<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Pink_Line_%28Kolkata_Metro%29</id>
	<title>Pink Line (Kolkata Metro) - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Pink_Line_%28Kolkata_Metro%29"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Pink_Line_(Kolkata_Metro)&amp;action=history"/>
	<updated>2026-11-16T19:57:32Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Pink_Line_(Kolkata_Metro)&amp;diff=525561&amp;oldid=prev</id>
		<title>Bhushana: done - done</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Pink_Line_(Kolkata_Metro)&amp;diff=525561&amp;oldid=prev"/>
		<updated>2026-02-28T20:18:41Z</updated>

		<summary type="html">&lt;p&gt;done - done&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Redirect|Kolkata Metro Line 5|other uses|Line 5 (disambiguation){{!}}Line 5}}&lt;br /&gt;
{{short description|Transit line in Kolkata, India}}&lt;br /&gt;
{{Use dmy dates|date=March 2017}}&lt;br /&gt;
{{Use Indian English|date=March 2017}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| name                            = {{rcb|Kolkata Metro|Pink|croute}}&lt;br /&gt;
| color                           = {{rail color|Kolkata Metro|Pink}}&lt;br /&gt;
| logo                            = [[File:Kolkata Metro Pink Line.svg|50px]]&lt;br /&gt;
| logo_width                      = &lt;br /&gt;
| logo_alt                        = &lt;br /&gt;
| image                           = File:Kolkata metro pink line pillars.jpg&lt;br /&gt;
| caption                         = Kolkata Metro Pink line pillars, under construction&lt;br /&gt;
| image_alt                       = &lt;br /&gt;
| type                            = [[Rapid transit]]&lt;br /&gt;
| system                          = [[Kolkata Metro]]&lt;br /&gt;
| status                          = Planned but construction not started&lt;br /&gt;
| locale                          = {{flagicon|IND}} [[Kolkata Metropolitan Region]], India&lt;br /&gt;
| start                           = [[Baranagar metro station|Baranagar]] (south)&lt;br /&gt;
| end                             = [[Barrackpore]] (north)&lt;br /&gt;
| connectinglines                 = {{rcb|Kolkata Metro|Blue|croute}}&lt;br /&gt;
| stations                        = 11&lt;br /&gt;
| routes                          = &lt;br /&gt;
| daily_ridership                 = &lt;br /&gt;
| open                            = &lt;br /&gt;
| planopen                        = &lt;br /&gt;
| close                           = &lt;br /&gt;
| owner                           = [[Indian Railways]]&lt;br /&gt;
| operator                        = [[Kolkata Metro|Metro Railway, Kolkata]]&lt;br /&gt;
| character                       = Elevated&lt;br /&gt;
| depot                           = [[Noapara Depot]]&lt;br /&gt;
| stock                           = &lt;br /&gt;
| linelength                      = {{convert|12.50|km|mi}}&amp;lt;ref name=&amp;quot;mtp&amp;quot;&amp;gt;{{cite web |title=New System Map of Kolkata Metro |url=https://mtp.indianrailways.gov.in/view_section.jsp?lang=0&amp;amp;id=0,1,285}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
| tracklength                     = &lt;br /&gt;
| tracks                          = 2&lt;br /&gt;
| gauge                           = {{Track gauge|5ft6in|lk=on}} [[broad gauge]]&lt;br /&gt;
| electrification                 = 750 [[Volt|V]] [[Direct current|DC]]&amp;lt;ref&amp;gt;[http://www.railwaygazette.com/news/urban/single-view/view/caf-to-supply-kolkata-metro-trains.html &amp;#039;&amp;#039;CAF to supply Kolkata metro trains&amp;#039;&amp;#039;] {{Webarchive|url=https://web.archive.org/web/20140816102540/http://www.railwaygazette.com/news/urban/single-view/view/caf-to-supply-kolkata-metro-trains.html |date=16 August 2014 }}, Railway Gazette, 9 September 2012&amp;lt;/ref&amp;gt; using [[third rail]]&lt;br /&gt;
| speed                           = 80 km/h (designed)&lt;br /&gt;
| website                         = {{URL|https://mtp.indianrailways.gov.in|Indian Railways}}&lt;br /&gt;
| map_name                        = Route Map&lt;br /&gt;
| map                      = [[File:Kolkata Metro Pink Line Route Map.png|300px]]&lt;br /&gt;
