<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Jaynagar%E2%80%93Bardibas_railway_line</id>
	<title>Jaynagar–Bardibas railway line - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Jaynagar%E2%80%93Bardibas_railway_line"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Jaynagar%E2%80%93Bardibas_railway_line&amp;action=history"/>
	<updated>2026-11-06T23:54:39Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Jaynagar%E2%80%93Bardibas_railway_line&amp;diff=506003&amp;oldid=prev</id>
		<title>BarneyMoh54 at 09:08, 17 April 2026</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Jaynagar%E2%80%93Bardibas_railway_line&amp;diff=506003&amp;oldid=prev"/>
		<updated>2026-04-17T09:08:58Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|None}}&lt;br /&gt;
{{Use dmy dates|date=May 2023}}&lt;br /&gt;
{{Use Indian English|date=May 2023}}&lt;br /&gt;
{{Infobox rail line&lt;br /&gt;
| box_width                       = 350px&lt;br /&gt;
| name                            = Jaynagar–Janakpur–Kurtha-Bardibas railway&lt;br /&gt;
| image                           = Jaynagar-Bijalpura railway line.jpg&lt;br /&gt;
| image_width                     = 300&lt;br /&gt;
| image_alt                       = &lt;br /&gt;
| color                           = 003893&lt;br /&gt;
| color2                          = DC143C&lt;br /&gt;
| caption                         = &lt;br /&gt;
| other_name                      = Bardibas - Jayanagar line&lt;br /&gt;
| native_name                     = बर्दिबास जयनगर कुर्था मार्ग&lt;br /&gt;
| native_name_lang                = &lt;br /&gt;
| type                            = Diesel Electric Multiple Unit (DEMU)&lt;br /&gt;
| system                          = Indian Railway &amp;amp; Nepal Railway&lt;br /&gt;
| status                          = Operating&lt;br /&gt;
| electrification                 = No, Planned in future&lt;br /&gt;
| start                           = [[Bhangaha]], ([[Mahottari District]], [[Nepal]])&lt;br /&gt;
| end                             = [[Jainagar, Bihar|Jaynagar]], ([[Madhubani district]], [[India]])&lt;br /&gt;
| stations                        = [[Inarwa railway station|Inarwa]], Khajuri, Baidehi, Parbaha, [[Janakpurdham railway station|Janakpur]], Kurtha, Khutta Pipradhi, Loharpatti, Singyahi, Bhangaha&lt;br /&gt;
| routes                          = Bhangaha-Kurtha-Janakpur-Jayanagar&lt;br /&gt;
| open                            = {{start date and age|1937}}&lt;br /&gt;
| event1label                     = Upgradation&lt;br /&gt;
| event1                          = 2014 - 2019&lt;br /&gt;
| event2label                     = Reopened&lt;br /&gt;
| event2                          = 2022&lt;br /&gt;
| event3label                     = Inaugurated by&lt;br /&gt;
| event3                          = [[Sher Bahadur Deuba]]&amp;lt;br&amp;gt;(As PM of Nepal)&amp;lt;br&amp;gt;[[Narendra Modi]]&amp;lt;br&amp;gt;(As PM of India)&lt;br /&gt;
| linelength_km                   = 68.7&lt;br /&gt;
| linelength_mi                   = auto&lt;br /&gt;
| linelength                      = (currently 52 km is operational)&lt;br /&gt;
| gauge                           = {{Track gauge|5ft6in|lk=on}}&lt;br /&gt;
| speed_mph                       = 69&lt;br /&gt;
| map                             = {{Jaynagar–Janakpur line}}&lt;br /&gt;
| map_state                       = collapsed&lt;br /&gt;
| locale                          = [[India]]n state of [[Bihar]] and [[Nepal]]ese province of [[Madhesh Province]]&lt;br /&gt;
