<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Mangalore%E2%80%93Hassan%E2%80%93Mysore_line</id>
	<title>Mangalore–Hassan–Mysore line - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Mangalore%E2%80%93Hassan%E2%80%93Mysore_line"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Mangalore%E2%80%93Hassan%E2%80%93Mysore_line&amp;action=history"/>
	<updated>2026-08-19T09:43:34Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Mangalore%E2%80%93Hassan%E2%80%93Mysore_line&amp;diff=158573&amp;oldid=prev</id>
		<title>imported&gt;Feroze Ahmad 2 at 16:21, 14 July 2021</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Mangalore%E2%80%93Hassan%E2%80%93Mysore_line&amp;diff=158573&amp;oldid=prev"/>
		<updated>2021-07-14T16:21:04Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Use dmy dates|date=December 2019}}&lt;br /&gt;
{{Use Indian English|date=December 2019}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| box_width        = 28em&lt;br /&gt;
| name             = Mangalore–Hassan–Mysore line&lt;br /&gt;
| color            = &lt;br /&gt;
| logo             =&lt;br /&gt;
| logo_width       =&lt;br /&gt;
| image            = Places in western ghat karntataka between subramanya and sakleshpur 14.jpg&lt;br /&gt;
| image_width      = &lt;br /&gt;
| caption          = A train crosses the [[Western Ghats]] in [[Karnataka]], between [[Subramanya, Karnataka|Subramanya]] and [[Sakleshpur]], in August 2011&lt;br /&gt;
| type             = &lt;br /&gt;
| system           = &lt;br /&gt;
| status           = Operational&lt;br /&gt;
| locale           = [[Karnataka]], India&lt;br /&gt;
| start            = {{stnlnk|Mangalore Central}}&lt;br /&gt;
| end              = {{stnlnk|Mysore Junction}}&lt;br /&gt;
| stations         =&lt;br /&gt;
| routes           =&lt;br /&gt;
| daily_ridership  =&lt;br /&gt;
| open             = {{Start date|1979|05|20|df=y}} (Mangalore–Hassan section) &amp;lt;br /&amp;gt; {{Start date|1918|01|03|df=y}} (Hassan–Mysore section)&lt;br /&gt;
| close            =&lt;br /&gt;
| owner = [[Indian Railways]]&lt;br /&gt;
| operator         = [[Southern Railway zone|Southern Railway]] and [[South Western Railway zone|South Western Railway]]&lt;br /&gt;
| character        =&lt;br /&gt;
| depot            =&lt;br /&gt;
| stock            = &lt;br /&gt;
| linelength       = &lt;br /&gt;
| tracklength      = {{convert|309|km|mi|0|abbr=on}}&lt;br /&gt;
| tracks           = 1&lt;br /&gt;
| gauge            = {{Track gauge|5ft6in|lk=on}} [[broad gauge]]&lt;br /&gt;
| old_gauge        = {{track gauge|1000mm}} [[Metre-gauge railway|Metre gauge]]&lt;br /&gt;
| minradius        =&lt;br /&gt;
| racksystem       =&lt;br /&gt;
| electrification  = No&lt;br /&gt;
| speed            = &lt;br /&gt;
| elevation        =&lt;br /&gt;
| website          =&lt;br /&gt;
| map              = {{Mangalore–Hassan–Mysore line}}&lt;br /&gt;
| map_state        = collapsed&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Mangalore–Hassan–Mysore line&amp;#039;&amp;#039;&amp;#039; is a railway route of both [[Southern Railway zone|Southern]] and [[South Western Railway zone]] of [[Indian Railways]]. This route plays an important role in rail transportation of [[Mysore division]] of [[Karnataka]] state.&lt;br /&gt;
&lt;br /&gt;
The corridor passes through the [[Western Ghats]] and the [[Mysore Plateau]], connecting the mainland to the coastal areas of Karnataka with a stretch of 309&amp;amp;nbsp;km with one reversal direction at {{stnlnk|Hassan Junction}}.&lt;br /&gt;
&lt;br /&gt;
It is divided into two sections: {{stnlnk|Mangalore Central}} — {{stnlnk|Hassan Junction}} and Hassan — {{stnlnk|Mysore Junction}}.&lt;br /&gt;
&lt;br /&gt;
== History ==&lt;br /&gt;
