Kempegowda International Airport

This is a good article. Click here for more information.
From Bharatpedia, an open encyclopedia


Kempegowda International Airport
File:Kempegowda International Airport Bengaluru Logo.svg
Bangalore Bengaluru Kempegowda International Airport (48186335991).jpg
Summary
Airport typePublic
Owner/OperatorBengaluru International Airport Limited (BIAL)
ServesBangalore
LocationDevanahalli, Bangalore Rural district, Karnataka, India
Opened24 May 2008; 15 years ago (2008-05-24)
Hub for
Focus city for
Elevation AMSL915 m / 3,002 ft
Coordinates13°12′25″N 077°42′15″E / 13.20694°N 77.70417°E / 13.20694; 77.70417Coordinates: 13°12′25″N 077°42′15″E / 13.20694°N 77.70417°E / 13.20694; 77.70417
WebsiteBengaluru Airport
Map
BLR/VOBL is located in Karnataka
BLR/VOBL
BLR/VOBL
Location of airport in Karnataka
BLR/VOBL is located in India
BLR/VOBL
BLR/VOBL
BLR/VOBL (India)
BLR/VOBL is located in Asia
BLR/VOBL
BLR/VOBL
BLR/VOBL (Asia)
Runways
Direction Length Surface
m ft
09L/27R 4,000 13,123 Asphalt
09R/27L 4,000 13,123 Asphalt
Statistics (April 2022 – March 2023)
Passengers31,911,429 (Increase 95.9%)
International passengers3,785,264 (Increase 29%)
Aircraft movements223,223 (Increase 50.8 %)
Cargo tonnage410,311 (Decrease 0.3%)
Source: AAI[4][5][6]

Kempegowda International Airport (IATA: BLR, ICAO: VOBL) is an international airport serving Bangalore, the capital of Karnataka, India. Spread over 4,000 acres (1,600 ha), it is located about 30 kilometres (19 mi) north of the city near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008 as an alternative to increased congestion at HAL Airport, the original primary commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bangalore. Kempegowda International Airport became Karnataka's first fully solar powered airport, developed by CleanMax Solar.[7][8]

The airport is the third-busiest airport by passenger traffic, air traffic movements and domestic and total cargo handled in India,[9] behind the airports in Delhi and Mumbai, and is the 29th busiest airport in Asia. In the FY 2021–22, the airport handled around 16.2 million passengers and 411,550 tonnes (453,660 short tons) of cargo. The airport offers connecting flights to all six inhabited continents, and direct flights to five of them.

The airport has two passenger terminals that handles both domestic and international operations, and two runways, the second of which was commissioned on 6 December 2019.[10][11] The second terminal was inaugurated by Prime Minister Narendra Modi in December 2022 and began domestic operations in January 2023. It will handle international operations from September 2023.[12][13] There is also a cargo village and three cargo terminals. The airport serves as a hub for AIX Connect, Alliance Air, Go First, IndiGo, Star Air and DHL Aviation[3] and is a focus city for Air India and SpiceJet.

History[edit]

Planning (1991–2004)[edit]

The original airport serving Bangalore was HAL Airport, located 5 kilometres (3.1 mi) from the city centre. It was the primary airport serving Bangalore city until 2008. Originally established in 1942 for military and defence purposes, HAL began domestic operations for the first time in the late 1970s. The unexpected popularity of the newly offered domestic flights encouraged rapid expansion of the airport. In the late 1990s, the first international flights started.[14] Air India was the first airline to offer international flights, flying to Singapore. In 2000, the first foreign airline started operations from HAL Airport, with Royal Nepal Airlines to Kathmandu, followed by Lufthansa's A340 a year later from Germany. Several other major international carriers such as British Airways and Air France were already serving the old airport by 2005.[15]

However, as Bangalore grew into the Silicon Valley of India and passenger traffic to the city rose, HAL Airport with a single runway and limited aircraft parking space was unable to cope with this increased traffic. In 2007 it saw a footfall of 8 million passengers, more than double its original capacity of 3.6 million.[16][17] There was no room for expansion and the airport apron could only park six aircraft.[18] In March 1991, former chairman of the National Airports Authority of India (NAAI) S. Ramanathan convened a panel to select the site for a new airport. The panel decided on Devanahalli, a village about 30 kilometres (19 mi) north of Bangalore.[19][20] The State Government made a proposal to build the airport with private assistance, which the Union Government approved in 1994.[21] Finally in 1995, Airports Authority of India (AAI) and Government of Karnataka decided to call for international consortia to own, build and operate the new Greenfield airport of the city.[22]

