<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Kartavya_Bhavan</id>
	<title>Kartavya Bhavan - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Kartavya_Bhavan"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Kartavya_Bhavan&amp;action=history"/>
	<updated>2026-11-26T15:39:17Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Kartavya_Bhavan&amp;diff=508694&amp;oldid=prev</id>
		<title>AbrandaStudio: Stub!</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Kartavya_Bhavan&amp;diff=508694&amp;oldid=prev"/>
		<updated>2026-03-21T23:37:42Z</updated>

		<summary type="html">&lt;p&gt;Stub!&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Infobox building&lt;br /&gt;
| name                = Kartavya Bhavan&lt;br /&gt;
| native_name         = कर्तव्य भवन&lt;br /&gt;
| image               = Kartavya_Bhavan,_New_Delhi_,_India.jpg&lt;br /&gt;
| caption             = Kartavya Bhavan-3, the first building of the Common Central Secretariat (CCS), located on [[Kartavya Path]], [[New Delhi]]&lt;br /&gt;
| pushpin_map         = India Delhi&lt;br /&gt;
| map_caption         = Location in New Delhi, India&lt;br /&gt;
| location            = [[Kartavya Path]], [[New Delhi]], [[India]]&lt;br /&gt;
| coordinates         = {{coord|28.6142|N|77.2080|E|display=inline,title}}&lt;br /&gt;
| status              = KB-3 inaugurated on 6 August 2025&lt;br /&gt;
| current_tenants     = [[List of ministries and departments of the Government of India|Various Union ministries]]&lt;br /&gt;
| construction_start_date = 2020&lt;br /&gt;
| completion_date     = 2026&lt;br /&gt;
| owner               = [[Government of India]]&lt;br /&gt;
| cost                = {{INRConvert|3690|c}} (KB-1,2,3)&lt;br /&gt;
| floor_count         = 7 (plus 2 basements)&lt;br /&gt;
| floor_area          = 150,000 m² (~1.5 lakh square metres)&lt;br /&gt;
| architect           = [[Central Public Works Department]] (CPWD)&lt;br /&gt;
| architecture_firm   = HCP Design, Planning and Management Pvt. Ltd.&lt;br /&gt;
| main_contractor     = [[Shapoorji Pallonji Group]]&lt;br /&gt;
| developer           = [[Ministry of Housing and Urban Affairs]]&lt;br /&gt;
| architectural_style = Modern sustainable governance architecture&lt;br /&gt;
| website             = &lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Kartavya Bhavan&amp;#039;&amp;#039;&amp;#039;,&amp;lt;ref&amp;gt;{{cite news |title=All 10 new Central Secretariat buildings likely to be completed in 2027, says govt |url=https://indianexpress.com/article/india/all-10-new-central-secretariat-buildings-likely-to-be-completed-in-2027-says-govt-10172196/ |access-date=16 August 2025 |work=The Indian Express |date=6 August 2025 |language=en}}&amp;lt;/ref&amp;gt; also referred to as the &amp;#039;&amp;#039;&amp;#039;Common Central Secretariat&amp;#039;&amp;#039;&amp;#039; (CCS), is a complex of ten newly-constructed office buildings in New Delhi, India, developed under the [[Central Vista Redevelopment Project]]. Intended for usage by the various ministries of the [[Government of India]], the project aims to replace older structures, such as [[Shastri Bhawan]], Nirman Bhawan, and Krishi Bhawan, with a contemporaneous, centralised administrative complex.&amp;lt;ref name=firstpost&amp;gt;{{cite web |title=Key features of Kartavya Bhavan |url=https://www.firstpost.com/explainers/kartavya-bhavan-pm-modi-inauguration-ccs-13920443.html |website=Firstpost |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Development ==&lt;br /&gt;
