<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Ahmedabad_high-speed_railway_station</id>
	<title>Ahmedabad high-speed railway station - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/index.php?action=history&amp;feed=atom&amp;title=Ahmedabad_high-speed_railway_station"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Ahmedabad_high-speed_railway_station&amp;action=history"/>
	<updated>2026-11-18T18:35:38Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=Ahmedabad_high-speed_railway_station&amp;diff=484966&amp;oldid=prev</id>
		<title>NADEEM BALLOCH: new - done</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=Ahmedabad_high-speed_railway_station&amp;diff=484966&amp;oldid=prev"/>
		<updated>2026-02-25T09:23:21Z</updated>

		<summary type="html">&lt;p&gt;new - done&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{{Short description|High-speed railway station in Gujarat, India}}&lt;br /&gt;
{{Use dmy dates|date=August 2025}}&lt;br /&gt;
{{Use Indian English|date=August 2025}}&lt;br /&gt;
{{Infobox station&lt;br /&gt;
| name               = Ahmedabad&lt;br /&gt;
| address            = [[Kalupur]], [[Ahmedabad]] GJ&lt;br /&gt;
| country            = India&lt;br /&gt;
| coordinates        = {{coord|23.0250|72.6027|type:railwaystation_region:IN|display=inline,title|format=dms}}&lt;br /&gt;
| elevation          = {{convert|68|m|ft}}&lt;br /&gt;
| line               = [[Mumbai–Ahmedabad high-speed rail corridor]]&lt;br /&gt;
| connections        = {{rint|metro}} {{stl|Ahmedabad Metro|Kalupur Railway Station}}&lt;br /&gt;
| structure          = Elevated&lt;br /&gt;
| platform           = &lt;br /&gt;
| tracks             = &lt;br /&gt;
| parking            = &lt;br /&gt;
| code               = &lt;br /&gt;
| opened             = &lt;br /&gt;
| opening            = 2029&amp;lt;ref&amp;gt;{{Cite web |last= |first= |date=2025-11-19 |title=India’s first bullet train inaugural run in 2027 to cover 100 km between Surat and Vapi, says Vaishnaw |url=https://www.newindianexpress.com/cities/delhi/2025/Nov/19/indias-first-bullet-train-inaugural-run-in-2027-to-cover-100-km-between-surat-and-vapi-says-vaishnaw |access-date=2025-11-21 |website=The New Indian Express |language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
| owned              = [[National High Speed Rail Corporation Limited]] (NHSRC)&lt;br /&gt;
| operator           = &lt;br /&gt;
| status             = Under construction&amp;lt;ref name=&amp;quot;TOI&amp;quot;&amp;gt;{{cite news|last=Kaushik|first=Himanshu|title=Bullet train station work in Ahmedabad from August|url=https://timesofindia.indiatimes.com/city/ahmedabad/bullet-train-station-work-in-ahmedabad-from-august/articleshow/84086369.cms|work=The Times of India|date=3 July 2021|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
| map_type           = India Gujarat#India&lt;br /&gt;
| map_dot_label      = &lt;br /&gt;
| map_size           = 300&lt;br /&gt;
| services           = &lt;br /&gt;
| mapframe           = yes&lt;br /&gt;
| mapframe-caption   = Interactive map&lt;br /&gt;
| route_map          = {{Mumbai–Ahmedabad high-speed rail corridor}}&lt;br /&gt;
| mapframe-custom    = &lt;br /&gt;
| map_state          = collapsed&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&amp;#039;&amp;#039;&amp;#039;Ahmedabad high-speed railway station&amp;#039;&amp;#039;&amp;#039; is an under construction [[High-speed railway|high-speed railway station]] on the [[Mumbai–Ahmedabad high-speed rail corridor]]. This station is located near [[Ahmedabad Junction railway station]] in [[Kalupur]], [[Ahmedabad]], [[Gujarat]], [[India]]. It is the eleventh station of the Mumbai–Ahmedabad high-speed rail corridor, after [[Anand-Nadiad high-speed railway station|Anand-Nadiad station]] and before [[Sabarmati high-speed railway station|Sabarmati station]].&amp;lt;ref name=&amp;quot;TMRG&amp;quot;&amp;gt;{{cite web|title=Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders &amp;amp; Updates|url=https://themetrorailguy.com/nhsrcl-mumbai-ahmedabad-high-speed-rail-information-route-map-fares-timings-tenders-status-updates/|work=The Metro Rail Guy|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;TOI&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Construction ==&lt;br /&gt;
