<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Line_1_%28Navi_Mumbai_Metro%29</id>
	<title>Line 1 (Navi Mumbai Metro) - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Line_1_%28Navi_Mumbai_Metro%29"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Line_1_(Navi_Mumbai_Metro)&amp;action=history"/>
	<updated>2026-08-18T15:15:58Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Line_1_(Navi_Mumbai_Metro)&amp;diff=132761&amp;oldid=prev</id>
		<title>&gt;GareebArtist: Updated about recent trial run test, Depot and planned opening dates of metro line.</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Line_1_(Navi_Mumbai_Metro)&amp;diff=132761&amp;oldid=prev"/>
		<updated>2021-05-23T22:50:42Z</updated>

		<summary type="html">&lt;p&gt;Updated about recent trial run test, Depot and planned opening dates of metro line.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Use Indian English|date=September 2013}}&lt;br /&gt;
{{Use dmy dates|date=September 2013}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| name                            = Navi Mumbai Metro Line 1&lt;br /&gt;
| image                           = &lt;br /&gt;
| image_width                     = &lt;br /&gt;
| caption                         = &lt;br /&gt;
| type                            = [[Rapid Transit]]&lt;br /&gt;
| system                          = [[Navi Mumbai Metro]]&lt;br /&gt;
| status                          = Under construction&lt;br /&gt;
| locale                          = [[Navi Mumbai]], [[Maharashtra]], [[India]]&lt;br /&gt;
| start                           = Belapur&lt;br /&gt;
| end                             = Khandeshwar&lt;br /&gt;
| stations                        = 20&lt;br /&gt;
| daily_ridership                 = &lt;br /&gt;
| open                            = Dec 2021 (Planned for Central Park to Pendhar stations)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Dec 2022 (Planned for Belapur to Kharghar sector 14 stations)&amp;lt;ref&amp;gt;{{cite web |title=The Navi Mumbai metro to be operational by Dec 2021: CIDCO |url=https://www.metrorailnews.in/the-navi-mumbai-metro-to-be-operational-by-dec-2021-cidco/ |website=Metro Rail News |date=2021-03-02}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
| close                           = &lt;br /&gt;
| owner                           = [[CIDCO]]&lt;br /&gt;
| operator                        = &lt;br /&gt;
| character                       = Elevated&lt;br /&gt;
| depot                           = Taloja Metro Depot&lt;br /&gt;
| stock                           = [[CRRC|China Railway Rolling Stock Corporation (CRRC)]] [[CRRC Zhuzhou Locomotive|Zhuzhou Locomotive]]&amp;lt;ref&amp;gt;{{cite web |last1=News |first1=Urban Transport |title=Navi Mumbai Metro receives two 3-coach metro trains |url=https://urbantransportnews.com/navi-mumbai-metro-receives-two-3-coach-metro-trains/ |website=Urban Transport News |accessdate=14 March 2019 |date=12 March 2019}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
| minradius                       = &lt;br /&gt;
| linelength_km                   = 23.4&lt;br /&gt;
| tracklength_km                  = &lt;br /&gt;
| gauge                           = {{RailGauge|1435mm}} [[standard gauge]]&lt;br /&gt;
| electrification                 = 25 kV, 50 Hz [[alternating current|AC]]  [[Overhead catenary]]&amp;lt;ref name=&amp;quot;cidco.maharashtra.gov.in&amp;quot;&amp;gt;[http://www.cidco.maharashtra.gov.in/NMM_Stage_3.aspx CIDCO :: Stage-3 Page&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt;&lt;br /&gt;
| speed                           = 32 km/h&amp;lt;ref&amp;gt;[http://www.cidco.maharashtra.gov.in/NMM_Technical_Parameters.aspx CIDCO :: Technical_Parameters Page&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt;&lt;br /&gt;
| elevation                       = &lt;br /&gt;
| map                             = [[File:Navi Mumbai Metro Map.svg|300px]]&lt;br /&gt;