Since India&amp;#039;s independence, key ministries such as Home, Finance, Defence, External Affairs, and the Prime Minister’s Office have been housed in the [[Secretariat Building, New Delhi|North and South Block buildings]], while others have occupied offices in structures like Krishi Bhawan, Shastri Bhawan, and Nirman Bhawan. Some departments have also operated from rented premises, reportedly costing the government approximately ₹1,500 crore (US$180 million) annually in rent.&amp;lt;ref&amp;gt;{{cite news |title=Centre spent Rs 1,500 crore on ministry rent, not anymore: PM at Kartavya Bhavan |url=https://www.indiatoday.in/india/story/government-was-spending-rs-1500-crore-on-rent-for-ministries-says-pm-from-newly-unveiled-kartavya-bhavan-2767340-2025-08-06 |access-date=15 August 2025 |work=India Today |date=6 August 2025 |language=en}}&amp;lt;/ref&amp;gt; The Central Vista Redevelopment Project was initiated in part to consolidate these ministries into a single complex, with the aim of improving coordination and reducing operational costs.&amp;lt;ref&amp;gt;{{cite news |title=CENTRAL VISTA PROJECT Smarter Administration, Seamless Governance, Stronger India |url=https://www.pib.gov.in/PressNoteDetails.aspx?id=154974&amp;amp;NoteId=154974&amp;amp;ModuleId=3#:~:text=Need%20For%20Redevelopment,administrative%20core%20for%20the%20nation. |access-date=15 August 2025 |work=PIB |date=5 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The Central Vista Redevelopment Project, launched in 2019, includes plans to construct ten new buildings to house various central government ministries. According to official statements, the project aims to replace older government buildings that are reportedly facing issues such as insufficient space and aging infrastructure.&amp;lt;ref name=livemint&amp;gt;{{cite web |title=5 key things to know about Kartavya Bhavan that PM Narendra Modi will inaugurate today |url=https://www.livemint.com/news/india/5-key-things-to-know-about-kartavya-bhavan-that-pm-narendra-modi-will-inaugurate-today-11754458505637.html |website=LiveMint |access-date=15 August 2025}}&amp;lt;/ref&amp;gt; &lt;br /&gt;
&lt;br /&gt;
Kartavya Bhavan-3, the first of these ten, was completed and inaugurated on 6 August 2025.&amp;lt;ref name=indiatoday&amp;gt;{{cite web |title=PM Modi inaugurates Kartavya Bhavan, spread over 1.5 lakh sq metres; it will house key ministries |url=https://www.indiatoday.in/india/story/pm-modi-inaugurates-kartavya-bhavan-spread-over-15-lakh-sq-metres-it-will-house-key-ministries-2767064-2025-08-06 |website=India Today |access-date=15 August 2025}}&amp;lt;/ref&amp;gt; The full CCS campus is forecasted to be operational by mid-2027.&amp;lt;ref name=toi-camp&amp;gt;{{cite web |title=Kartavya Path enters final stretch; key buildings including PM’s residence to be completed by mid-2027 |url=https://timesofindia.indiatimes.com/city/delhi/kartavya-path-enters-final-stretch-key-buildings-including-pms-residence-to-be-completed-by-mid-2027-no-demolition-for-museum-bhavans/articleshow/123136804.cms |website=The Times of India |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Architecture ==&lt;br /&gt;
The building was designed by HCP Design, Planning and Management Pvt. Ltd., the same firm behind the overall Central Vista master plan.&amp;lt;ref&amp;gt;{{cite news |title=Kartavya Bhavan blends tradition and modernity |url=https://timesofindia.indiatimes.com/india/part-of-central-vista-project-kartavya-bhawan-inaugurated-key-things-to-know-about-the-high-tech-building/articleshow/123137248.cms |newspaper=Times of India |date=16 August 2025}}&amp;lt;/ref&amp;gt; The structure incorporates elements of Lutyens&amp;#039; architectural style, such as colonnaded facades and symmetrical layouts, while integrating modern sustainability features like solar panels, rainwater harvesting, and energy-efficient HVAC systems.&lt;br /&gt;
