<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=NVS-02</id>
	<title>NVS-02 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=NVS-02"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=NVS-02&amp;action=history"/>
	<updated>2026-11-24T10:44:19Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=NVS-02&amp;diff=519614&amp;oldid=prev</id>
		<title>Vikibnf: new basic entry w/ infobox</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=NVS-02&amp;diff=519614&amp;oldid=prev"/>
		<updated>2026-02-25T11:41:07Z</updated>

		<summary type="html">&lt;p&gt;new basic entry w/ infobox&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|Indian navigation satellite}}&lt;br /&gt;
{{Use dmy dates|date=January 2025}}&lt;br /&gt;
{{Infobox spaceflight&lt;br /&gt;
| auto               = all&lt;br /&gt;
| name               = NVS-02&lt;br /&gt;
| image              = GSLV-F15, NVS-02 — Pre launch image of NVS-02 in cleanroom 02.webp&lt;br /&gt;
| image_caption      = NVS series spacecraft&lt;br /&gt;
| mission_type       = [[Satellite navigation|Navigation]]&lt;br /&gt;
| operator           = [[ISRO]]&lt;br /&gt;
| website            = &lt;br /&gt;
| COSPAR_ID          = 2025-020A&lt;br /&gt;
| SATCAT             = 62850&lt;br /&gt;
| mission_duration   = &lt;br /&gt;
| spacecraft_bus     = [[I-2K]]&lt;br /&gt;
| manufacturer       = [[Indian Space Research Organisation Satellite Centre|ISRO Satellite Centre]]&amp;lt;br /&amp;gt;[[Space Applications Centre]]&lt;br /&gt;
| dry_mass           = &lt;br /&gt;
| launch_mass        = 2250 kg&lt;br /&gt;
| power              = 3 kW&lt;br /&gt;
| launch_date        = 29 January 2025, 06:23 [[Indian Standard Time|IST]]&lt;br /&gt;
| launch_rocket      = [[GSLV-F15]]&lt;br /&gt;
| launch_site        = [[Satish Dhawan Space Centre|Satish Dhawan]], [[Satish Dhawan Space Centre Second Launch Pad|SLP]]&lt;br /&gt;
| launch_contractor  = [[Indian Space Research Organisation|ISRO]]&lt;br /&gt;
| disposal_type      = &lt;br /&gt;
| deactivated        = &lt;br /&gt;
| last_contact       = &lt;br /&gt;
| decay_date         = &lt;br /&gt;
| orbit_reference    = [[Geocentric orbit|Geocentric]]&lt;br /&gt;
| orbit_regime       = [[Geostationary Transfer Orbit|GTO]]&lt;br /&gt;
| orbit_periapsis    = {{convert|165|km|abbr=on}}&lt;br /&gt;
| orbit_apoapsis     = {{convert|36577|km|abbr=on}}&lt;br /&gt;
| orbit_inclination  = &lt;br /&gt;
| orbit_period       = &lt;br /&gt;
| orbit_longitude    = 111.75° East (planned)&lt;br /&gt;
| apsis              = gee&lt;br /&gt;
| programme          = [[Indian Regional Navigation Satellite System|NVS series]]&lt;br /&gt;
| previous_mission   = [[NVS-01]]&lt;br /&gt;
| next_mission       = [[NVS-03]]&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;NVS-02&amp;#039;&amp;#039;&amp;#039; is the second satellite in the [[Indian Regional Navigation Satellite System|NVS series]], equipped with navigation payloads in L1, L5, and S bands, as well as a ranging payload in C-band. The vehicle is based on the conventional [[I-2K]] bus platform, with a lift-off mass of 2250&amp;amp;nbsp;kg and a power handling capacity of approximately 3 kW. It was planned to replace  [[IRNSS-1E]] at the orbital slot of 111.75° East.&amp;lt;ref&amp;gt;{{Cite news |last1=C.S |first1=Hemanth |title=ISRO successfully launches NVS-02 satellite; creates history with the 100th launch from Sriharikota |url=https://www.thehindu.com/sci-tech/isro-successfully-launches-nvs-02-satellite/article69153254.ece |access-date=29 January 2025 |work=[[The Hindu]] |date=29 January 2025 |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |title=Hitting a century, ISRO launches 100th satellite NVS-02 from Sriharikota |url=https://www.deccanherald.com/science/space/hitting-a-century-isro-launches-100th-satellite-nvs-02-from-sriharikota-3377455 |access-date=29 January 2025 |publisher=[[Deccan Herald]] |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |last1=Roushan |first1=Anurag |title=ISRO&amp;#039;s 100th mission – How will NVS-02 satellite boost India&amp;#039;s GPS alternative? Explained |url=https://www.indiatvnews.com/explainers/isro-100th-mission-how-will-nvs-02-satellite-boost-gps-alternative-for-india-geosynchronous-satellite-launch-vehicle-sriharikota-explained-2025-01-29-973564 |access-date=29 January 2025 |website=indiatvnews.com |date=29 January 2025 |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Description ==&lt;br /&gt;