| speed                           = up to 120 km/h &amp;lt;ref&amp;gt;{{Cite web|url=https://farakdhar.com/story/56933/|title=जनकपुर-जयनगर रेल्वे ट्रयाकको परीक्षण सम्पन्न, सञ्चालन हुने टुंगो छैन |trans-title=The Janakpur-Jayanagar railway track has been tested, the operation is not yet finished |language=Nepali |website=Farakdhar {{pipe}}{{pipe}} Nepal&amp;#039;s Online Magazine|access-date=7 January 2023}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
The &amp;#039;&amp;#039;&amp;#039;Jaynagar–Janakpur–Bardibas railway line&amp;#039;&amp;#039;&amp;#039; ([[Hindi]]/ [[Nepali language|Nepali]]: जयनगर–जनकपुर–बर्दिबास रेलवे) is a [[Cross-border railway lines in India|cross-border railway line]] between India and Nepal.&amp;lt;ref name=&amp;quot;:0&amp;quot;&amp;gt;{{Cite web|title=Kurtha-Jayanagar train service test successful|url=https://nepalnews.com/s/travel-and-tourism/kurtha-jayanagar-train-service-test-successful|access-date=16 January 2022|website=Nepal News|language=en|archive-date=9 April 2022|archive-url=https://web.archive.org/web/20220409051643/https://nepalnews.com/s/travel-and-tourism/kurtha-jayanagar-train-service-test-successful|url-status=dead}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |last=Delhi |first=PIB |title=Indo Nepal Rail connectivity gets a vital boost |url=https://pib.gov.in/PressReleasePage.aspx?PRID=1689207}}&amp;lt;/ref&amp;gt; The railway links [[Bijalpura]] with [[Jaynagar railway station|Jaynagar]], crossing the [[India–Nepal border]] near [[Inarwa, Dhanusha|Inarwa]].&amp;lt;ref name=&amp;quot;auto&amp;quot;&amp;gt;{{Cite web|last=Murr|first=Michael|title=Michaels WebSite|url=https://www.michael-murr.de/|access-date=16 January 2022|website=www.michael-murr.de|language=en}}&amp;lt;/ref&amp;gt; An extension to Bardibas is being constructed.&amp;lt;ref name=&amp;quot;auto&amp;quot;/&amp;gt; The line began as a {{Railgauge|2ft6in}} freight railway in 1937, and subsequently became a passenger railway. It closed in 2014 to allow it to be converted to {{Railgauge |5ft6in}} broad gauge, and reopened in 2022. At that time it was the only operational passenger railway line in Nepal.&amp;lt;ref name=&amp;quot;dorw&amp;quot;&amp;gt;{{Cite web|title=India – Nepal broad gauge passenger train service launched |url=https://www.railwaygazette.com/passenger/india-nepal-broad-gauge-passenger-train-service-launched/61314.article |access-date=8 June 2024 |publisher=Railway Gazette International |date=5 April 2022}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Route==&lt;br /&gt;
The railway begins at [[Jaynagar railway station]], in the [[Madhubani district]] of India. The international border with Nepal is less than {{convert|3|km|mi}} from the terminus, but this does not affect passengers, as there are no border facilities or checkpoints at the crossing. The first station in Nepal is [[Inarwa railway station]], a short distance after the border. There are customs checkpoints at both of these stations, but the border is maintained as an open border for people. In total, there are eight stations and six halts between Jaynagar and Bijalpura. There are also 15 major bridges and 127 smaller bridges, as well as 47 road crossings.&amp;lt;ref&amp;gt;{{cite web |url=https://www.indiatimes.com/explainers/news/first-broad-guage-passenger-link-between-india-and-nepal-566516.html |title=Explained: First Broad Gauge Passenger Train Between India And Nepal |date=10 April 2022 |publisher=India Times |access-date=9 June 2024}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Stations between Jaynagar to Bijalpura:&lt;br /&gt;
*Jaynagar (India)&lt;br /&gt;
*Inarwan (Nepal)&lt;br /&gt;
*Khajuri (Halt)&lt;br /&gt;
*Baidehi&lt;br /&gt;
*Parbaha&lt;br /&gt;
*[[Janakpurdham railway station|Janakpurdham]]&lt;br /&gt;
*Kurtha&lt;br /&gt;
*Khutta Pipradhi&lt;br /&gt;
*Loharpatti&lt;br /&gt;
*Singyahi&lt;br /&gt;