&lt;br /&gt;
The seven-storey structure, with two subterranean levels, spans approximately {{cvt|150,000|m2|ft2|abbr=on}}.&amp;lt;ref name=firstpost/&amp;gt; The design includes features intended to improve energy efficiency and reduce environmental impact. Key elements include:&amp;lt;ref&amp;gt;{{cite news |title=What is Kartavya Bhavan in Delhi? 5 things about swanky new address for central ministries |url=https://www.hindustantimes.com/india-news/what-is-kartavya-bhavan-in-delhi-5-things-about-swanky-new-address-for-central-ministries-101754464644835.html |access-date=15 August 2025 |work=Hindustan Times |date=6 August 2025 |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
* Double-glazed facade and noise-insulating glass.&lt;br /&gt;
* Energy-saving LED lights, sensor-based and smart HVAC systems, reducing consumption by ~30%.&amp;lt;ref name=livemint/&amp;gt;&lt;br /&gt;
* Rooftop solar panels (366 kWp + 200 kW) generating over 534,000 kWh annually.&amp;lt;ref name=ddindia&amp;gt;{{cite web |title=PM Modi inaugurates Kartavya Bhavan in New Delhi |url=https://ddindia.co.in/2025/08/pm-modi-inaugurates-kartavya-bhavan-in-new-delhi/ |website=DD India |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
* Aiming for GRIHA-4 green rating.&amp;lt;ref name=livemint/&amp;gt;&lt;br /&gt;
* Zero-discharge wastewater management (1.1 million L/day recycled), rainwater harvesting, and composting (~1,000 kg/day).&amp;lt;ref name=businessstd&amp;gt;{{cite web |title=PM Modi inaugurates Kartavya Bhavan, new secretariat under Central Vista |url=https://www.business-standard.com/india-news/modi-inaugurates-kartavya-bhavan-new-secretariat-under-central-vista-125080700588_1.html |website=Business Standard |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
* Recycled materials, EV charging infrastructure, smart elevators, and motion-sensor lighting.&amp;lt;ref name=jagranjosh&amp;gt;{{cite web |title=Kartavya Bhavan: location, significance, and key features |url=https://www.jagranjosh.com/general-knowledge/kartavya-bhavan-check-its-location-significance-and-key-features-1820001317-1 |website=Jagran Josh |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Facilities===&lt;br /&gt;
Each of the buildings includes 24 large conference rooms, 26 small ones, and 67 compact team-meeting spaces, along with facilities such as a crèche, yoga room, medical center, café, multipurpose hall, and parking for about 600 cars.&amp;lt;ref name=livemint/&amp;gt; Entry is controlled via smart ID cards, biometric systems, and a centralized surveillance control centre.&amp;lt;ref name=ndtvprofit&amp;gt;{{cite web |title=PM Modi to inaugurate Kartavya Bhavan on Aug 6 |url=https://www.ndtvprofit.com/nation/pm-modi-to-inaugurate-kartavya-bhavan-on-aug-6-central-secretariat-building-to-house-these-ministries |website=NDTV Profit |access-date=15 August 2025}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Buildings and ministries ==&lt;br /&gt;
[[File:Prime Minister of Bharat, Shri Narendra Damodardas Modi during the inauguration of Kartavya Bhavan 3.jpg|thumb|Prime Minister Modi during the inauguration of Kartavya Bhavan 3]]&lt;br /&gt;