The [[National High Speed Rail Corporation Limited|National High-Speed Rail Corporation Limited]] (NHSRCL) had invited tenders for Package &amp;quot;C7&amp;quot; of the [[Mumbai-Ahmedabad high-speed rail corridor]] (MAHSR) in October 2020, with a deadline of 4.5 years.&amp;lt;ref&amp;gt;{{cite web|title=NHSRCL Invites Bids for Mumbai – Ahmedabad HSR&amp;#039;s Package C7|url=https://themetrorailguy.com/2020/10/08/nhsrcl-invites-bids-for-mumbai-ahmedabad-hsrs-package-c7/|work=The Metro Rail Guy|date=8 October 2020|access-date=15 October 2023}}&amp;lt;/ref&amp;gt; In October 2021, [[Ircon International]]–[[Dineshchandra R. Agrawal Infracon]] ([[Joint venture|JV]]) won the tender.&amp;lt;ref name=&amp;quot;IRCON-DRA JV&amp;quot;&amp;gt;{{cite news|last=Khanna|first=Rajat|title=IRCON-DRA JV bags the Contract Worth Rs. 3400 Crores in MAHSR Package C7 project|url=https://www.metrorailnews.in/ircon-international-won-the-contract-of-mahsr-package-c7-project/|work=Metro Rail News|date=5 October 2021|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt; The NSHRCL signed a contract with the JV for the design and construction of the high-speed railway viaduct through [[Ahmedabad]], Ahmedabad and [[Sabarmati high-speed railway station|Sabarmati]] stations in December 2021.&amp;lt;ref&amp;gt;{{cite news|last=Pant|first=Manish|title=NHSRCL inks pact for 18-km Viaduct, 2 stations for Mumbai-Ahmedabad Bullet Train Project|url=https://www.businesstoday.in/latest/economy/story/nhsrcl-inks-pact-for-18-km-viaduct-2-stations-for-mumbai-ahmedabad-bullet-train-project-314281-2021-12-02|work=Business Today|date=2 December 2021|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt; In August 2021, the JV began construction on the station, after acquiring around 3 hectares of land by taking area of platforms no. 11 and 12 of [[Ahmedabad Junction railway station]], with a deadline of 4.5 years. The station is slated to be completed by August 2026, the time also slated for opening of the [[Gujarat]] section of the high-speed rail corridor.&amp;lt;ref name=&amp;quot;TET&amp;quot;&amp;gt;{{cite news|title=Bullet train by August 2026, hyperloop 7-8 years away: Railways Minister Ashiwini Vaishnaw|url=https://economictimes.indiatimes.com/industry/transportation/railways/bullet-train-by-august-2026-hyperloop-5-8-years-away-railways-minister-ashwini-vaishnaw/articleshow/98628483.cms|work=The Economic Times|date=14 March 2023|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;TOI&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Lines ==&lt;br /&gt;
The station will be served by the [[Mumbai–Ahmedabad high-speed rail corridor]], and will be the eleventh station of the Mumbai–Ahmedabad high-speed rail corridor in [[Ahmedabad]].&amp;lt;ref&amp;gt;{{cite web|title=Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6|url=https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm00009v1ylc-att/c8h0vm0000bzv95y.pdf|work=[[Japan International Cooperation Agency]] (JICA)|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;TMRG&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Structure ==&lt;br /&gt;
The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. Below the concourse level will be the platforms no. 11 and 12 of [[Ahmedabad Junction railway station]]. The service or the entrance level will be located facing east of platform no. 12 of the railway station. The design of the station will be inspired by the [[Sidi Saiyyed Mosque]], one of the most famous [[mosques]] of [[Ahmedabad]]. The station area will have 2 platforms of 425&amp;amp;nbsp;m (1,394&amp;amp;nbsp;ft) length for 16-coach [[E5 and H5 Series Shinkansen|E5 Series Shinkansen]] trains.&amp;lt;ref name=&amp;quot;FPJ&amp;quot;&amp;gt;{{cite news|last=Mishra|first=Kamal|title=Mumbai-Ahmedabad bullet train station facades to be built representing city&amp;#039;s character; details inside|url=https://www.freepressjournal.in/mumbai/mumbai-ahmedabad-bullet-train-station-facades-to-be-built-representing-citys-character-details-inside|work=Free Press Journal|date=18 July 2022|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;TOI&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Features ==&lt;br /&gt;