*Bhangaha (formerly Bijalpura)&lt;br /&gt;
&lt;br /&gt;
The terminal station in Nepal was known as Bijalpura prior to that section closing in 2001, after monsoon rains destroyed a bridge and washed away some of the embankments. The new station is now called Bhangaha,&amp;lt;ref&amp;gt;{{cite web |url=https://risingnepaldaily.com/news/29563 |title=Resumption of railway service after 21 years elates Bhangaha folks |publisher=The Rising Nepal |first=Gopal Prasad |last=Baral |date=17 July 2023}}&amp;lt;/ref&amp;gt; although both names are still used by various sources.&amp;lt;ref name=risingnepal29512/&amp;gt;&lt;br /&gt;
Details of how many stations there will be on the extension from Bhangaha to Bardibas had not been published in 2023.&amp;lt;ref name=Naya-Patrika/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
One year after the new broad-gauge railway opened, Niranjan Kumar Jha, the General Manager of the Nepal Railway Company, said that despite uncertainty about how many people would use the line after it had been closed for almost a decade, the number of passengers was steadily increasing, the line was making a profit, and had provided a significant boost to the local economy.&amp;lt;ref&amp;gt;{{cite web |url=https://travel.economictimes.indiatimes.com/news/railways/nepal-india-railway-line-from-jaynagar-to-kurtha-completes-1-year-of-operation/99262599 |title=Nepal-India railway line from Jaynagar to Kurtha completes 1 year of operation |publisher=Economic Times |date=5 April 2023}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== History ==&lt;br /&gt;
Following the construction of the Nepal Government Railway (NGR) in 1927, a {{RailGauge|2ft6in|lk=on}} gauge cross-border line between Amalekhagunj, Nepal and Raxaul, India,&amp;lt;ref name=ISP&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/rajgallery.htm |title=The Steam Locomotives of Nepal |publisher=The International Steam Pages}}&amp;lt;/ref&amp;gt; the &amp;#039;&amp;#039;&amp;#039;Nepal Janakpur Jaynagar Railway (NJJR)&amp;#039;&amp;#039;&amp;#039; was the second railway line to be constructed in Nepal. It was also {{RailGauge|2ft6in}} gauge and opened in 1937, linking Bijalpura and Janakpur to Jaynagar in India.&amp;lt;ref&amp;gt;{{cite web |url=http://dorw.gov.np/home/NewsDetails/4006 |title=Department of Railways |publisher=Government of Nepal |date=17 May 2024}}&amp;lt;/ref&amp;gt; Initially it was used by Britishers to carry timber from the then heavily forested areas of [[Janakpur]] in the [[Kingdom of Nepal]] to [[Jainagar, Bihar|Jainagar]] (India).&amp;lt;ref name=murr&amp;gt;{{cite web|url=https://www.michael-murr.de/index.php?page=236&amp;amp;languageid=en#janakpur |title=The Janakpur Railway Nepal |access-date=2 June 2024 |website=michael-murr.de}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web |url=https://www.notesnepal.com/archives/6195 |title=Railway In Nepal : History Of The First Ever Train That Arrived to Nepal |date= 11 November 2020|publisher=Notes Nepal |access-date=26 April 2022}}&amp;lt;/ref&amp;gt; When all the timber in the area had been cut down, the owners gave the railway to the Nepali Government, and the carrying of passengers began. Soon Nepalese villagers around Janakpur found it handy for commuting to their local town and going to India.{{sfn |Gallagher |1965 |p=22}} Janakpur, revered as being the birth place of the goddess [[Sita]], is a holy and popular pilgrimage destination for lots of travelers within Nepal and India. Large numbers of Indian visitors started to visit Janakpur using the railway, particularly at times of festival.