<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Modipuram_Depot_metro_station</id>
	<title>Modipuram Depot metro station - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Modipuram_Depot_metro_station"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Modipuram_Depot_metro_station&amp;action=history"/>
	<updated>2026-10-26T03:43:10Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Modipuram_Depot_metro_station&amp;diff=518058&amp;oldid=prev</id>
		<title>Hayat hospital: Creating some stub from scratch!</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Modipuram_Depot_metro_station&amp;diff=518058&amp;oldid=prev"/>
		<updated>2026-04-25T15:55:50Z</updated>

		<summary type="html">&lt;p&gt;Creating some stub from scratch!&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|Under-construction metro station in Uttar Pradesh, India}}&lt;br /&gt;
{{Use dmy dates|date=March 2026}} &lt;br /&gt;
{{Use Indian English|date=March 2026}}&lt;br /&gt;
{{Infobox station&lt;br /&gt;
| name               = &amp;#039;&amp;#039;&amp;#039;AS3&amp;#039;&amp;#039;&amp;#039;&amp;lt;br&amp;gt;Modipuram Depot&lt;br /&gt;
| style              = Meerut Metro&lt;br /&gt;
| type               = &lt;br /&gt;
| image              = &lt;br /&gt;
| image_caption      = &lt;br /&gt;
| address            = Siwaya-Jamalullapur, [[Meerut]], [[Uttar Pradesh]], [[India]]&lt;br /&gt;
| coordinates        = {{coord|29.08483|77.70254|display=inline}}&lt;br /&gt;
| elevation          = &lt;br /&gt;
| owned              = [[National Capital Region Transport Corporation|NCRTC]]&lt;br /&gt;
| operator           = NCRTC&lt;br /&gt;
| line               = {{rcb|Meerut Metro|Blue|croute}} MRTS&lt;br /&gt;
| platform           = 2 [[side platforms]]&amp;lt;br /&amp;gt;Platform-1 → &amp;#039;&amp;#039;Terminus&amp;#039;&amp;#039;&amp;lt;br&amp;gt;Platform-2 → {{stl|RapidX|Meerut South}}&lt;br /&gt;
| tracks             = 2&lt;br /&gt;
| connections        = &lt;br /&gt;
| structure          = [[At-grade railway|At-grade]]&lt;br /&gt;
| levels             = 1&lt;br /&gt;
| parking            = In progress&lt;br /&gt;
| accessible         = In progress&lt;br /&gt;
| status             = Under construction&lt;br /&gt;
| code               = &lt;br /&gt;
| opened             = Q3 2026&lt;br /&gt;
| closed             = &lt;br /&gt;
| rebuilt            = &lt;br /&gt;
| electrified        = {{25 kV 50 Hz}} through [[overhead catenary]] (in progress) &lt;br /&gt;
| former             = &lt;br /&gt;
| passengers         = &lt;br /&gt;
| pass_system        = &lt;br /&gt;
| pass_year          = &lt;br /&gt;
| pass_percent       = &lt;br /&gt;
| services           = {{Adjacent stations|system=Meerut Metro|line1=Blue|left1=Modipuram}}&lt;br /&gt;
| route_map          = {{Meerut Metro Route}}&lt;br /&gt;
| mapframe           = yes&lt;br /&gt;
| mapframe-marker    = rail&lt;br /&gt;
| mapframe-marker-color = #FFFA4A&lt;br /&gt;
| mapframe-zoom      = 14&lt;br /&gt;
| map_state          = collapsed&lt;br /&gt;
| image_size         = &lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Modipuram Depot metro station&amp;#039;&amp;#039;&amp;#039; is an under-construction [[At-grade railway|at-grade]] or ground-level [[Meerut Metro]] station on the Delhi–Meerut RRTS corridor (also known as the &amp;#039;&amp;#039;&amp;#039;Namo Bharat&amp;#039;&amp;#039;&amp;#039; corridor) that will serve Siwaya-Jamalullapur in northern Modipuram, located in [[Meerut]], [[Uttar Pradesh]], [[India]]. It will serve as the last station and northern terminus of Meerut Metro and its trains, which run at a speed of 120 km/h. The RRTS trains, which will not stop here, will pass through the station at a slower speed due to the Modipuram Depot–also being built for maintenance and storage of the [[Namo Bharat (trainset)|RRTS]] and metro trains, just ahead of the metro station. The station is being constructed, to be owned and operated by the [[National Capital Region Transport Corporation]] (NCRTC).&amp;lt;ref name=&amp;quot;MM&amp;quot;&amp;gt;{{cite web |date=7 April 2026 |title=Modipuram Depot metro station–Meerut Metro|url=https://meerutmetro.in/modipuram-depot-meerut-metro-station|access-date=7 March 2026 |publisher=Meerut Metro}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;AU&amp;quot;&amp;gt;{{cite news|title=Meerut News: मेरठ साउथ से मोदीपुरम तक नमो भारत और मेट्रो के स्टेशन तैयार, डिपो का काम बाकी|url=https://www.amarujala.com/uttar-pradesh/meerut/namo-bharat-and-metro-stations-from-meerut-south-to-modipuram-are-ready-but-depot-work-is-pending-meerut-news-c-14-1-mrt1005-1106481-2026-02-12|work=Amar Ujala|date=12 February 2026|access-date=7 March 2026|language=en}}&amp;lt;/ref&amp;gt; &lt;br /&gt;
