] via [[Victoria metro station (Kolkata)|Victoria metro station]], after which the remaining section will be done using [[cut-and-cover]] method.&amp;lt;ref&amp;gt;{{Cite AV media |url=https://www.youtube.com/watch?v=XR61-nB4jTA |title=Commencement of Tunneling by TBM - S1410 (DURGA) |language=en |access-date=2025-07-10 |via=www.youtube.com}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==List of stations==&lt;br /&gt;
{{Main|List of Kolkata metro stations}}&lt;br /&gt;
&lt;br /&gt;
The work has been sanctioned in 2010-11 for the new Metro line from [[Joka, Kolkata|Joka]] to [[B.B.D. Bagh]] for a length of {{Cvt|16.72|km}} at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at [[Esplanade, Kolkata|Esplanade]]. A separate Depot was built by RVNL in Joka. The tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for {{Cvt|3.39|km}} has been sanctioned in the Budget of 2012–13 at a cost of Rs. 294.49 Cr. Another extension from Esplanade to Eden Gardens has been sanctioned in March 2025 by Ministry of Railways at a cost of Rs. 1000 Cr. The execution of this work has been entrusted to RVNL.&lt;br /&gt;
&lt;br /&gt;
There 2 phases of work and 4 extensions are planned in this line –&lt;br /&gt;
* Phase 1:&lt;br /&gt;
** Joka to Majherhat (Operational)&lt;br /&gt;
* Phase 2:&lt;br /&gt;
** Majherhat to Eden Gardens (Under Construction)&lt;br /&gt;
* Extensions:&lt;br /&gt;
** IIM-Joka to Joka (Approved)&lt;br /&gt;
** IIM-Joka to Diamond Park (Approved)&lt;br /&gt;
** Diamond Park to Mahanayak Uttam Kumar (Proposed) &lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align:center;margin:auto;&amp;quot;&lt;br /&gt;
|- &lt;br /&gt;
! colspan=&amp;quot;16&amp;quot; align=&amp;quot;center&amp;quot; style=&amp;quot;background:#{{rcr|Kolkata Metro|Purple}};&amp;quot; |&amp;lt;span style=&amp;quot;color: white;&amp;quot;&amp;gt;Purple Line (Main Line) &amp;lt;/span&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
! No.&lt;br /&gt;
! colspan=&amp;quot;2&amp;quot; |Station Name&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Distance (km)&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Opening&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Connections&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Layout&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Platform Type&lt;br /&gt;
|-&lt;br /&gt;
!&lt;br /&gt;
!English&lt;br /&gt;
!Bengali&lt;br /&gt;
|-&lt;br /&gt;
| 1||[[IIM Calcutta metro station|IIM-Joka]] ||আইআইএম জোকা|| 0 || Approved|| || rowspan=&amp;quot;9&amp;quot;|Elevated || &amp;#039;&amp;#039;TBD&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
| 2|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Joka}}||জোকা|| 1.572 || rowspan=&amp;quot;6&amp;quot;|30 December 2022 || ||rowspan=&amp;quot;7&amp;quot;|Side&lt;br /&gt;
|-&lt;br /&gt;
| 3|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Thakurpukur}}||ঠাকুরপুকুর||1.45 ||&lt;br /&gt;
|-&lt;br /&gt;
| 4|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Sakher Bazar}}||সখেরবাজার|| 1.22 ||&lt;br /&gt;
|-&lt;br /&gt;
| 5|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Behala Chowrasta}}||বেহালা চৌরাস্তা|| 1.45 ||&lt;br /&gt;
|-&lt;br /&gt;
| 6|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Behala Bazar}}||বেহালা বাজার|| 1.34 ||&lt;br /&gt;
|-&lt;br /&gt;
| 7|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Taratala}}||তারাতলা|| 1.03&lt;br /&gt;
|-&lt;br /&gt;
| 8|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Majerhat}}||মাঝেরহাট|| 1.25|| 6 March 2024||{{rint|kolkata|s}} &amp;#039;&amp;#039;&amp;#039;[[Majerhat Railway Station|Majerhat]]&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
| 9|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Mominpur}}||মোমিনপুর|| 1.015|| &amp;#039;&amp;#039;November 2026&amp;#039;&amp;#039;|| || rowspan=6|&amp;#039;&amp;#039;TBD&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
|10|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Khidirpur}}||খিদিরপুর|| 1.115||rowspan=&amp;quot;4&amp;quot; |&amp;#039;&amp;#039;May 2028&amp;#039;&amp;#039;|| || rowspan=&amp;quot;5&amp;quot; | Underground&lt;br /&gt;
|-&lt;br /&gt;
|11|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Victoria}}||ভিক্টোরিয়া|| 2.155&lt;br /&gt;
|-&lt;br /&gt;
|12|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Park Street}}||পার্ক স্ট্রিট|| 1.265||{{rint|Kolkata|blue}}&lt;br /&gt;
|-&lt;br /&gt;
|13|| align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Esplanade}}||এসপ্ল্যানেড|| 0.925 || {{rint|Kolkata|blue}}&amp;lt;br/&amp;gt;{{rint|Kolkata|green}}&lt;br /&gt;