&amp;lt;ref name=Poon&amp;gt;{{cite web |url=https://www.bloomberg.com/news/articles/2017-06-19/a-look-inside-nepal-s-abandoned-railway-to-india |first=Linda |last=Poon |title=A Look Inside Nepal&amp;#039;s Abandoned Railway to India |date=19 June 2017 |publisher=Bloomberg |access-date=26 April 2022}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The railway continued beyond Janakpur to Bijalpura, but this section was only accessible in the dry season, and could not be used during the rainy season. By 1965, a start had been made on upgrading it to an all-weather line, but the work ceased because of uncertainty that the project would generate any extra traffic on the line.{{sfn |Gallagher |1965 |p=23}}&lt;br /&gt;
The section from Janakpur to Bijalpura was abandoned in 2001, after the bridge over the Bighi River was destroyed and some of the embankment was washed away.&amp;lt;ref name=murr/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
A review of the railway in 1965 found that the line had carried very little freight once it had ceased to be used to transport timber.{{sfn |Gallagher |1965 |p=22}} It noted that the railway had previously been under the control of the Transport&lt;br /&gt;
Department in the Ministry of Public Works, Transport and Communication. The management were not particularly competent, and the paperwork required to move freight by rail was far too complicated, resulting in most potential customers not bothering. At the time, management had been transferred to the Nepal Transport Corporation, and there were hopes that this would lead to improvements in efficiency.{{sfn |Gallagher |1965 |p=21}} The carriage of freight at the time was hampered by the fact that the Indian railway at Jaynagar was {{Railgauge |1m}} gauge, and all goods therefore had to be transhipped at Jaynagar. The report noted that two new locomotives had been bought in 1962, and that for the relatively small cost of NRs 3 million, the line could be upgraded, including the provision of new rolling stock.{{sfn |Gallagher |1965 |p=23}}&lt;br /&gt;
&lt;br /&gt;
[[File:Janakpur Station, Nepal Railways-20160923-IMG 7914.jpg|250px|left|thumb|An abandoned narrow gauge NJJR engine at Janakpur]]&lt;br /&gt;
Trains were hauled by a mixed collection of steam locomotives until the mid 1990&amp;#039;s, when the Indian government gave four diesel locomotives to the railway.&amp;lt;ref&amp;gt;{{cite web |url=https://www.vifindia.org/2020/october/07/janakpur-jaynagar-railway-line-a-new-milestone-in-nepal-india-relations |first=Prof Hari Bansh |last=Jha |title=Janakpur-Jaynagar Railway Line: A New Milestone in Nepal-India Relations |publisher=Vivekananda International Foundation |date=7 October 2020}}&amp;lt;/ref&amp;gt; However, one of the steam locomotives was retained in working order until at least 2005.&amp;lt;ref&amp;gt;{{cite web |url=https://www.farrail.com/pages/touren-engl/nepal_nov-2005.html |title=Steam on the Janakpur Railway |publisher=Farrail |year=2005}}&amp;lt;/ref&amp;gt; In 1965, experts concluded that the railway had never been well-maintained, and that the condition of the rolling stock and track was &amp;quot;fair-to-poor&amp;quot;.{{sfn |Gallagher |1965 |p=23}} The [[British Broadcasting Company]] produced a programme about the railway in 2014, which showed that conditions were worse. With no funding from central government, the track and rolling stock were dilapidated. Trains frequently derailed, but were usually put back on the track with help from the passengers, and only one of the four diesel locomotives was operational, but often broke down. Despite not having been paid for over three months, the staff continued to operate the line, repairing the locomotive when required and attempting to obtain fuel for it. Although it was a lifeline for the communities at Janakpur and along the line,&amp;lt;ref&amp;gt;{{cite web |url=https://www.bbc.co.uk/programmes/b05mp8mt |title=The Last Train in Nepal |publisher=BBC |year=2014}}&amp;lt;/ref&amp;gt; the train service ceased in 2014 so that the line could be converted to broad gauge.&amp;lt;ref name=Poon/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Conversion to broad gauge===&lt;br /&gt;