&lt;br /&gt;
The station is expected to be ready with the depot by the third quarter of 2026, while the rest of the Delhi–Meerut RRTS corridor with Meerut Metro was inaugurated on 22 February 2026.&amp;lt;ref name=&amp;quot;IT&amp;quot;&amp;gt;{{Cite web |date=2026-02-22 |title=PM inaugurates India&amp;#039;s fastest metro in Meerut, entire Namo Bharat corridor |url=https://www.indiatoday.in/india/story/pm-modi-namo-bharat-delhi-meerut-rrts-meerut-metro-yogi-adityanath-inauguration-2872326-2026-02-22|access-date=2026-02-22 |website=India Today |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |date=2026-02-22 |title=Delhi–Meerut RRTS now fully operational: Will improved connectivity drive real estate demand along the corridor? |url=https://www.hindustantimes.com/real-estate/delhimeerut-rrts-now-fully-operational-will-improved-connectivity-drive-real-estate-demand-along-the-corridor-101771743611396.html |access-date=2026-02-22 |website=Hindustan Times |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== History ==&lt;br /&gt;
The station is part of the 23 km-long Meerut Metro segment within the Delhi–Meerut RRTS corridor. Construction works began in early 2024 under the supervision of the National Capital Region Transport Corporation (NCRTC), due to Modipuram Depot&amp;#039;s plan coming later than the RRTS and metro on the table. All major civil works and finishing works, including electrical and platform installations, are underway as of March 2026. It is expected to be finished by the third quarter of 2026, while the rest of the entire RRTS and metro corridors were inaugurated on 22 February 2026.&amp;lt;ref name=&amp;quot;IT&amp;quot;/&amp;gt;&amp;lt;ref name=&amp;quot;MM&amp;quot;/&amp;gt;&amp;lt;ref name=&amp;quot;MRN&amp;quot;&amp;gt;{{cite news|title=KSM wins contract to construct the Modipuram Depot for the Delhi-Meerut RRTS project|url=https://metrorailnews.in/ksm-won-contract-to-construct-the-modipuram-depot-for-the-delhi-meerut-rrts-project/|work=Metro Rail News|date=17 February 2023|access-date=7 March 2026|language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Location ==&lt;br /&gt;
The station is being built just beside the [[Delhi–Meerut–Saharanpur line]] of the [[Indian Railways]], east of Sardar Vallabhbhai Patel University of Agriculture and Technology (SVPUAT), northwest of [[Indian Council of Agricultural Research]]-Indian Institute of Farming Systems Research (ICAR-IIFSR) Modipuram, {{cvt|4|km}} south of [[Daurala, Uttar Pradesh|Daurala]] and its railway station, and close to the [[National Highway 344B (India)|NH-334B]] running from [[Meerut]] to [[Roorkee]] in the east. Thanks to its location, the station will provide direct access to local transport routes, major landmarks and the outskirts of Meerut.&lt;br /&gt;
&lt;br /&gt;
== Design and structure ==&lt;br /&gt;
The station is being designed as an [[At-grade railway|at-grade]] or ground-level structure with two [[side platforms]] and two parallel tracks between them. The tracks will be used by both the RRTS trains–which will pass through without stopping, and metro trains–which will halt. This design will optimize land use and reduced construction costs, while also leaving space for future expansion or modifications.&lt;br /&gt;
&lt;br /&gt;
=== Facilities ===&lt;br /&gt;
&lt;br /&gt;
* Passenger waiting areas&lt;br /&gt;
* Ticket vending machines and smartcard facilities&lt;br /&gt;
* CCTV surveillance and security systems&lt;br /&gt;
* [[Platform screen doors]] (PSDs)&lt;br /&gt;
* Dedicated facilities for physically challenged passengers&lt;br /&gt;