A total of ten Common Central Secretariat buildings will be built along the [[Kartavya Path]] to house all the ministries and important departments. Some old ministerial buildings like Krishi Bhawan, Nirman Bhawan, [[Shastri Bhawan]], Udyog Bhawan, and [[Vigyan Bhavan]] will be demolished to make way for these new buildings.&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Kartavya Bhavan-3&amp;#039;&amp;#039;&amp;#039;, the first among the ten buildings, was inaugurated on 5 August 2025. &amp;#039;&amp;#039;&amp;#039;Kartavya Bhavan 1&amp;#039;&amp;#039;&amp;#039; and &amp;#039;&amp;#039;&amp;#039;2&amp;#039;&amp;#039;&amp;#039;, along with &amp;#039;&amp;#039;&amp;#039;Seva Teerth&amp;#039;&amp;#039;&amp;#039; were inaugurated on 13 February 2026.&amp;lt;ref&amp;gt;{{cite news |title=Seva Teerth, Kartavya Bhawan are important milestone in India&amp;#039;s journey towards Viksit Bharat: PM Modi {{!}} Today News |url=https://www.livemint.com/news/india/seva-teerth-kartavya-bhawan-are-important-milestone-in-indias-journey-towards-viksit-bharat-pm-modi-11770991690031.html |access-date=15 February 2026 |work=mint |date=13 February 2026 |language=en}}&amp;lt;/ref&amp;gt; While the rest of the buildings are expected to be completed by June 2027.&amp;lt;ref&amp;gt;{{cite news |title=Central Vista Project: All 10 Common Central Secretariat Buildings to Be Completed in 22 Months |url=https://www.deccanherald.com/india/all-ten-buildings-of-common-central-secretariat-to-be-constructed-in-22-months-says-centre-3667090 |access-date=15 August 2025 |work=Deccan Herald |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
{| class=&amp;quot;wikitable&amp;quot; style=&amp;quot;text-align:center; width:100%; border:2px solid black; border-collapse:collapse;&amp;quot;&lt;br /&gt;
|+ &amp;#039;&amp;#039;&amp;#039;Housing of the Secretariat Building&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|-&lt;br /&gt;
! style=&amp;quot;background-color:#f2f2f2; width:33%;&amp;quot; | Kartavya Bhavan 1&lt;br /&gt;
! colspan=&amp;quot;2&amp;quot; style=&amp;quot;background-color:#f2f2f2; width:33%;&amp;quot; | Kartavya Bhavan 2&lt;br /&gt;
! colspan=&amp;quot;2&amp;quot; style=&amp;quot;background-color:#f2f2f2; width:34%;&amp;quot; | Kartavya Bhavan 3&lt;br /&gt;
|-&lt;br /&gt;
| [[Ministry of Finance (India)|Finance]] &amp;lt;br&amp;gt;&lt;br /&gt;
| colspan=&amp;quot;2&amp;quot; | [[Ministry of Defence (India)|Defence]] &amp;lt;br&amp;gt; 5th–6th floor&lt;br /&gt;
| colspan=&amp;quot;2&amp;quot; | [[Ministry of Home Affairs (India)|Home Affairs]] &amp;lt;br&amp;gt; 4th–6th floor&lt;br /&gt;
|-&lt;br /&gt;
| &amp;amp;nbsp;&lt;br /&gt;
| [[Ministry of Agriculture and Farmers&amp;#039; Welfare|Agriculture and Farmers&amp;#039; Welfare]] &amp;lt;br&amp;gt; 3rd floor&lt;br /&gt;
| [[Ministry of Law and Justice (India)|Law and Justice]] &amp;lt;br&amp;gt; 3rd–4th floor&lt;br /&gt;
| [[Ministry of External Affairs (India)|External Affairs]] &amp;lt;br&amp;gt; 3rd floor&lt;br /&gt;
| [[Principal Scientific Adviser to the Government of India|Principal Scientific Adviser]] &amp;lt;br&amp;gt; 3rd floor&lt;br /&gt;
|-&lt;br /&gt;
| &amp;amp;nbsp;&lt;br /&gt;
| [[Ministry of Culture (India)|Culture]] &amp;lt;br&amp;gt; 2nd floor&lt;br /&gt;
| [[Ministry of Chemicals and Fertilizers|Chemicals and Fertilizers]] &amp;lt;br&amp;gt; 2nd floor&lt;br /&gt;
| [[Ministry of Rural Development (India)|Rural Development]] &amp;lt;br&amp;gt; 2nd floor&lt;br /&gt;
| [[Ministry of Micro, Small and Medium Enterprises|Micro, Small &amp;amp; Medium Enterprises]] &amp;lt;br&amp;gt; 2nd floor&lt;br /&gt;
|-&lt;br /&gt;
| &amp;amp;nbsp;&lt;br /&gt;
| [[Ministry of Information and Broadcasting (India)|Information and Broadcasting]] &amp;lt;br&amp;gt; 2nd–3rd floor&lt;br /&gt;
| [[Central Bureau of Investigation]] &amp;lt;br&amp;gt; Ground–1st floor&lt;br /&gt;
| [[Ministry of Personnel, Public Grievances and Pensions|Personnel &amp;amp; Training]] &amp;lt;br&amp;gt; UG–1st floor&lt;br /&gt;