The Darbhanga to Jaynagar was converted to broad gauge in 2007, with new trains running from same year.&amp;lt;ref&amp;gt;{{cite web |url=https://www.oneindia.com/2007/09/23/lalu-prasad-to-inaugurate-broad-gauge-at-jaynagar-tomorrow-1190545347.html |title=Lalu Prasad to inaugurate broad gauge at Jaynagar tomorrow |publisher=One India |date=23 September 2007}}&amp;lt;/ref&amp;gt; Three years later, a memorandum of understanding was issued by the governments of Nepal and India, which would see India&amp;#039;s Ministry of Railways rebuilding the line from Jaynagar to Janakpur and beyond, as the first of several cross-border broad gauge links between the two countries. Accordingly, the narrow gauge service ceased in March 2014, to allow the work to start.&amp;lt;ref name=gazette&amp;gt;{{cite web |url=https://www.railwaygazette.com/passenger/india-nepal-broad-gauge-passenger-train-service-launched/61314.article |title=India – Nepal broad gauge passenger train service launched |publisher=Railway Gazette International |date=5 April 2022}}&amp;lt;/ref&amp;gt; Construction started when [[Nepali Congress]] leader [[Bimalendra Nidhi]] was Minister for Physical Infrastructure and Transport in the [[Koirala cabinet, 2013|Sushil Koirala cabinet]].&amp;lt;ref name=&amp;quot;dorw&amp;quot;/&amp;gt;&amp;lt;ref&amp;gt;{{Cite web  |title=Train To Himalayas India Nepal Passenger Rail Service Begins Today Here All You Need To Know |url=https://www.india.com/news/india/india-nepal-cross-border-passenger-train-routes-services-documents-required-to-travel-jaynagar-kurtha-rail-service-all-details-here-5315596/ |access-date=2 April 2022 |website=www.india.com |date=2 April 2022 |language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web |title=Nepal, India PMs likely to jointly inaugurate cross-border railway link |url=https://www.wionews.com/south-asia/nepal-india-pms-likely-to-jointly-inaugurate-cross-border-railway-465246 |access-date=2 April 2022 |website=WION |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
[[File:Nepal Railway on it&amp;#039;s inauguration day 20220402.jpg|thumb|left|alt= A Nepal Railway train on its inaugural run after the rail line&amp;#039;s conversion to broad gauge.|A Nepal Railway train on its inaugural run after the rail line&amp;#039;s  conversion to broad gauge.]]&lt;br /&gt;
The job of rebuilding the tracks and stations was awarded to [[Ircon International]], and was funded by a grant of [[Nepali Rupees|NPR]] 8.77&amp;amp;nbsp;billion from the Indian Government. The project was split into three sections, with the first running from Jaynagar to Janakpur and Kurtha, beyond which the formation was washed away in 2001. This section is {{convert|35|km|mi}} long, and was completed in 2019, but the train service did not start until 2022. The next {{convert|17|km|mi}} from Kurtha to Bijalpura, the original terminus prior to 2001, was completed by April 2023. Construction of the final {{convert|17|km|mi}} from Bijalpura to Bardibas was dependant on the Nepalese government making the land available.