* Parking and drop-off zones for last-mile connectivity&lt;br /&gt;
&lt;br /&gt;
== Connectivity ==&lt;br /&gt;
Apart from serving the metro, the station will make multiple transport options accessible for ease of travel, including local modes like [[autorickshaws]], buses and cabs. These plus points will improve accessibility and cut down travel time from Siwaya-Jamalullapur and towns like [[Daurala, Uttar Pradesh|Daurala]] outside Meerut to [[Meerut South RRTS station|Meerut South]], directly to [[Delhi]] through the RRTS and to Meerut&amp;#039;s city centre.&lt;br /&gt;
&lt;br /&gt;
== Station layout ==&lt;br /&gt;
&lt;br /&gt;
{{stack|{{Routemap&lt;br /&gt;
| title = &amp;lt;small&amp;gt;&amp;#039;&amp;#039;&amp;#039;AS3&amp;#039;&amp;#039;&amp;#039;&amp;lt;/small&amp;gt; Modipuram Depot metro station&lt;br /&gt;
| title-bg = #{{rail color|RapidX|Delhi–Meerut}}&lt;br /&gt;
| legend = track&lt;br /&gt;
| collapsible = no&lt;br /&gt;
| map = CONTg\CONTfa~~ ~~ ~~ to/from &amp;#039;&amp;#039;Terminus/Modipuram Depot and Workshop&amp;#039;&amp;#039;&lt;br /&gt;
PSTR(R)\PSTR(L)~~ ~~ ~~&amp;#039;&amp;#039;&amp;#039;Modipuram Depot&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
CONTge\CONTf~~ ~~ ~~ from/to [[File:A21 Modipuram RRTS station.svg|frameless|20px]] [[Modipuram RRTS station|Modipuram]]&lt;br /&gt;
| bottom = &amp;lt;div style=&amp;quot;width:23.5em;text-align:center&amp;quot;&amp;gt;Station with two tracks and two side platforms&amp;lt;br/&amp;gt;&amp;lt;small&amp;gt;&amp;#039;&amp;#039;** (The tracks will act as passageways for both the RRTS and metro trains.) &amp;#039;&amp;#039;&amp;lt;/small&amp;gt;&amp;lt;/div&amp;gt;&lt;br /&gt;
}}}}&lt;br /&gt;
{|table border=0 cellspacing=0 cellpadding=3&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;border-top:solid 1px gray;&amp;quot; width=50 valign=top|&amp;#039;&amp;#039;&amp;#039;G&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|style=&amp;quot;border-top:solid 1px gray;border-bottom:solid 1px gray;&amp;quot; width=100 valign=top|Street level&lt;br /&gt;
|style=&amp;quot;border-top:solid 1px gray;border-bottom:solid 1px gray;&amp;quot; width=500 valign=top|Exit/Entrance&lt;br /&gt;
|-&lt;br /&gt;
|valign=top|&amp;#039;&amp;#039;&amp;#039;G1&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|valign=top|Mezzanine/Concourse&lt;br /&gt;
|valign=top|Fare control, Station agent, Facilities, Retail stores, Token and ticket vending machines, Crossover&amp;lt;br/&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|style=&amp;quot;border-top:solid 1px gray;border-bottom:solid 1px gray;&amp;quot; width=50 rowspan=4 valign=top|&amp;#039;&amp;#039;&amp;#039;G2&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|style=&amp;quot;border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;&amp;quot; colspan=2|&amp;lt;small&amp;gt;[[Side platform]] | Doors will open on the left&amp;lt;/small&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;&amp;quot; width=100|{{blue|&amp;#039;&amp;#039;&amp;#039;Platform 1&amp;#039;&amp;#039;&amp;#039;&amp;lt;br/&amp;gt;&amp;#039;&amp;#039;&amp;#039;Northbound&amp;#039;&amp;#039;&amp;#039;}}&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;&amp;quot; width=500|Towards&lt;br /&gt;
&amp;#039;&amp;#039;Terminus&amp;#039;&amp;#039;&amp;lt;br&amp;gt;&amp;lt;small&amp;gt;&amp;#039;&amp;#039;&amp;#039;Next Station:&amp;#039;&amp;#039;&amp;#039;&amp;lt;/small&amp;gt;&amp;lt;br&amp;gt;&amp;lt;small&amp;gt;Modipuram Depot and Workshop&amp;lt;/small&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|{{blue|&amp;#039;&amp;#039;&amp;#039;Platform 2&amp;#039;&amp;#039;&amp;#039;&amp;lt;br/&amp;gt;&amp;#039;&amp;#039;&amp;#039;Southbound&amp;#039;&amp;#039;&amp;#039;}} &lt;br /&gt;
|Towards&lt;br /&gt;