|map_state = show&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Pink Line&amp;#039;&amp;#039;&amp;#039; is a planned [[rapid transit]] metro line of the [[Kolkata Metro]] in [[Kolkata]], [[West Bengal]], [[India]]. The line will run from [[Baranagar]] to [[Barrackpore]], with a length of {{Cvt|12.50|km}}. It was sanctioned in 2009, at a cost of Rs.2070 crore,&amp;lt;ref name=&amp;quot;:0&amp;quot;&amp;gt;{{Cite web|url=https://timesofindia.indiatimes.com/city/kolkata/metro-iffy-about-states-barrackpore-route-plan/articleshow/64183476.cms|title=Metro: Metro iffy about state&amp;#039;s Barrackpore route plan {{!}} Kolkata News - Times of India|last=Bandyopadhyay|first=Krishnendu|date=May 16, 2018|website=The Times of India|language=en|access-date=2020-02-28}}&amp;lt;/ref&amp;gt; to enable a quicker commuter service from the northern suburbs to [[Kolkata]].&lt;br /&gt;
&lt;br /&gt;
== Route ==&lt;br /&gt;
=== Stations (South to North) ===&lt;br /&gt;
The stations in this line are:&amp;lt;ref&amp;gt;{{Cite web |title=Metro Railway Kolkata / Indian Railways Portal |url=https://mtp.indianrailways.gov.in/view_section.jsp?id=0,1,285&amp;amp;lang=0 |access-date=2024-03-07 |website=mtp.indianrailways.gov.in}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align: center;&amp;quot; width=&amp;quot;100%&amp;quot;&lt;br /&gt;
|- &lt;br /&gt;
! colspan=&amp;quot;11&amp;quot; align=&amp;quot;center&amp;quot; style=&amp;quot;background:#{{rcr|Kolkata Metro|Pink}};&amp;quot; |&amp;lt;span style=&amp;quot;color:BLACK;&amp;quot;&amp;gt;&amp;#039;&amp;#039;&amp;#039;Pink Line&amp;#039;&amp;#039;&amp;#039;&amp;lt;/span&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |#&lt;br /&gt;
! colspan=&amp;quot;2&amp;quot; |Station Name&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Opening&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Connections&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Layout&lt;br /&gt;
! rowspan=&amp;quot;2&amp;quot; |Platform type&lt;br /&gt;
|-&lt;br /&gt;
![[English language|English]]||[[Bengali language|Bengali]]&lt;br /&gt;
|-&lt;br /&gt;
&lt;br /&gt;
|1|| align=&amp;quot;center&amp;quot; |[[Baranagar metro station|Baranagar]]||বরাহনগর||Proposed||{{rcb|Kolkata Metro|blue|croute}}&amp;lt;br&amp;gt;{{Rail-interchange|kolkata|s}} [[Baranagar Road railway station|Baranagar Road]] ||Elevated&lt;br /&gt;
|Side&lt;br /&gt;
|-&lt;br /&gt;
|2|| align=&amp;quot;center&amp;quot; |Krishna Kali (Kamarhati)||কৃষ্ণ কলি||Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
| To be decided&lt;br /&gt;
|-&lt;br /&gt;
|3|| align=&amp;quot;center&amp;quot; |Acharya Prafulla Chandra (Agarpara)||আচার্য প্রফুল্ল চন্দ্র&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|4|| align=&amp;quot;center&amp;quot; |Gandhi Ashram (Sodepur)||গান্ধী আশ্রম&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|5|| align=&amp;quot;center&amp;quot; |Sarat Chandra (Panihati)||শরৎ চন্দ্র&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|6|| align=&amp;quot;center&amp;quot; |Subhas Nagar (Sukchar)||সুভাষ নগর&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|7|| align=&amp;quot;center&amp;quot; |Rishi Bankim (Khardaha)||ঋষি বঙ্কিম&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|8|| align=&amp;quot;center&amp;quot; |Dr. Rajendra Prasad (Tatagate)||ড. রাজেন্দ্র প্রসাদ&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|9|| align=&amp;quot;center&amp;quot; |Shah Nawaz Khan (Titagarh)||শাহ নওয়াজ খান&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|10|| align=&amp;quot;center&amp;quot; |Anukul Thakur (Talpukur)||অনূকুল ঠাকুর&lt;br /&gt;
|Proposed||&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|-&lt;br /&gt;
|11|| align=&amp;quot;center&amp;quot; |Mangal Pandey (Barrackpore)||মঙ্গল পাণ্ডে&lt;br /&gt;
|Proposed||{{Rail-interchange|kolkata|s}} [[Barrackpore railway station|Barrackpore]]&lt;br /&gt;
|Elevated&lt;br /&gt;
|To be decided&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== Proposed realignment ==&lt;br /&gt;
[[File:Baranagar-Barrackpore Metro Railway Extension Signage - Barrackpore Trunk Road - Panihati - North 24 Parganas 2012-04-11 9478.JPG|thumb|Kolkata Metro Pink Line Signage]]&lt;br /&gt;