| map_state                       = &lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Line 1&amp;#039;&amp;#039;&amp;#039; of the [[Navi Mumbai Metro]] is part of the rapid transit rail system for the city of Navi Mumbai, India. The 23.40&amp;amp;nbsp;km line consists of 20 metro stations from Belapur to Khandeshwar. It is expected to cost {{INRConvert|4163|c}}. On 7th May 2021, State-run town planning authority [[City and Industrial Development Corporation|CIDCO]] conducted a successful trial run on the approach route to and the test track at Taloja metro depot, and claimed that it was “successful in all respects”.&amp;lt;ref&amp;gt;{{Cite web|last=May 8|first=B. B. Nayak / TNN /|last2=2021|last3=Ist|first3=01:36|title=Navi Mumbai Metro trial run successful {{!}} Mumbai News - Times of India|url=https://timesofindia.indiatimes.com/city/mumbai/navi-mumbai-metro-trial-run-successful/articleshow/82469519.cms|access-date=2021-05-23|website=The Times of India|language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==History==&lt;br /&gt;
The following dates represent the dates the section opened to the public, not the private inauguration.&lt;br /&gt;
{|class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align: center;&amp;quot; &lt;br /&gt;
|- &lt;br /&gt;
! colspan=&amp;quot;5&amp;quot; | &amp;lt;span style=&amp;quot;color:BLACK;&amp;quot;&amp;gt;&amp;#039;&amp;#039;&amp;#039;History&amp;#039;&amp;#039;&amp;#039;&amp;lt;/span&amp;gt;  &lt;br /&gt;
|-&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Extension date&lt;br /&gt;
! width=&amp;quot;5%&amp;quot;  colspan=&amp;quot;2&amp;quot;|Termini&lt;br /&gt;
! width=&amp;quot;10%&amp;quot; |Length&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Stations&lt;br /&gt;
|-&lt;br /&gt;
| &amp;#039;&amp;#039;April 2020&amp;#039;&amp;#039;||Belapur||Pendhar||{{convert|11.10|km|mi|sp=us}} || 11&lt;br /&gt;
|-&lt;br /&gt;
|  ||Pendhar||MIDC Taloja||{{convert|2|km|mi|sp=us}} || 1&lt;br /&gt;
|-&lt;br /&gt;
|  ||MIDC Taloja||Khandeshwar||{{convert|10.30|km|mi|sp=us}} || 8&lt;br /&gt;
|-&lt;br /&gt;
!Total||Belapur||Khandeshwar||{{convert|23.40|km|mi|sp=us}}|| 20&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
===Background===&lt;br /&gt;
The feasibility study for the Navi Mumbai Metro was carried out by the [[Delhi Metro Rail Corporation]] (DMRC). CIDCO was authorised as the implementing agency of the Belapur-Pendhar-Kalamboli-Khandeshwar line, under the &amp;#039;&amp;#039;Indian Tramway Act 1886&amp;#039;&amp;#039;, by the [[Government of Maharashtra]] on 30 September 2010.&amp;lt;ref name=&amp;quot;ReferenceA&amp;quot;&amp;gt;[http://www.cidco.maharashtra.gov.in/NMM_Introduction.aspx CIDCO :: Introduction Page&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;MasterPlan2012&amp;quot;&amp;gt;[http://www.dnaindia.com/india/report_cidco-takes-navi-mumbai-metro-plan-ahead_1667823 &amp;quot;Cidco takes Navi Mumbai metro plan ahead&amp;quot;]. DNA India. 27 Mar 2012. Retrieved 5 April 2012.&amp;lt;/ref&amp;gt; The state government later asked the CIDCO to implement the Navi Mumbai Metro project under the Central Metro Act.&amp;lt;ref name=&amp;quot;dnaindia.com&amp;quot;&amp;gt;[http://www.dnaindia.com/mumbai/1881449/report-next-metro-only-by-2016 Next metro only by 2016 | Latest News &amp;amp; Updates at Daily News &amp;amp; Analysis&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt; The detailed master plan for Line 1 was prepared by the DMRC. The proposed route will link Belapur, Kharghar, Taloje, MIDC, Kalamboli and the Khandeshwar railway station, terminating at the proposed [[Navi Mumbai International Airport]].&amp;lt;ref name=&amp;quot;worldsnap1&amp;quot;&amp;gt;{{cite web|url=http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |title=Neither objections nor any suggestions for metro project &amp;amp;#124; Mumbai, World Snap |publisher=Worldsnap.com |year=2010 |accessdate=31 August 2010 |url-status=dead |archiveurl=https://web.archive.org/web/20100714091048/http://www.worldsnap.com/news/city/mumbai/neither-objections-nor-any-suggestions-for-metro-project-74978.html |archivedate=14 July 2010 }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Construction===&lt;br /&gt;
