<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://en.bharatpedia.org/w/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=117.237.233.147</id>
	<title>Bharatpedia - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://en.bharatpedia.org/w/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=117.237.233.147"/>
	<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/wiki/Special:Contributions/117.237.233.147"/>
	<updated>2026-08-06T20:34:41Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.43.6</generator>
	<entry>
		<id>https://en.bharatpedia.org/w/index.php?title=NTPC_Ramagundam&amp;diff=149915</id>
		<title>NTPC Ramagundam</title>
		<link rel="alternate" type="text/html" href="https://en.bharatpedia.org/w/index.php?title=NTPC_Ramagundam&amp;diff=149915"/>
		<updated>2021-07-04T14:04:53Z</updated>

		<summary type="html">&lt;p&gt;117.237.233.147: /* Stage 3 (1×500 MW) */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Short description|Coal-fired power plant in India}}&lt;br /&gt;
{{Multiple issues|&lt;br /&gt;
{{moresources|date=February 2020}}&lt;br /&gt;
{{Inline|date=February 2021}}&lt;br /&gt;
{{Expand lead|date=February 2021}}&lt;br /&gt;
}}&lt;br /&gt;
{{Use dmy dates|date=February 2020}}&lt;br /&gt;
{{Use Indian English|date=February 2020}}&lt;br /&gt;
&lt;br /&gt;
{{Infobox power station&lt;br /&gt;
| name                = NTPC Ltd., Ramagundam&lt;br /&gt;
| name_official       = &lt;br /&gt;
| image               = rstps4.jpg&lt;br /&gt;
| image_caption       = &lt;br /&gt;
| image_alt           =         &lt;br /&gt;
| coordinates = {{coord|18|45|18|N|79|27|22|E|region:IN_type:landmark_source:dewiki|display=inline,title}}&lt;br /&gt;
| country             = India&lt;br /&gt;
| location            = [[Ramagundam]], [[Telangana]]&lt;br /&gt;
| status              = Operational&lt;br /&gt;
| construction_began  = &lt;br /&gt;
| commissioned        = Unit 1{{snd}}November 1983&amp;lt;br /&amp;gt;Unit 2{{snd}}May 1984&amp;lt;br /&amp;gt;Unit 3{{snd}}December 1984&amp;lt;br /&amp;gt;Unit 4{{snd}}June 1988&amp;lt;br /&amp;gt;Unit 5{{snd}}March 1989&amp;lt;br /&amp;gt;Unit 6{{snd}}October 1989&amp;lt;br /&amp;gt;Unit 7{{snd}}August 2004&lt;br /&gt;
| decommissioned      = &lt;br /&gt;
| cost                = &lt;br /&gt;
| owner               = &lt;br /&gt;
| operator            = NTPC Ltd.&lt;br /&gt;
| th_fuel_primary     = [[Coal]]&lt;br /&gt;
| th_fuel_tertiary    = &lt;br /&gt;
| ps_cooling_source   = Plain water (Sriram Sagar Project)&lt;br /&gt;
| ps_units_operational= 3X200&amp;amp;nbsp;MW&amp;lt;br /&amp;gt;4X500&lt;br /&gt;
| ps_units_manu_model = &lt;br /&gt;
| ps_cogeneration     = &lt;br /&gt;
| ps_combined_cycle   = &lt;br /&gt;
| ps_electrical_capacity= 2600&amp;amp;nbsp;MW&lt;br /&gt;
| ps_electrical_cap_fac= &lt;br /&gt;
| ps_annual_generation= 21,594.653 MU&lt;br /&gt;
| website             = &lt;br /&gt;
| extra               = &lt;br /&gt;
}}&lt;br /&gt;
&#039;&#039;&#039;NTPC Ramagundam&#039;&#039;&#039;, a part of [[National Thermal Power Corporation]],&amp;lt;ref name=&amp;quot;ntcp&amp;quot;/&amp;gt; is a 2,600 [[megawatt]] (MW) [[thermal power station|Power station]] situated at [[Ramagundam]] in [[Peddapalli district]] in [[Telangana]], [[India]]. It is the current largest power station in South India. It is the first [[ISO 14001]] certified &amp;quot;Super Thermal Power Station&amp;quot; in India.&amp;lt;ref&amp;gt;{{Cite web |url=http://karimnagar.nic.in/ntpc.html |title=Archived copy |access-date=11 December 2009 |archive-url=https://web.archive.org/web/20100523015645/http://karimnagar.nic.in/ntpc.html |archive-date=23 May 2010 |url-status=dead }}&amp;lt;/ref&amp;gt;&lt;br /&gt;
{{TOC limit|3}}&lt;br /&gt;
&lt;br /&gt;
==The TG Hall==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
[[File:TG HALL 1.jpg|right|thumb|Turbo-Generator Hall, UNIT#7, NTPC Ltd., Ramagundam]]&lt;br /&gt;
The TG Hall or the Turbo-Generator hall or the Turbine-Generator Hall is the hall or space where the turbine-generator sets are present.&lt;br /&gt;
&lt;br /&gt;