[[File:A10 Meerut South RRTS station.svg|frameless|20x20px]] [[Meerut South RRTS station]]&amp;lt;br&amp;gt;&amp;lt;small&amp;gt;&amp;#039;&amp;#039;&amp;#039;Next Station:&amp;#039;&amp;#039;&amp;#039;&amp;lt;br&amp;gt;&amp;lt;/small&amp;gt;[[File:A21 Modipuram RRTS station.svg|frameless|20x20px]] &amp;lt;small&amp;gt;[[Modipuram RRTS station|Modipuram]]&amp;lt;/small&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|style=&amp;quot;border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;&amp;quot; colspan=2  align=center|&amp;lt;small&amp;gt;[[Side platform]] | Doors will open on the left&amp;lt;/small&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;&amp;quot; width=50 rowspan=2 valign=top|&amp;#039;&amp;#039;&amp;#039;G2&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;&amp;quot; width=100|&lt;br /&gt;
|style=&amp;quot;border-bottom:solid 1px gray;&amp;quot; width=500|&lt;br /&gt;
|-&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== Modipuram Depot and Workshop ==&lt;br /&gt;
&lt;br /&gt;
Roughly 400 metres ahead of the metro station, the Modipuram Depot is being built. Initially, the depot&amp;#039;s plan did not exist as part of the RRTS corridor. Later, due to the corridor&amp;#039;s long distance–which would have made ferrying trains to [[Duhai Depot RRTS station|Duhai Depot]] from a far-off place like Meerut very difficult for storage and maintenance, the plan for a second depot at Modipuram was made in late 2022.&amp;lt;ref&amp;gt;{{cite news|title=Delhi-Meerut RRTS second depot to come up at Modipuram|url=https://ncrtc.in/delhi-meerut-rrts-second-depot-to-come-up-at-modipuram-hindustan-times/|work=NCRTC|date=23 June 2024|access-date=7 March 2026}}&amp;lt;/ref&amp;gt; By the time the plan was put forward by the NCRTC, the RRTS and metro corridors were already under construction. This is why the Modipuram Depot did not become operational with the rest of the RRTS corridor on 22 February 2026.&amp;lt;ref name=&amp;quot;IT&amp;quot;/&amp;gt; Construction began from early 2024, and as of March 2026, it is expected to be finished by the end of 2026, along with the metro station.&amp;lt;ref name=&amp;quot;MM&amp;quot;/&amp;gt;&amp;lt;ref name=&amp;quot;MRN&amp;quot;/&amp;gt;&amp;lt;ref name=&amp;quot;AU&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The depot will be similar to the structure and design of the Duhai Depot. It will feature advanced amenities, including a Depot Control Centre (DCC), a train workshop, and 34 stabling lines to accommodate both [[Namo Bharat (trainset)|Namo Bharat]] and Meerut Metro trainsets. The depot will also include:&lt;br /&gt;
&lt;br /&gt;
• 4 inspection bay lines (IBLs)&amp;lt;br&amp;gt;• 4 workshop lines&amp;lt;br&amp;gt;• A 1.2 km-long test track&amp;lt;br&amp;gt;• Heavy internal and external coach cleaning facilities&amp;lt;br&amp;gt;• An automatic coach washing plant&amp;lt;ref&amp;gt;{{cite news|title=RRTS Update: Modipuram depot and metro station construction gains momentum on Namo Bharat corridor|url=https://railanalysis.in/metro/rrts-update-modipuram-depot-and-metro-station-construction-gains-momentum-on-namo-bharat-corridor/|work=RailAnalysis|date=3 July 2025|access-date=7 March 2026}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Future ==&lt;br /&gt;
In view of rising in traffic due to growth in population, Meerut&amp;#039;s city expansion and heightened demand for Delhi, Modipuram Depot, along with all 13 stations of the metro, will have sufficient space to expand more to handle longer metro trains and greater number of passengers. This expansion will make the station aligned with other stations in the metro, thus enhancing connectivity between Delhi and Meerut even further in the next 10-20 years.&lt;br /&gt;
&lt;br /&gt;
== See also ==&lt;br /&gt;
&lt;br /&gt;
* [[Meerut Metro]]&lt;br /&gt;
* [[Delhi–Meerut Regional Rapid Transit System]]&lt;br /&gt;
* [[RapidX]]&lt;br /&gt;
* [[National Capital Region Transport Corporation]]&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
{{reflist}}&lt;br /&gt;
&lt;br /&gt;
== External links ==&lt;br /&gt;
&lt;br /&gt;
* [https://meerutmetro.in/modipuram-depot-meerut-metro-station Official Meerut Metro – Modipuram Depot metro station page]&lt;br /&gt;
* [https://ncrtc.in/project/delhi-ghaziabad-meerut/ NCRTC official Delhi–Meerut project page]&lt;br /&gt;
&lt;br /&gt;
[[Category:Railway stations in Uttar Pradesh]]&lt;/div&gt;</summary>
		<author><name>Hayat hospital</name></author>
	</entry>
</feed>