NVS-02, the second satellite in the NVS series is configured with Navigation payload in [[L band|L1]], [[L band|L5]] and [[S band]]s in addition to ranging payload in [[C band (IEEE)|C-band]] like its predecessor-NVS-01.It was planned to provide two types of services, namely, &amp;#039;&amp;#039;Standard Positioning Service (SPS)&amp;#039;&amp;#039; and &amp;#039;&amp;#039;Restricted Service (RS)&amp;#039;&amp;#039;. SPS provides a position accuracy of better than 20&amp;amp;nbsp;m (2σ) and timing accuracy better than 40 ns (2σ) over the primary service Area.&amp;lt;ref name=&amp;quot;:0&amp;quot;&amp;gt;{{Cite web |title=NVS-02: Advancing India&amp;#039;s Regional Navigation Capabilities |url=https://www.isro.gov.in/NVS-02_Advancing_Navigation_Capabilities.html |access-date=2025-02-04 |website=www.isro.gov.in}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
NVS-02 satellite was designed, developed and integrated at [[U R Rao Satellite Centre|U R Rao Satellite Centre (URSC)]] with the support of other satellite-based work Centres. On completion of Assembly and Integrated Testing (AIT), the satellite was subjected to satellite level thermovac test to verify and validate its design and performance in simulated space environment during November-December 2024. The satellite underwent dynamic test during December 2024 thus confirming its suitability to withstand the dynamic loads anticipated during launch.&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A comprehensive Pre-shipment Review (PSR) of the performance and compliance of the Satellite during various phases of its realization was completed on 27 December 2024. The satellite was flagged off to SDSC-SHAR on 5 January 2025.&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== History ==&lt;br /&gt;
&lt;br /&gt;
=== Launch ===&lt;br /&gt;
NVS-02 was launched aboard [[GSLV F15|GSLV-F15.]]The rocket lifted off from the spaceport’s second launch pad at 6.23 a.m. on 29 January 2025, marking ISRO&amp;#039;s first launch of the year  and the 17th flight of the [[Geosynchronous Satellite Launch Vehicle|GSLV]] and the 11th flight of Mk2 Variant. The satellite was injected into the [[Geostationary transfer orbit|GTO]] 19 minutes after launch from Sriharikota. This marked ISRO&amp;#039;s 100th Spaceflight launch from [[Satish Dhawan Space Centre|Satish Dhawan Space Center]].&amp;lt;ref&amp;gt;{{Cite web |date=2025-01-29 |title=GSLV-F15 lifts off with NVS-02 satellite in Isro&amp;#039;s 100th launch from Sriharikota |url=https://www.indiatoday.in/science/story/isro-gslv-f15-nvs-02-mission-launched-navic-system-100th-lunahc-sriharikota-2671657-2025-01-29 |access-date=2025-02-01 |website=India Today |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |last=C.S |first=Hemanth |date=2025-01-29 |title=ISRO successfully launches NVS-02 satellite; creates history with the 100th launch from Sriharikota |url=https://www.thehindu.com/sci-tech/isro-successfully-launches-nvs-02-satellite/article69153254.ece |access-date=2025-02-01 |work=The Hindu |language=en-IN |issn=0971-751X}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |date=2025-01-29 |title=Isro&amp;#039;s GSLV-F15 rocket carrying navigation satellite NVS-02 lifts off from Sriharikota |url=https://timesofindia.indiatimes.com/india/isros-gslv-f15-rocket-carrying-navigation-satellite-nvs-02-lifts-off-from-sriharikota/articleshow/117661968.cms |access-date=2025-02-01 |work=The Times of India |issn=0971-8257}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
=== Fuel system failure ===&lt;br /&gt;