| [[Ministry of Petroleum and Natural Gas|Petroleum and Natural Gas]] &amp;lt;br&amp;gt; Ground–1st floor&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
== Connectivity ==&lt;br /&gt;
Kartavya Bhavan is accessible via major arterial roads including &amp;#039;&amp;#039;Rafi Marg&amp;#039;&amp;#039;, &amp;#039;&amp;#039;Rajendra Prasad Road&amp;#039;&amp;#039;, &amp;#039;&amp;#039;[[Janpath]] Road&amp;#039;&amp;#039;, and &amp;#039;&amp;#039;Mann Singh Road&amp;#039;&amp;#039;, and is in close proximity to the [[Central Secretariat metro station]] on the [[Yellow Line (Delhi Metro)|Yellow Line]] and [[Violet Line (Delhi Metro)|Violet Line]] of [[Delhi Metro]].&lt;br /&gt;
&lt;br /&gt;
At the onset, a plan was proposed to install a loop-line of underground moving walkways connecting all buildings of the Common Central Secretariat. However, the proposal was eventually dropped. During the inauguration of Kartavya Bhavan-3, the government announced a new 7-kilometre extension of the Delhi Metro’s [[Magenta Line (Delhi Metro)|Magenta Line]], running from [[Indraprastha metro station]] to [[Ramakrishna Ashram Marg metro station|Ramakrishna Ashram Marg]]. The extension will include nine new stations at [[Bharat Mandapam]], [[Baroda House]], [[India Gate]], Kartavya Bhavan, [[Central Secretariat metro station|Central Secretariat]], Yuge Yugeen Bharat Museum, and [[Shivaji Stadium]].&amp;lt;ref&amp;gt;{{cite news |title=Metro to India Gate, T1, and Kalindi Kunj: Delhi to get 3 new metro corridors worth Rs 11,150 crore; cabinet nod likely to be soon |url=https://timesofindia.indiatimes.com/city/delhi/metro-to-india-gate-t1-and-kalindi-kunj-delhi-to-get-3-new-metro-corridors-worth-rs-11150-crore-cabinet-nod-likely-to-be-soon/articleshow/121720806.cms |access-date=16 August 2025 |work=The Times of India |date=9 June 2025}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news |title=Proposal for Metro to link Central Vista, North Block |url=https://www.hindustantimes.com/cities/delhi-news/proposal-for-metro-to-link-central-vista-north-block-101733853918920.html |access-date=16 August 2025 |work=Hindustan Times |date=10 December 2024 |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite news |title=Cabinet approves 3 new corridors for Delhi Metro, including one with connectivity to India Gate |url=https://indianexpress.com/article/india/cabinet-approves-3-corridors-delhi-metro-connectivity-india-gate-10436968/ |access-date=26 December 2025 |work=The Indian Express |date=25 December 2025 |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==See also==&lt;br /&gt;
* [[Kartavya Path]]&lt;br /&gt;
* [[Secretariat Building, New Delhi]]&lt;br /&gt;
* [[Rashtrapati Bhavan]]&lt;br /&gt;
* [[Prime Minister&amp;#039;s Office (India)]]&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
{{reflist}}&lt;br /&gt;
&lt;br /&gt;
== External links ==&lt;br /&gt;
* [https://centralvista.gov.in/ Official Central Vista Redevelopment Project Website]&lt;br /&gt;
* [https://cpwd.gov.in Central Public Works Department]&lt;br /&gt;
* [https://www.mohua.gov.in Ministry of Housing and Urban Affairs]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Administrative headquarters in India}}&lt;br /&gt;
{{Delhi landmarks|state=collapsed}}&lt;br /&gt;
{{Authority control}}&lt;br /&gt;
&lt;br /&gt;
[[Category:Government buildings in Delhi]]&lt;br /&gt;
[[Category:2025 establishments in Delhi]]&lt;br /&gt;
[[Category:Sandstone buildings in India]]&lt;br /&gt;
[[Category:Buildings and structures in New Delhi]]&lt;/div&gt;</summary>
		<author><name>AbrandaStudio</name></author>
	</entry>
</feed>