The metro&amp;#039;s foundation stone was laid on 1 May 2011 by Chief Minister [[Prithviraj Chavan]], and general foundation work on the system&amp;#039;s first phase commenced in October 2011.&amp;lt;ref name=BeginsEco&amp;gt;[http://articles.economictimes.indiatimes.com/2011-10-28/news/30332811_1_first-phase-navi-mumbai-metro-rail-pendhar &amp;quot;Work on first phase of Navi Mumbai Metro Rail begins&amp;quot;]. &amp;#039;&amp;#039;The Economic Times&amp;#039;&amp;#039;. 28 October 2011. Retrieved 30 October 2011.&amp;lt;/ref&amp;gt; Line 1&amp;#039;s first girder was placed on 13 December 2012.&amp;lt;ref&amp;gt;[https://web.archive.org/web/20130719142505/http://articles.timesofindia.indiatimes.com/2012-12-13/mumbai/35795832_1_navi-mumbai-metro-belapur-and-pendhar-metro-rail-project &amp;quot;Boost for Navi Mumbai Metro&amp;quot;]. &amp;#039;&amp;#039;Times of India&amp;#039;&amp;#039;. 13 December 2012. Retrieved 21 December 2012.&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;[http://www.indianexpress.com/news/cidco-places-first-girder/1044497/ &amp;quot;CIDCO places first girder&amp;quot;]. &amp;#039;&amp;#039;Indian Express&amp;#039;&amp;#039;. 13 December 2012. Retrieved 21 December 2012.&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Line 1 is planned to be developed in 3 phases.&amp;lt;ref name=&amp;quot;ReferenceA&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
{|class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align: center;&amp;quot; &lt;br /&gt;
|- &lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Phase&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Termini&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Length&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Stations&lt;br /&gt;
! width=&amp;quot;5%&amp;quot; |Cost&lt;br /&gt;
|-&lt;br /&gt;
| Phase I ||Belapur-Kharghar-Taloja-Pendhar||{{convert|11.10|km|mi}}|| 11 || {{INRConvert|1985|c}}&lt;br /&gt;
|-&lt;br /&gt;
| Phase II ||MIDC Taloja-Kalamboli–Khandeshwar (extension to Airport proposed)||{{convert|10.30|km|mi}}|| 8 || {{INRConvert|1509|c}}&lt;br /&gt;
|-&lt;br /&gt;
| Phase III ||Interlink between Pendhar and MIDC||{{convert|2|km|mi}}|| 1 || {{INRConvert|574|c}}&lt;br /&gt;
|- &lt;br /&gt;
! Total || || {{convert|23.40|km|mi}} || 20 || {{INRConvert|4068|c}}&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
CIDCO awarded the contract for civil works in Phase I to six firms. The contract for technical work was awarded to one firm, at an estimated cost of {{INRConvert|1020|c}}.&amp;lt;ref name=&amp;quot;dnaindia.com&amp;quot;/&amp;gt; Spanish contractor San José Constructora will design and build five stations, located at Central Park, Pethpada, Sector 34, Panchanand and Pendhar.&amp;lt;ref&amp;gt;[http://www.railwaygazette.com/nc/news/single-view/view/navi-mumbai-metro-tendering/archiv/2012/06.html &amp;quot;Navi Mumbai metro tendering&amp;quot;].&amp;#039;&amp;#039;Railway Gazette&amp;#039;&amp;#039;. 26 June 2012. Retrieved 15 July 2012.&amp;lt;/ref&amp;gt; In the second phase, an {{convert|8.15|km|mi|adj=on}} line will be built from Khandeshwar to Taloje MIDC, with seven stations. The third phase will entail the merging of two rail corridors between Pendhar and MIDC with a {{convert|2.2|km|mi|adj=on}} link, forming a loop from Belapur to Khandeshwar.&amp;lt;ref&amp;gt;[https://web.archive.org/web/20071016091022/http://cidcoindia.com/cidco/nmtransit.aspx &amp;quot;Railway projects&amp;quot;]. Cidco. Retrieved 5 April 2012.&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news| url=http://articles.economictimes.indiatimes.com/2011-10-28/news/30332811_1_first-phase-navi-mumbai-metro-rail-pendhar | work=Times of India | title=Work on first phase of Navi Mumbai Metro Rail begins | date=28 October 2011}}&amp;lt;/ref&amp;gt; A maintenance depot will be constructed on a {{convert|20|acre|m2|adj=on}} plot at Taloja for the circular line, and a temporary maintenance depot will be constructed on five hectares of land at Khandeshwar.