NTPC Ltd., Ramagundam has two TG Halls one for STAGE-I and the other common for STAGE-II and STAGE-III. These TG halls are equipped with heavy overhead cranes that assist in transportation of material within the TG hall. These cranes find their use greatly during overhauls.&lt;br /&gt;
&lt;br /&gt;
==Unit-wise power generation==&lt;br /&gt;
The whole plant is divided into 3 stages, each stage being planned at one time.&lt;br /&gt;
&lt;br /&gt;
===STAGE 1 (3×200 MW)===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
This stage consists of three units (Unit-1, Unit-2, Unit-3) each with a generation capacity of 200 MW. The turbines for these three units were manufactured by The [[Ansaldo Energia]] Ltd.&lt;br /&gt;
The construction began in the late 1970s and these units have performed well over a long period, setting many records regarding maintenance and generation over the other two stages. BUT stage (1, 2, 3) cwp motors are manufactured by BHEL and all motors are manufactured by Ansaldo.{{Clarify|date=February 2021}} S-I coal mill motors are 240 KW and PA fans are 400 KW.&lt;br /&gt;
&lt;br /&gt;
===STAGE 2 (3×500 MW)===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
This stage also consists of three units (Unit-4, Unit-5, Unit-6) each with a generation capacity of 500MW. The turbines for these three units were manufactured by [[Bharat Heavy Electricals Limited]] (BHEL). &lt;br /&gt;
[[File:STAGE III.jpg|left|thumb|Outside view of STAGE-III (Unit#7)]]&lt;br /&gt;
&lt;br /&gt;
===Stage 3 (1×500 MW)===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
This stage comprises only one unit (Unit-7). It is a first of its kind in South India, being a computer operated unit. A wide disparity may be seen between the control rooms of the other two stages and this computerised unit. To this day,{{When|date=February 2021}} many Power plant engineers train in this unit to upgrade themselves to this new mode of operation.&lt;br /&gt;
&lt;br /&gt;
==Overhauls==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
Once every two years, these units are stopped and overhauled, one unit at a time. The overhauls are usually taken up from June to September as the [[monsoons]] increase [[hydropower]] generation which substitutes for the [[power generation]] lost due to the overhaul of the unit. The same practice is followed throughout the country. The overhauls usually take 15 to 20 days per unit provided there is no major repair involved. Major repairs include turbine casing, turbine rotor damage and other damages that require transporting the equipment to another location (usually the manufacturer). The overhauls are the dissipators of the annual PLF of any [[power plant]].{{Jargon inline|date=February 2021}}&lt;br /&gt;
&lt;br /&gt;
==Generation distribution==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
===States===&lt;br /&gt;
As NTPC Ltd. is a [[Public Sector Undertaking]] (PSU), the generation is almost uniformly distributed to 5–6 states, all of which share about 20–25% of the output. These States include:&lt;br /&gt;
*[[Andhra Pradesh]]&lt;br /&gt;
*[[Telangana]]&lt;br /&gt;
*[[Tamil Nadu]]&lt;br /&gt;
*[[Kerala]]&lt;br /&gt;
*[[Karnataka]]&lt;br /&gt;
*[[Maharashtra]]&lt;br /&gt;
&lt;br /&gt;
=== Electrical substation ===&lt;br /&gt;
{{main|Electrical substation}}&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The substation is the place where the station last interacts with the power it produces. The switchyard links the power generated to the southern [[power grid]]. The major transmission points are:&lt;br /&gt;
*[[Nagarjunasagar]]&lt;br /&gt;
*[[Chandrapur]]&lt;br /&gt;
*[[Hyderabad, India|Hyderabad]]&lt;br /&gt;
*[[Khammam]]&lt;br /&gt;
&lt;br /&gt;
==Inputs==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
===Water===&lt;br /&gt;
The power station is provided water periodically by the [[Sriram Sagar Project]] (SRSP). This water is stored in the balance reservoir. The water level in the balance reservoir is monitored daily.&lt;br /&gt;
&lt;br /&gt;
===Coal===&lt;br /&gt;