&amp;lt;ref name=gazette/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The Nepal Rail Company (NRC) is responsible for operating the trains and maintaining them. They bought two 5-car diesel-electric multiple units from the Integral Coach Factory in [[Chennai]], paid for by the Nepali government. NRC have an operation and maintenance support contract with the [[Konkan Railway Corporation]], while [[Indian Railways]] are training staff and providing other expertise. Trial running on the new railway took place in July 2021, and both countries signed a &amp;quot;standard operating procedure&amp;quot; on 6 October 2021, which covers the operation of both passenger and freight trains on the line. In December 2021 the Indian Commissioner of Railway Safety approved the {{convert|3|km|mi|adj=on}} section from Jaynagar to the border, after which the new railway was handed over to the Nepali government.&amp;lt;ref name=gazette/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The section from Jayanagar to Kurtha was officially inaugurated by Nepali Prime Minister [[Sher Bahadur Deuba]] and Indian Prime Minister [[Narendra Modi]] on 2 April 2022.&amp;lt;ref&amp;gt;{{cite web|title=Deuba, Modi flag off Kurtha-Jayanagar railway from Delhi|url=https://kathmandupost.com/national/2022/04/02/deuba-modi-flag-off-kurtha-jayanagar-railway-from-delhi|website=kathmandupost.com|language=en|date=2 April 2022}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web|last1=Samiti |first1=Rastriya Samachar |date=19 July 2021|title=Speed trial run conducted on Janakpur-Jayanagar railway track|url=https://thehimalayantimes.com/nepal/speed-trial-run-conducted-on-janakpur-jayanagar-railway-track|access-date=16 January 2022|website=The Himalayan Times|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{Cite web|title=North has renewed cross-border train pledge, but progress slow on the ground|url=https://kathmandupost.com/national/2021/12/18/north-has-renewed-cross-border-train-pledge-but-progress-slow-on-the-ground|access-date=16 January 2022|website=kathmandupost.com|language=en}}&amp;lt;/ref&amp;gt; It was fully operational for passenger service on 3 April 2022.&amp;lt;ref&amp;gt;{{cite web|title=Janakpur-Jayanagar Railway to come into operation from Sunday|url=https://myrepublica.nagariknetwork.com/news/janakpur-jayanagar-railway-to-come-into-operation-from-sunday/|website=My Republica|language=en|access-date=7 January 2023}}&amp;lt;/ref&amp;gt;&amp;lt;ref&amp;gt;{{cite web|last1=Samiti|first1=Rastriya Samachar|title=Kurtha-Jayanagar railway service to launch today|url=https://thehimalayantimes.com/business/kurtha-jayanagar-railway-service-to-launch-today|website=The Himalayan Times|language=en|date=2 April 2022|access-date=7 January 2023}}&amp;lt;/ref&amp;gt; The second section from Kurtha to Bijalpura was formally opened by Prakash Jwala, Nepal&amp;#039;s Minister for Physical Infrastructure and Transport on 16 July 2023, during a visit to Janakpur.&amp;lt;ref name=risingnepal29512&amp;gt;{{cite web |url=https://risingnepaldaily.com/news/29512 |title=Janakpur-Jayanagar train extended to Bijalpura |publisher=The Rising Nepal |date=16 July 2023}}&amp;lt;/ref&amp;gt; By late 2023, the government had resolved issues with the purchase of land for the third section, but progress was delayed until compensation payments for the land had been made. A survey of the new route began on 17 December 2023, and construction was scheduled to begin once that was completed.&amp;lt;ref&amp;gt;{{cite web |url=https://kathmandupost.com/national/2023/12/18/survey-starting-this-week-for-extending-jayanagar-bijalpura-bardibas-railway |title=Survey starting this week for extending Jayanagar-Bijalpura-Bardibas railway |publisher=The Kathmandu Post |date=18 December 2023}}&amp;lt;/ref&amp;gt; Construction was expected to take about three years.