&amp;lt;ref name=&amp;quot;worldsnap1&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Line 1 was expected to be completed by 2016 but its most likely to miss deadline, trains may roll out only by July 2017.&amp;lt;ref&amp;gt;[http://timesofindia.indiatimes.com/city/navi-mumbai/Metro-likely-to-miss-deadline-again-trains-may-roll-out-only-by-July-2017/articleshow/51171768.cms Metro likely to miss deadline again, trains may roll out only by July 2017 - Times of India&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt; CIDCO has plans to extend Line 1 up to [[Kalyan]] - [[Ulhasnagar]] -[[Murbad]].&amp;lt;ref&amp;gt;{{Cite web|url=https://timesofindia.indiatimes.com/city/navi-mumbai/survey-soon-to-extend-metro-rail-to-kalyan/articleshow/22608899.cms|title=Survey soon to extend Metro rail to Kalyan &amp;amp;#124; Navi Mumbai News - Times of India|website=The Times of India}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Funding==&lt;br /&gt;
Phase I of Line 1 was executed using CIDCO funds. The total cost of Line 1 is estimated to be {{INRConvert|4068|c}}.&amp;lt;ref name=&amp;quot;ReferenceA&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Stations==&lt;br /&gt;
&lt;br /&gt;
===Stage 1===&lt;br /&gt;
{{Navi Mumbai Metro Line 1|align=left|state=expanded}}&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot;  style=&amp;quot;text-align:center; width:65%;&amp;quot;&lt;br /&gt;
|-&lt;br /&gt;
! style=&amp;quot;text-align:center;&amp;quot; colspan=&amp;quot;6&amp;quot;| &amp;#039;&amp;#039;&amp;#039;Line 1&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
! #&lt;br /&gt;
! Station Name&amp;lt;ref&amp;gt;[http://www.cidco.maharashtra.gov.in/NMM_Stage_1.aspx CIDCO :: Stage-1 Page&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt;&lt;br /&gt;
! Inter-station Distance (km)&lt;br /&gt;
! Cumulative Distance (km)&lt;br /&gt;
! Opening&lt;br /&gt;
! Connections&lt;br /&gt;
|-&lt;br /&gt;
|1|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|CBD Belapur}}|| 0.06 || 0.06 ||  || [[CBD Belapur railway station]] ([[Mumbai Suburban Railway]])&lt;br /&gt;
|-&lt;br /&gt;
|2|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 7 (CBD Belapur)}}|| 0.71 || 0.77 ||  || None&lt;br /&gt;
|-&lt;br /&gt;
|3|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|CIDCO Science Park (Kharghar)}}|| 1.27 || 2.04 ||  ||None&lt;br /&gt;
|-&lt;br /&gt;
|4|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Utsav Chowk (Kharghar)}} || 1.37  || 3.41 ||  || [[Kharghar railway station]] ([[Mumbai Suburban Railway]]) (through Skywalk)&lt;br /&gt;
|-&lt;br /&gt;
|5|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 11 (Kharghar)}}||0.71|| 4.12 || || None&lt;br /&gt;
|-&lt;br /&gt;
|6|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 14 (Kharghar)}}|| 1 || 5.12 || || None&lt;br /&gt;
|-&lt;br /&gt;
|7|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Central Park (Kharghar)}}|| 1 || 6.12 || || None&lt;br /&gt;
|-&lt;br /&gt;
|8|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Pethpada (Kharghar)}}|| 1.32 || 7.44 || || None&lt;br /&gt;
|-&lt;br /&gt;
|9|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 34 (Kharghar)}}|| 1.23 || 8.67 || || None&lt;br /&gt;
|-&lt;br /&gt;
|10|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Panchanand}}|| 1.48 || 10.67 || || Suburban Railway&amp;lt;br&amp;gt;[[Line 12 (Mumbai Metro)|Orange Line 12 (Mumbai Metro)]]&lt;br /&gt;
|-&lt;br /&gt;
|11|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Pendhar}} || 0.95 || 11.10 || || None&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
===Stage 2===&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot;  style=&amp;quot;text-align:center; width:65%;&amp;quot;&lt;br /&gt;
|-&lt;br /&gt;