Following launch, ISRO reported that [[orbit raising]] operations towards positioning the satellite to the designated [[orbital slot]] could not be carried out as the valves for admitting the [[Oxidizing agent|oxidizer fuel]] for the main engine did not open. From this point, the spacecraft was determined to not be able to complete its mission objectives. The spacecraft is currently still in a [[Geostationary transfer orbit]] with a [[perigree|perigee]] of about 165&amp;amp;nbsp;km and an [[apogee]] of around 36,577&amp;amp;nbsp;km. All other Systems are reported to be working normally.&amp;lt;ref&amp;gt;{{Cite web |title=ISRO&amp;#039;s Latest Mission Hits A Hurdle, Satellite Faces Technical Glitch |url=https://www.ndtv.com/india-news/isro-100th-mission-hits-a-hurdle-satellite-faces-technical-glitch-7618493 |access-date=2025-02-02 |website=ndtv.com |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite news |date=2025-02-02 |title=ISRO&amp;#039;s orbit raising operations for NVS-02 satellite disrupted by valve malfunction |url=https://www.thehindu.com/sci-tech/science/isros-orbit-raising-operations-for-nvs-02-satellite-disrupted-by-valve-malfunction/article69173305.ece |access-date=2025-02-02 |work=[[The Hindu]] |language=en |issn=0971-751X}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
=== Analysis ===&lt;br /&gt;
ISRO has formed a Failure Analysis committee headed by former Chairman [[A. S. Kiran Kumar|A S Kiran Kumar]] to look into the causes for the failure of the pyro valve in the spacecraft.&amp;lt;ref&amp;gt;{{Cite web |last=Jagannathan |first=Venkatachari |title=Former ISRO Chairman To Probe Failure |url=https://www.rediff.com/news/special/former-isro-chairman-to-probe-failure/20250208.htm |access-date=2025-02-09 |website=Rediff |language=en}}&amp;lt;/ref&amp;gt;The committee had determined the fault following a thorough investigation and presented the Failure Analysis Report to the Indian Government in October 2025.&amp;lt;ref&amp;gt;{{Cite news |date=2025-10-23 |title=Gaganyaan mission: 90% of development work completed, says ISRO Chairman |url=https://www.thehindu.com/sci-tech/science/gaganyaan-mission-90-of-development-work-completed-says-isro-chairman/article70193224.ece |access-date=2025-10-23 |work=The Hindu |language=en-IN |issn=0971-751X}}&amp;lt;/ref&amp;gt; The initial public report,as underlined by an ISRO press statement on 25th February 2026 concluded that the prime reason for flight failure was due to the ignition signal not reaching the pyro valve of the oxidizer line for the main engine,meant for [[orbit raising]] manauvers .The committee concluded that the most likely cause was the disengagement of  a contact in both the main and redundant valves of the fuel connectors. Similar deficiencies were identified and fixed prior to the launch of [[GSAT-7R|CMS-03]], which validated the newly built fixes with a more reduntant system.&amp;lt;ref&amp;gt;{{Cite web |title=NVS-02 Spacecraft: On-Orbit Observations and Apex Committee Recommendations |url=https://www.isro.gov.in/NVS-02-Spacecraft-On-Orbit-Observations.html |access-date=2026-02-25 |website=www.isro.gov.in}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |last=Science Desk |first=India Today |date=2026-02-25 |title=A year after NVS-02 satellite&amp;#039;s failure, Isro explains what went wrong in space |url=https://www.indiatoday.in/science/story/nvs-02-satellite-failure-reason-isro-explains-lvm-3-mission-2874191-2026-02-25 |access-date=2026-02-25 |website=India Today |language=en}}&amp;lt;/ref&amp;gt; The spacecraft remains in orbit.&lt;br /&gt;
&lt;br /&gt;
== See also ==&lt;br /&gt;
{{Portal|Spaceflight|India}}&lt;br /&gt;
* [[Communication-Centric Intelligence Satellite]] (CCI-Sat)&lt;br /&gt;
* [[GPS-aided geo-augmented navigation]] (GAGAN)&lt;br /&gt;
* [[Satellite navigation]]&lt;br /&gt;
&lt;br /&gt;
== Notes and references ==&lt;br /&gt;
{{Reflist}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== External links ==&lt;br /&gt;
* [https://www.isro.gov.in/FutureMissions.html ISRO Future Programmes]&lt;br /&gt;
&lt;br /&gt;
{{IRNSS satellites}}&lt;br /&gt;
{{GSLV}}&lt;br /&gt;
&lt;br /&gt;
[[Category:IRNSS satellites]]&lt;br /&gt;
[[Category:Spacecraft launched by India in 2025]]&lt;br /&gt;
[[Category:Spacecraft launched by GSLV rockets]]&lt;br /&gt;
[[Category:January 2025 in India]]&lt;/div&gt;</summary>
		<author><name>Vikibnf</name></author>
	</entry>
</feed>