&amp;lt;ref name=Naya-Patrika&amp;gt;{{cite web |url=https://nayapatrikadaily.com/news-details/131475/2023-12-31?fbclid=IwAR1ou4b4PScE3ETEMs2XD39vTfAQ5fxrYmUG3FeitmNaqDLCPkkJvPPRo9Y |title=नेपाल रेलवेको तेस्रो चरणको ट्रयाक निर्माणको सर्भे हुँदै  |trans-title=Construction of the track of the third stage of the Nepal Railway is underway |date=1 January 2024 |website=nayapatrikadaily.com |publisher=Naya Patrika |access-date=1 January 2024 |language=Nepali}}&amp;lt;/ref&amp;gt; It is expected to boost industralization, religious and cultural tourism after completion.&amp;lt;ref name=&amp;quot;:0&amp;quot; /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Rolling stock==&lt;br /&gt;
As well as locomotives supplied directly to the Janakpur-Jaynagar railway, most of the stock from the Nepal Government Railway was transferred to the railway when the NGR closed in 1968.&amp;lt;ref name=ISP/&amp;gt; The following steam locomotives are known to have been active on the railway.&amp;lt;ref&amp;gt;{{cite web |url=https://www.gwrarchive.org/site/sitel2pg/Nepal/nepal.php |title=Railway systems in Nepal |publisher=The Restoration &amp;amp; Archiving Trust}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
{|class=&amp;quot;wikitable&amp;quot;&lt;br /&gt;
!NGR No&lt;br /&gt;
!Name&lt;br /&gt;
!Builder&lt;br /&gt;
!Type&lt;br /&gt;
!Date&lt;br /&gt;
!Works number&lt;br /&gt;
!Notes&lt;br /&gt;
|-&lt;br /&gt;
|1&lt;br /&gt;
|&amp;#039;&amp;#039;Pashupati&amp;#039;&amp;#039;&lt;br /&gt;
|[[Hunslet Engine Company|Hunslet]]&lt;br /&gt;
|{{nowrap|{{whyte|4-6-0|T}}}}&lt;br /&gt;
|1926&lt;br /&gt;
|1536&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|2&lt;br /&gt;
|&amp;#039;&amp;#039;Guhyeshwari&amp;#039;&amp;#039;&lt;br /&gt;
|Hunslet&lt;br /&gt;
|{{nowrap|{{whyte|4-6-0|T}}}}&lt;br /&gt;
|1926&lt;br /&gt;
|1537&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|3&lt;br /&gt;
|&amp;#039;&amp;#039;Gorakhnath&amp;#039;&amp;#039;&lt;br /&gt;
|[[Avonside Engine Company|Avonside]]&lt;br /&gt;
|{{nowrap|{{whyte|0-6-0|T}}}}&lt;br /&gt;
|1928&lt;br /&gt;
|2016&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|4&lt;br /&gt;
|&amp;#039;&amp;#039;Mahibir&amp;#039;&amp;#039;&lt;br /&gt;
|[[Beyer, Peacock &amp;amp; Company]]&lt;br /&gt;
|{{nowrap|{{whyte|2-6-2+2-6-2|&amp;amp;nbsp;[[Garratt]]}}}}&lt;br /&gt;
|1932&lt;br /&gt;
|6736&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|&lt;br /&gt;
|&amp;#039;&amp;#039;Rama&amp;#039;&amp;#039;&lt;br /&gt;
|[[Orenstein &amp;amp; Koppel]]&lt;br /&gt;
|{{nowrap|{{whyte|2-6-2|T}}}}&lt;br /&gt;
|1936&lt;br /&gt;
|12757&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|&lt;br /&gt;
|&amp;#039;&amp;#039;Seeta&amp;#039;&amp;#039;&lt;br /&gt;
|[[Orenstein &amp;amp; Koppel]]&lt;br /&gt;
|{{nowrap|{{whyte|2-6-2|T}}}}&lt;br /&gt;
|1936&lt;br /&gt;
|12758&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|5&lt;br /&gt;
|&amp;#039;&amp;#039;Krishna&amp;#039;&amp;#039;&lt;br /&gt;
|[[Du Croo &amp;amp; Brauns]]&lt;br /&gt;
|{{nowrap|{{whyte|0-10-0|T}}}}&lt;br /&gt;
|1939&lt;br /&gt;
|241&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|6&lt;br /&gt;
|&amp;#039;&amp;#039;Sitaram&amp;#039;&amp;#039;&lt;br /&gt;
|Beyer Peacock &amp;amp; Company&lt;br /&gt;
|{{nowrap|{{whyte|2-6-2+2-6-2|&amp;amp;nbsp;Garratt}}}}&lt;br /&gt;
|1947&lt;br /&gt;
|7243&lt;br /&gt;
|Ex NGR&lt;br /&gt;
|-&lt;br /&gt;
|7&lt;br /&gt;
|&amp;#039;&amp;#039;Bishnu&amp;#039;&amp;#039;&lt;br /&gt;
|Hunslet&lt;br /&gt;
|{{nowrap|{{whyte|0-6-2|T}}}}&lt;br /&gt;
|1949&lt;br /&gt;
|3684&lt;br /&gt;
|Ex NGR. Used for steam charters after dieselisation&amp;lt;ref&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/nepal321.htm |title=Raj Steam - Nepal |publisher=The International Steam Pages |p=321}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