|-&lt;br /&gt;
|14||{{stl|Kolkata Metro|Eden Gardens}}||ইডেন গার্ডেনস|| – ||&amp;#039;&amp;#039;May 2028&amp;#039;&amp;#039;||{{rint|kolkata|s}} &amp;#039;&amp;#039;&amp;#039;[[Eden Gardens railway station|Eden Gardens]]&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align:center;margin:auto;&amp;quot;&lt;br /&gt;
|- &lt;br /&gt;
! colspan=&amp;quot;16&amp;quot; align=&amp;quot;center&amp;quot; style=&amp;quot;background:#{{rcr|Kolkata Metro|Purple}};&amp;quot; |&amp;lt;span style=&amp;quot;color: white;&amp;quot;&amp;gt;Purple Line (Branch Line) &amp;lt;/span&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
! No.&lt;br /&gt;
! colspan=&amp;quot;2&amp;quot; |Station Name&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Distance (km)&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Opening&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Connections&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Layout&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Platform Type&lt;br /&gt;
|-&lt;br /&gt;
!&lt;br /&gt;
!English&lt;br /&gt;
!Bengali&lt;br /&gt;
|-&lt;br /&gt;
|1 ||[[IIM Calcutta metro station|IIM-Joka]]&lt;br /&gt;
|আইআইএম জোকা&lt;br /&gt;
|&lt;br /&gt;
|Rowspan = &amp;quot;2&amp;quot; |Approved&lt;br /&gt;
|&lt;br /&gt;
|Rowspan = &amp;quot;2&amp;quot; |Elevated&lt;br /&gt;
|Rowspan = &amp;quot;6&amp;quot; |&amp;#039;&amp;#039;TBD&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
|2 || align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Diamond Park}}&lt;br /&gt;
|ডায়মন্ড পার্ক&lt;br /&gt;
|&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|3 || align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Thakurpukur Cancer Hospital}}&lt;br /&gt;
|ঠাকুরপুকুর ক্যান্সার হাসপাতাল&lt;br /&gt;
|&lt;br /&gt;
|Rowspan =&amp;quot;4&amp;quot;|Proposed&lt;br /&gt;
|&lt;br /&gt;
|Rowspan =&amp;quot;3&amp;quot;|Underground&lt;br /&gt;
|-&lt;br /&gt;
|4 || align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Ramchandrapur}}&lt;br /&gt;
|রামচন্দ্রপুর&lt;br /&gt;
|&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|5 || align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Panchanantala}}&lt;br /&gt;
|পঞ্চাননতলা&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|6 || align=&amp;quot;center&amp;quot; |{{stl|Kolkata Metro|Mahanayak Uttam Kumar}}&lt;br /&gt;
|মহানায়ক উত্তম কুমার&lt;br /&gt;
|&lt;br /&gt;
|{{rint|Kolkata|Blue}}&lt;br /&gt;
|At-grade&lt;br /&gt;
|-&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== Rolling stock ==&lt;br /&gt;
{{Main|Kolkata Metro rolling stock}}&lt;br /&gt;
&lt;br /&gt;
===[[Integral Coach Factory|ICF]]/MEDHA 400 SERIES CBTC===&lt;br /&gt;
&lt;br /&gt;
[[File:ICF MEDHA 400 SERIES CBTC.jpg|thumb]] [[File:ICF MEDHA 418.jpg|thumb]]&lt;br /&gt;
&lt;br /&gt;
===[[Integral Coach Factory|ICF]]/MEDHA 800 SERIES CBTC===&lt;br /&gt;
&lt;br /&gt;
[[File:ICF MEDHA 800 SERIES CBTC.png|thumb]]&lt;br /&gt;
&lt;br /&gt;
== Gallery ==&lt;br /&gt;
&amp;lt;gallery mode=&amp;quot;packed&amp;quot;&amp;gt;&lt;br /&gt;
File:ICF Medha Rake Mr 418 During the Inauguration Day of Line 3 at Joka Metro Station.jpg|ICF Medha rake MR 418 on the day of inauguration of Purple Line at Joka metro station&lt;br /&gt;
File:Joka-Taratala purple metro line no.3 inauguration on 30th december 2022 22.webm|The day of inauguration of phase 1&lt;br /&gt;
&amp;lt;/gallery&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==See also==&lt;br /&gt;
* [[List of Kolkata metro stations]]&lt;br /&gt;
* [[Kolkata Metro Rolling Stock]]&lt;br /&gt;
* [[2018 Kolkata bridge collapse]]&lt;br /&gt;
* [[Kolkata Suburban Railway]]&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references&amp;gt;&lt;br /&gt;
&amp;lt;ref name=&amp;quot;railway-gazette&amp;quot;&amp;gt;{{cite news |title=CAF to supply Kolkata metro trains |url=https://www.railwaygazette.com/news/urban/single-view/view/caf-to-supply-kolkata-metro-trains.html |access-date=6 September 2018 |publisher=Railway Gazette |date=9 September 2012}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&amp;lt;/references&amp;gt;&lt;br /&gt;
&lt;br /&gt;
{{Kolkata Metro|purple line=yes}}&lt;br /&gt;
{{Kolkata topics}}&lt;br /&gt;
{{Rapid transit in India}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Kolkata Metro lines]]&lt;br /&gt;
[[Category:750 V DC railway electrification]]&lt;br /&gt;
[[Category:2022 establishments in India]]&lt;br /&gt;
[[Category:Railway lines opened in 2022]]&lt;/div&gt;</summary>
		<author><name>Coolblack5</name></author>
	</entry>
</feed>