The main railway line from Hassan to Mangalore section was originally built as a [[Metre-gauge railway|metre-gauge line]] and was opened in small sections between 1976 and 1977, inaugurated finally on 20 May 1979 for passenger transportation. 17 years later it was closed for gauge conversion, on 20 September 1996.&amp;lt;ref&amp;gt;{{cite web |title=IR History: Part - V (1970–1995) |url=https://www.irfca.org/faq/faq-history5.html |website=Indian Railways Fan Club |access-date=6 January 2020}}&amp;lt;/ref&amp;gt; The ghat sub-section between [[Sakleshpur]] and {{stnlnk|Subrahmanya Road}} was considered a challenging section. The gauge conversion of this section was handed over to a [[Special Purpose Vehicle]] (SPV), formed for the task – the Hassan Mangalore Rail Development Company Limited (HMRDC). The company has the [[Government of Karnataka]] and the [[Ministry of Railways (India)|Railway Ministry]] as majority stakeholders, while [[Mangalore port]] trust and a couple of other bodies as minority stakeholders.&amp;lt;ref&amp;gt;{{cite web |title=Rail Budget 1953-54 |url=http://www.indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Previous%20Budget%20Speeches/1953-54.pdf |website=Indian Railways |format=PDF |access-date=6 January 2020}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The gauge conversion took a very long time and is marked in red-letters in the Indian Railways&amp;#039; history. Although the first section after the conversion was opened in January 1998, the rest of the works were done at very slow pace. The first sub-section to be opened was {{stnlnk|Hassan Junction}} – [[Sakleshpur]], a distance of about 42&amp;amp;nbsp;km. The next stretch to be inaugurated was between {{stnlnk|Mangalore Central}} and [[Kabaka Puttur]], a distance of about 44&amp;amp;nbsp;km, opened in December 2003. Another section of the line from {{stnlnk|Kabaka Puttur}} to {{stnlnk|Subrahmanya Road}}, 42&amp;amp;nbsp;km, was opened in July 2005. The remaining final stretch (Sakleshpur–Subrahmanya), a ghat section with 1 in 55 grades all along, was opened in May 2006 for freight services and in December 2007 for passenger operations.&lt;br /&gt;
&lt;br /&gt;
As per the Railway Budget 1995–96, the Hassan–Mysore section was also proposed to gauge conversion to 5ft 6in [[broad gauge]].&amp;lt;ref&amp;gt;{{cite web |title=Rail Budget 1953-54 |url=http://www.indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Previous%20Budget%20Speeches/1995-96.pdf |website=Indian Railways |format=PDF |access-date=6 January 2020}}&amp;lt;/ref&amp;gt; Before that, the Hassan–Mysore section was also opened on 3 January 1918 as a [[Metre-gauge railway|metre-gauge line]].&amp;lt;ref&amp;gt;{{cite web |title=Bombay Baroda and Central Railway Doc |url=https://ia803003.us.archive.org/18/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf |website=US Digital Archive |format=PDF |access-date=14 July 2021}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Projects ==&lt;br /&gt;
There is a proposal for doubling the Mangalore–Hassan–Mysore line with electrification for reduction of time travelling between the coastal and plateau regions of Karnataka which will be a boon for the economy on this route.&amp;lt;ref&amp;gt;{{cite web |title=Pink Book 2018-19 |url=http://www.indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Budget_2018-19/IFF_2018-19/SWR_Integrated%20Financial%20Figures%202018-19.pdf |website=Indian Railways (South Western Railway) |format=PDF |access-date=6 January 2020}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news | url=https://timesofindia.indiatimes.com/city/mysuru/proposal-for-electrification-of-mysuru-hassan-mangaluru-line-in-union-budget-2018/articleshow/62875916.cms | title=Proposal for electrification of Mysuru-Hassan-Mangaluru line in Union Budget 2018 | location=Mysuru | newspaper=The [[Times of India]] | date=18 February 2018 | access-date=10 December 2019 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
&amp;lt;references /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
{{Railways in Southern India}}&lt;br /&gt;
&lt;br /&gt;
{{DEFAULTSORT:Mangalore-Hassan-Mysore line}}&lt;br /&gt;
[[Category:5 ft 6 in gauge railways in India]]&lt;br /&gt;
[[Category:Rail transport in Karnataka]]&lt;br /&gt;
[[Category:Transport in Mangalore]]&lt;br /&gt;
[[Category:Transport in Hassan district]]&lt;br /&gt;
[[Category:Transport in Mysore]]&lt;/div&gt;</summary>
		<author><name>imported&gt;Feroze Ahmad 2</name></author>
	</entry>
</feed>