|-&lt;br /&gt;
|&lt;br /&gt;
|&amp;#039;&amp;#039;Surya&amp;#039;&amp;#039;&lt;br /&gt;
|Hunslet&lt;br /&gt;
|{{nowrap|{{whyte|0-6-2|T}}}}&lt;br /&gt;
|1962&lt;br /&gt;
|3875&lt;br /&gt;
|&lt;br /&gt;
|-&lt;br /&gt;
|&lt;br /&gt;
|&amp;#039;&amp;#039;Shree Chandra&amp;#039;&amp;#039;&lt;br /&gt;
|Hunslet&lt;br /&gt;
|{{nowrap|{{whyte|0-6-2|T}}}}&lt;br /&gt;
|1962&lt;br /&gt;
|3876&lt;br /&gt;
|&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
In 1994, four class ZDM-5 diesel locomotives were sent to the railway from India. 41 of the type were built by the [[Chittaranjan Locomotive Works]] from 1989 onwards. They weighed 22 tonnes and were built for lines where the axle loading could not exceed 6 tonnes. They had a {{whyte|Bo-Bo}} wheel arrangement and the 490hp engine drove a hydraulic transmission system.&amp;lt;ref&amp;gt;{{cite web |url=https://www.irfca.org/faq/faq-loco-diesel-mg.html#zdm-1 |title=Narrow Gauge Locomotives |publisher=IRFCA |year=2021}}&amp;lt;/ref&amp;gt; Initially, two locomotives, ZDM-535 and ZDM-536, were supplied by Indian Railways, who also provided crews to operate them.&amp;lt;ref&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/nepal304.htm |title=Raj Steam - Nepal |publisher=The International Steam Pages |p=304}}&amp;lt;/ref&amp;gt; Shortly afterwards, they were joined by ZDM-533&amp;lt;ref&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/nepal341.htm |title=Raj Steam - Nepal |publisher=The International Steam Pages |p=341}}&amp;lt;/ref&amp;gt; and ZDM-524.&amp;lt;ref&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/nepal342.htm |title=Raj Steam - Nepal |publisher=The International Steam Pages |p=342}}&amp;lt;/ref&amp;gt; The railway also had two small diesel locomotives, manufactured by [[Arnold Jung Lokomotivfabrik]] of Germany for the Nepal Government Railway in 1960. After transfer, they were used on the Bijalpura extension.&amp;lt;ref&amp;gt;{{cite web |url=https://www.internationalsteam.co.uk/raj/nepal/nepal302.htm |title=Raj Steam - Nepal |publisher=The International Steam Pages |p=302}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
&lt;br /&gt;
In 2020, two new broad gauge 5-car diesel-electric multiple units were purchased from the [[Integral Coach Factory]] in [[Chennai]]. They are rated at 1,600hp, and each has one air-conditioned coach and four standard coaches. Each multiple unit has seating for 300 passengers, with additional room for another 700 standing passengers.&amp;lt;ref name=gazette/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== See also ==&lt;br /&gt;
* [[Railway stations in Nepal]]&lt;br /&gt;
* [[Nepal Railways|Nepal railway]]&lt;br /&gt;
* [[Indian Railways]]&lt;br /&gt;
* [[List of railway stations in India|Railway stations in India]]&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
&amp;lt;references /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
==Bibliography==&lt;br /&gt;
{{Refbegin}}&lt;br /&gt;
*{{cite web&lt;br /&gt;
  |url=https://documents1.worldbank.org/curated/en/269131468291697296/pdf/multi0page.pdf&lt;br /&gt;
  |first=John S |last=Gallagher |display-authors=etal&lt;br /&gt;
  |title=A National Transport System For Nepal&lt;br /&gt;
  |publisher=International Bank for Reconstruction and Development&lt;br /&gt;
  |date=June 1965&lt;br /&gt;
 }}&lt;br /&gt;
{{Refend}}&lt;br /&gt;
&lt;br /&gt;
{{DEFAULTSORT:India-Nepal railway}}&lt;br /&gt;
[[Category:International railway lines in Asia]]&lt;br /&gt;
[[Category:5 ft 6 in gauge railways in India]]&lt;br /&gt;
[[Category:Rail transport in Nepal]]&lt;br /&gt;
[[Category:Transport in Jainagar]]&lt;/div&gt;</summary>
		<author><name>BarneyMoh54</name></author>
	</entry>
</feed>