The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from [[Indian Railways|Indian Railway]] stations and similar to [[airport]]s. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a [[transport hub]] through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as [[Auto-rickshaw|auto]]s, metro, buses and taxis. The concourse level of the station will be directly connected with the nearby [[List of Ahmedabad Metro stations#Metro stations|metro station]] through skywalks and underground walkways. Such features will be available in all 12 stations of the [[Mumbai-Ahmedabad high-speed rail corridor]].&amp;lt;ref name=&amp;quot;IRCON-DRA JV&amp;quot;/&amp;gt;&amp;lt;ref name=&amp;quot;TOI&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Connectivity ==&lt;br /&gt;
===Road===&lt;br /&gt;
The station is being built just next to [[Ahmedabad Junction railway station]], towards east. Because of this location, it will be accessible easily from the entire city through the railway station, as it will be integrated with the station from platforms no. 11 and 12 through skywalks and multiple entry/exit points in different platforms of the railway station. It will be also accessible through the existing station road on the station&amp;#039;s east side that connects with the city&amp;#039;s major roads. Most of the stations being built in the [[Gujarat]] section of the [[Mumbai–Ahmedabad high-speed rail corridor]] are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.&amp;lt;ref&amp;gt;{{cite news|last=Rupera|first=Prashant|title=Bullet train terminals planned close to highways|url=https://timesofindia.indiatimes.com/city/vadodara/bullet-train-terminals-planned-close-to-highways/articleshow/64182012.cms|work=The Times of India|date=16 May 2018|access-date=15 October 2023|language=en}}&amp;lt;/ref&amp;gt;&amp;lt;ref name=&amp;quot;IRCON-DRA JV&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Rail===&lt;br /&gt;
[[File:Ahmedabad Junction railway station - Main Entrance.jpg|thumb|[[Ahmedabad Junction railway station]]]] &lt;br /&gt;
The nearest railway station after the station&amp;#039;s completion will be Ahmedabad Junction railway station, on which the station will be located over platforms no. 11 and 12.&lt;br /&gt;
&lt;br /&gt;
===Metro===&lt;br /&gt;
[[File:Kalupur metro station.jpg|thumb|[[List of Ahmedabad Metro stations#Metro stations|Kalupur Railway metro station]] of [[Red Line (Ahmedabad Metro)|Red Line (Line 2)]] of [[Ahmedabad Metro]]]]&lt;br /&gt;
The station is being built just next to [[List of Ahmedabad Metro stations#Metro stations|Kalupur Railway metro station]] of [[Red Line (Ahmedabad Metro)|Red Line (Line 2)]] of [[Ahmedabad Metro]], towards west, located just a few hundred metres away from the entrance level of the station. The concourse level of the station will be integrated with skywalks and underground walkways to connect with the metro station.&amp;lt;ref name=&amp;quot;TOI&amp;quot;/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Air===&lt;br /&gt;
[[File:Sardar Vallabhbhai Patel International Airport, Ahmedabad, India 3.jpg|thumb|[[Sardar Vallabhbhai Patel International Airport]]]]&lt;br /&gt;
The nearest airport after the station&amp;#039;s completion will be [[Sardar Vallabhbhai Patel International Airport]], located around {{cvt|10|km}} north-east from the station.&lt;br /&gt;
&lt;br /&gt;
== See also ==&lt;br /&gt;
* [[High-speed rail in India]]&lt;br /&gt;
* [[Ahmedabad Metro]]&lt;br /&gt;
* [[Ahmedabad Junction railway station]]&lt;br /&gt;
* [[Sidi Saiyyed Mosque]]&lt;br /&gt;
* [[Mumbai-Ahmedabad high-speed rail corridor]]&lt;br /&gt;
* [[National High Speed Rail Corporation Limited]]&lt;br /&gt;
&lt;br /&gt;
== Notes ==&lt;br /&gt;
{{notelist}}&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
{{reflist}}&lt;br /&gt;
&lt;br /&gt;
{{Mumbai–Ahmedabad HSR corridor stations}}&lt;br /&gt;
[[Category:Transport in Ahmedabad]]&lt;br /&gt;
[[Category:Railway stations under construction]]&lt;br /&gt;
[[Category:Railway stations in Gujarat]]&lt;/div&gt;</summary>
		<author><name>NADEEM BALLOCH</name></author>
	</entry>
</feed>