[[File:BOBRN class Hopper cars Freight rakes at Samalkot Junction 01.jpg|thumb|BOBRN class [[hopper car]]s freight [[Rake (train)|rakes]] used by [[Indian Railways]]]]&lt;br /&gt;
NTPC [[Ramagundam]] is a [[Coal-fired power station]]. This coal is available at a large scale from the [[Singareni]] Coal mining company nearby and is transported using the MGR (Merry-go-round) system, wherein a train travels on one [[Rail line|rail route]], delivers coal and returns on another route. The [[Hopper car|hopper wagons]] arriving by this route are taken for coal collection where a [[Mechanism (engineering)|mechanism]] provided underneath the wagons opens on application of [[air]] [[pressure]] and drops the coal it is carrying. A separate department (MGR Dept.) handles this process.&lt;br /&gt;
&lt;br /&gt;
Coal also arrives by the [[Indian Railways]]. The [[open wagon]]s are routed via [[Ramagundam railway station]] to the separate plant line and these wagons arrive at the [[wagon tippler]]. The wagons arriving in this manner must be tilted at the wagon tippler to unload the coal as they do not have the drop mechanism underneath.&lt;br /&gt;
&lt;br /&gt;
===Other petroleum products required===&lt;br /&gt;
The station also requires various oils for the following purposes:&lt;br /&gt;
*[[Turbine]] oil (SP-46) for turbine [[lubrication]]&lt;br /&gt;
*[[Heavy fuel oil]] (HFO) for [[boiler]] start-up&lt;br /&gt;
*[[Diesel fuel|Diesel]] for DG sets (Power backup)&lt;br /&gt;
*Other oils for various hydraulic controls and circuits&lt;br /&gt;
&lt;br /&gt;
These are periodically purchased as per requirement from the Indian oil corporation [[IOCL]] establishment nearby.&lt;br /&gt;
&lt;br /&gt;
==Departments==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The plant classifies its departments as O&amp;amp;M (operation and maintenance) and Non-O&amp;amp;M.&lt;br /&gt;
&lt;br /&gt;
===Departments under O&amp;amp;M===&lt;br /&gt;
&lt;br /&gt;
====Operation====&lt;br /&gt;
The operation department has the greatest number of employees. It manages the operation of the various equipment and controls in the plant. The operation department takes care of the unit control rooms (UCBs). Since the plant operates nonstop, the operation department works in shifts to take care of the units at all times.&lt;br /&gt;
&lt;br /&gt;
====Electrical Maintenance====&lt;br /&gt;
[[File:SWITCHYARD 1.jpg|right|thumb|Switchyard of NTPC Ltd., Ramagundam]]&lt;br /&gt;
This is the largest department under the Maintenance section. This department takes care of all the electrical aspects of the plant. It takes care of the following sections:&lt;br /&gt;
*Switchyard&lt;br /&gt;
*[[Electrical generator|Generator]]&lt;br /&gt;
*Generator [[transformer]]&lt;br /&gt;
*Conveyor motors and other motors&lt;br /&gt;
*All power transmissions&lt;br /&gt;
&lt;br /&gt;
====Civil Maintenance====&lt;br /&gt;
Civil Maintenance takes care of all the civil activities in the plant such as non-mechanical constructions, maintenance of locations, [[scrap]] removal and ensuring a proper working condition of minor equipment.&lt;br /&gt;
&lt;br /&gt;
====MGR (Merry-go-Round) Department====&lt;br /&gt;
This department takes care of the coal transport to the plant.&lt;br /&gt;
&lt;br /&gt;
====CHP (Coal Handling Plant)====&lt;br /&gt;
This department takes care of all coal handling processes.&lt;br /&gt;
*Coal collection&lt;br /&gt;
*Coal storage&lt;br /&gt;
*Coal crushing&lt;br /&gt;
*Coal convey system&lt;br /&gt;
*Subsequent milling&lt;br /&gt;
&lt;br /&gt;
====Mechanical Maintenance====&lt;br /&gt;
This department has the following sections:&lt;br /&gt;
=====Boiler Maintenance=====&lt;br /&gt;
*Boiler feeders&lt;br /&gt;
*Primary and secondary air pumps&lt;br /&gt;
*Boiler feed pumps&lt;br /&gt;
*Boiler core parts&lt;br /&gt;
=====Turbine Maintenance=====&lt;br /&gt;
*Turbine core parts&lt;br /&gt;
*Turbine governing system&lt;br /&gt;
&lt;br /&gt;
===Control &amp;amp; Instrumentation===&lt;br /&gt;
This department deals with the maintenance of various control devices and instruments. It is considered to be a part of the maintenance section.&lt;br /&gt;