! style=&amp;quot;text-align:center;&amp;quot; colspan=&amp;quot;6&amp;quot;| &amp;#039;&amp;#039;&amp;#039;Line 1&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
! #&lt;br /&gt;
! Station Name&amp;lt;ref&amp;gt;[http://www.cidco.maharashtra.gov.in/NMM_Stage_2.aspx CIDCO :: Stage-2 Page&amp;lt;!-- Bot generated title --&amp;gt;]&amp;lt;/ref&amp;gt;&lt;br /&gt;
! Inter-station Distance (km)&lt;br /&gt;
! Cumulative Distance (km)&lt;br /&gt;
! Opening&lt;br /&gt;
! Connections&lt;br /&gt;
|-&lt;br /&gt;
|12|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Khandeshwar}}|| 0.10 || 0.10 || || [[Khandeshwar railway station]] ([[Mumbai Suburban Railway]])&lt;br /&gt;
|-&lt;br /&gt;
|13|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 10 (Kamothe)}}|| 0.99 || 1.09 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|14|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 2E (Kalamboli)}}|| 1.01 || 2.10 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|15|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 13 (Kalamboli)}}|| 0.77 || 2.87 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|16|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Sector 7E (Kalamboli)}}|| 1.63 || 4.50 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|17|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|Kasadi}}|| 1.15 || 5.65 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|18|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|MIDC Station 1}}|| 1.20 || 6.85 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|19|| style=&amp;quot;text-align:center;&amp;quot;|{{metro|MIDC Station 2}}|| 1.50 || 8.35 || ||None&lt;br /&gt;
|-&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
===Stage 3===&lt;br /&gt;
Stage 3 involves the construction of a 2&amp;amp;nbsp;km link and one station between Pendhar and MIDC, to join Stage 1 and Stage 2.&amp;lt;ref name=&amp;quot;cidco.maharashtra.gov.in&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Infrastructure==&lt;br /&gt;
An international consortium of companies including [[Ansaldo STS]], [[Tata Group|Tata Projects]] and CSR Zhuzhou will provide the electrical and mechanical systems for the first phase of  Line 1. Ansaldo will conduct systems integration and supply train control systems, telecoms, fare collection systems and equipment storage.&amp;lt;ref name=GazetteR/&amp;gt; The metro&amp;#039;s standard gauge network would be electrified at 25 kV [[alternating current|AC]], with power provided via an [[overhead catenary]].&amp;lt;ref name=GazetteR/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Rolling stock===&lt;br /&gt;
In 2014, the Chinese company [[CRRC Zhuzhou Locomotive|CSR Zhuzhou]] signed a contract with CIDCO to supply rolling stock for the first phase of the metro’s Line 1.&amp;lt;ref name=GazetteR/&amp;gt; The three-car trainsets would be {{convert|64.6|m|ft}} long and {{convert|3.1|m|ft}} wide, with a passenger capacity of around 1,100 and a maximum speed of approximately {{convert|80|kph|mph}}.&amp;lt;ref name=MiddayTrains/&amp;gt; The trains would feature stainless steel bodies, air-conditioning and LED lighting.&amp;lt;ref name=MiddayTrains&amp;gt;{{cite news |url=http://www.mid-day.com/news/2012/feb/260212-CIDCO-opts-for-wider-metro-coaches.htm |title=CIDCO opts for wider metro coaches |newspaper=Mid-Day |publisher=Mid-Day Infomedia Ltd. |date=26 February 2012 |accessdate=5 April 2012}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=GazetteR&amp;gt;{{cite web|url=http://www.railwaygazette.com/news/news/asia/single-view/view/navi-mumbai-em-contract-awarded.html|title=Navi Mumbai metro E&amp;amp;M contract awarded|work=Railway Gazette|date=24 July 2014|accessdate=25 February 2015}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==References==&lt;br /&gt;
{{reflist|30em}}&lt;br /&gt;
&lt;br /&gt;
{{Navi Mumbai Metro navbox}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Rapid transit lines in India]]&lt;br /&gt;
[[Category:Transport in Navi Mumbai]]&lt;br /&gt;
[[Category:Navi Mumbai Metro lines]]&lt;/div&gt;</summary>