State government proposed for realigning the line via [[Kalyani Expressway]], instead of [[Barrackpore Trunk Road|B.T. Road]], due to the presence of arterial water pipelines, that supply water to the city, below BT Road. The construction might create huge traffic jam along the road and also damage the water pipelines, which will cutoff the city&amp;#039;s water supply. This will increase the length to {{Cvt|17|km|4=2}}.  [https://www.hindustantimes.com/kolkata/fate-of-baranagar-barrackpore-metro-hinges-on-kmc-clearance/story-AfNEV1Tue6EQvqsjF1w71O.html].&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt;&amp;lt;ref&amp;gt;{{Cite web|url=https://www.telegraphindia.com/west-bengal/barrackpore-metro-detour-to-kalyani/cid/1408534|title=Barrackpore Metro &amp;#039;detour&amp;#039; to Kalyani|website=www.telegraphindia.com|language=en|access-date=2020-02-28}}&amp;lt;/ref&amp;gt; This proposal is not feasible as fresh sanctioned from rail way board was required . It would provide the eassy movement to the residents near by BT Road which is huge traffic congesent .  There are 6 nos pipe lines of 64&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;, 72&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;, 42&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;,60&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt; 48&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt; &amp;amp; 62&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;  diameter  have been laid in the year 2012, 1957–61, 1868–84, 1922–36, 1888-93 1971-96 respectively.  Arrangement of pipe lines are east to west sidesunder BT road.  ROW  of BT Road is average 40–42 m. KMC&amp;#039;S Engineers views that constructions of  central pier system metro stations like others metro cities is possible. on diverting the flow of existing  48&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;, 60&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;, &amp;amp; 42&amp;lt;nowiki&amp;gt;&amp;#039;&amp;#039;&amp;lt;/nowiki&amp;gt;  pipelines on laying one by one new pipe line.&lt;br /&gt;
&lt;br /&gt;
Accordingly Project implemeting agency  RVNL has submitted the revised sequence of construction as under .&lt;br /&gt;
&lt;br /&gt;
      1. Laying an additional 60 inches diameter pipe line between Baranagar (Dunlop Bridge) to Barrackpore (Chiriamore) and installation of connection of newly laid 60 inch diameter (MS welded pipe line by Micro Tunneling Method) with existing old 60 inch diameter pipe line and existing 48 inch diameter old pipe line by means of butterfly valve arrangement after taking shut down in stages to suit the site requirements.&lt;br /&gt;
&lt;br /&gt;
        2. On diverting flow of existing 48 inches pipeline through the newly laid 60 inches pipe line, the work along this pipe line (Casting of pile and realignment of 48 inches pipe line by DI pipe) will be taken up.&lt;br /&gt;
&lt;br /&gt;
          3. On completing the mentioned work along existing 48 inches pipeline,  the flow of this pipe line will be restored as earlier and the flow of existing   60 inches pipeline will be diverted through the newly laid 60 inches diameter pipe line to defunct this pipe line. The casting of pipe, pile cap and other structural work will be taken up along this 60 inches diameter pipeline on defunct condition without disturbing the 42 inch diameter pipe line as it is not infringing / influencing Metro construction and installation. It is also proposed that the entire work will be done in two phase ie. 1st phase Baranagar to Gandhi Ashram Metro station and 2nd phase remaining portion.&lt;br /&gt;
&lt;br /&gt;
==See also==&lt;br /&gt;
*[[List of Kolkata Metro stations]]&lt;br /&gt;
*[[Kolkata Metro rolling stock]]&lt;br /&gt;
*[[Lists of rapid transit systems]]&lt;br /&gt;
*[[Trams in Kolkata]]&lt;br /&gt;
*[[Kolkata Light Rail Transit]]&lt;br /&gt;
*[[Kolkata Monorail]]&lt;br /&gt;
*[[Kolkata Suburban Railway]]&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
{{reflist|2}}&lt;br /&gt;
&lt;br /&gt;
{{Kolkata Metro|pink line=yes}}&lt;br /&gt;
{{Kolkata topics}}&lt;br /&gt;
{{Rapid transit in India}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Kolkata Metro lines]]&lt;br /&gt;
[[Category:750 V DC railway electrification]]&lt;/div&gt;</summary>
		<author><name>Bhushana</name></author>
	</entry>
</feed>