It has got the following sections.&lt;br /&gt;
*Boiler C&amp;amp;I&lt;br /&gt;
*Turbine C&amp;amp;I&lt;br /&gt;
&lt;br /&gt;
===Departments under non-O&amp;amp;M===&lt;br /&gt;
*HR&lt;br /&gt;
*Finance&lt;br /&gt;
*Materials and contracts&lt;br /&gt;
*IT&lt;br /&gt;
&lt;br /&gt;
==Staff==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The plant is headed by the Executive Director (ED) to whom the General Managers (GMs) report. The O&amp;amp;M group is headed by the Chief of General Managers (O&amp;amp;M) again to whom the GMs of concerned departments report.&lt;br /&gt;
&lt;br /&gt;
==Township==&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The temporary township (TTS) was constructed during the early stages of the plant. Secondary employees of the organisation&amp;lt;ref group=&amp;quot;note&amp;quot;&amp;gt;Secondary employees include: contractors, allied organisation employees, and employees of service organisations to the township, such as Dooradarshan Aliautomobiles.&amp;lt;/ref&amp;gt; now reside there.&lt;br /&gt;
&lt;br /&gt;
The permanent township (PTS) is where most of the employees reside with their families. It is known for its serenity, cleanliness, vegetation and parks.&lt;br /&gt;
&lt;br /&gt;
===Schools===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The township has three schools. [https://www.stclairentpc.org/ St. Claire High school], [[Kendriya Vidyalaya]] NTPC Ramagundam and the Sachdeva school of excellence (formerly Chinmaya Vidyalaya).&lt;br /&gt;
&lt;br /&gt;
===Shopping===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The township has a main shopping centre and four small shopping centres where the residents may shop for groceries and other regular needs.&lt;br /&gt;
&lt;br /&gt;
===Facilities===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The township is well facilitated with banking (The State Bank of India with an on-site ATM), postal services, telephone and internet services (BSNL), adequate water supply, 24/7 electricity from the plant, civil services and its own security.&lt;br /&gt;
&lt;br /&gt;
TSRTC-Godavarikhani bus depot runs city and long distance buses from the NTPC bus stop to Ramagundam railway station and various local areas.&lt;br /&gt;
&lt;br /&gt;
===Guest Houses and Restaurants===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
There are two guest houses: &amp;quot;Jyothi bhavan&amp;quot; for executives and &amp;quot;Godavari Bhavan&amp;quot; (Field Hostel) for other employees, students and trainees. There is the Satavahana Restaurant for families. These are maintained by the Indian Coffee House employees and are equipped with dining facilities thus forming as restaurants for the township residents.&lt;br /&gt;
&lt;br /&gt;
===Parks===&lt;br /&gt;
{{Unreferenced-section|date=March 2021}}&lt;br /&gt;
The township has various parks, namely the Ambedkar park, the Chacha Nehru park, the Priyadarshini park, amongst others.&lt;br /&gt;
&lt;br /&gt;
== Notes ==&lt;br /&gt;
{{Reflist|group=note}}&lt;br /&gt;
&lt;br /&gt;
== References ==&lt;br /&gt;
{{Reflist|30em|refs=&lt;br /&gt;
&amp;lt;ref name=&amp;quot;ntcp&amp;quot;&amp;gt;{{Cite web |url=https://www.ntpc.co.in/power-generation/coal-based-power-stations/ramagundam |title=Coal Based Power Stations |access-date=24 February 2021 |url-status=live |archive-url=https://web.archive.org/web/20210224222201/https://www.ntpc.co.in/power-generation/coal-based-power-stations/ramagundam |archive-date=24 February 2021}}&amp;lt;/ref&amp;gt;&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== External links ==&lt;br /&gt;
{{Portal|Energy}}&lt;br /&gt;
* https://www.ntpc.co.in&lt;br /&gt;
{{commons category}}&lt;br /&gt;
&lt;br /&gt;
{{NTPC Power Stations}}&lt;br /&gt;
{{Power Plants of Telangana}}&lt;br /&gt;
{{Godavari basin}}&lt;br /&gt;
&lt;br /&gt;
{{DEFAULTSORT:Ntpc Ramagundam}}&lt;br /&gt;
[[Category:Coal-fired power stations in Telangana]]&lt;br /&gt;
[[Category:Karimnagar district]]&lt;br /&gt;
[[Category:1983 establishments in Andhra Pradesh]]&lt;/div&gt;</summary>
		<author><name>117.237.233.147</name></author>
	</entry>
</feed>