In December 1995, a consortium of Tata Group, Raytheon and Singapore Changi Airport signed a memorandum of understanding with the State Government regarding participation in the project. In June 1998, however, the consortium announced it was pulling out of the project due to delays in government approval. These included disputes over the location of the airport and the fate of HAL Airport.[19][23]

In May 1999, the Airports Authority of India (AAI) and the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) of the State Government signed a memorandum of understanding regarding the nature of the project. It would be a public–private partnership, with AAI and KSIIDC having a 26% share and private companies having the remaining 74%.[21] In January 2001, the State Government created the company Bengaluru International Airport Limited (BIAL) as a special purpose entity and began searching for partners.[24] By November, the project had attracted Unique Zürich Airport, Siemens Project Ventures and Larsen & Toubro.[25] Construction was expected to begin in October 2002;[26] however, governmental delays persisted.[27][28] The concession agreement between the State Government, the Union Government and BIAL was signed in July 2004.[29] In it, BIAL required the closure of HAL Airport.[30]

It took nearly a decade from the initial stage of land allocation and acquisition, to signing of shareholder agreements in 2002 and until start of construction.

During the formation of legal framework, BIAL's main observation was the unprecedented growth that aviation industry faced.[22]

Designing[edit]

BIAL, when the project was first designated, had anticipated traffic of approximately 5 million in the first year of operations in 2008. However, HAL Airport had handled over 8 million passengers by the time the construction of the new greenfield airport started. It took more than nine months to redesign the process along with gaining the necessary approvals, and when the approval for increased project was sanctioned, the construction was half done. The project was well on track despite the challenge and was expected to be ready by its initial given open date.

The revised increased capacity project was constructed to cater to eleven million passengers per annum, up from the previous plan of 5 million passengers per annum. BIAL increased project had plans to build a terminal with eight passengers boarding bridges, one double arm aerobridge, nine remote bus gates and a runway measuring 4,000 metres with efficient taxiways. BIAL also planned to build an apron with 42 Code-C aircraft stands (with eight contact stands) as well as an air- and land-side road system. The estimated cost for the entire project was Rs 1,930 crore (approximately US$430 million).[22]

Construction and opening (2005–2008)[edit]

Construction finally commenced on 2 July 2005.[31] When a study predicted the airport would receive 6.7 million passengers in 2008, the airport was redesigned from its initial capacity of 4.5 million passengers to 11 million,[32] with the terminal size expanded and the number of aircraft stands increased. The cost of the airport rose to 19.3 billion (US$270 million).[33] Construction was completed in 32 months, and BIAL set the launch date for 30 March 2008.[34] However, due to delays in establishing air traffic control services at the airport, the launch date was pushed to 11 May[35] and finally 24 May 2008.[36]

As the opening date for the airport approached, public criticism arose, mainly directed toward the closure of HAL Airport. In March 2008, AAI employees conducted a massive strike against the closure of HAL Airport along with Begumpet Airport in Hyderabad, fearing they would lose their jobs.[37] The Bangalore City Connect Foundation, a group of citizens and businessmen, staged a rally in mid-May, claiming the new airport was too small for the latest demand projections.[38][39] On 23 May, a hearing was held at the Karnataka High Court over poor connectivity between the city and the airport. Ultimately, the State Government decided to go ahead with inaugurating the new airport and closing HAL Airport.[40]

The first flight to the airport, Air India Flight 609 from Mumbai, was allowed to land the previous night as it would be continuing to Singapore shortly after midnight. The aircraft touched down at 10:40 pm on 23 May.[41] The airport became the third greenfield airport under a public–private partnership to open in India, after Rajiv Gandhi International Airport in Hyderabad and Cochin International Airport.[42]

Renaming and expansion (2009–present)[edit]

The original name of the airport was "Bangalore International Airport".[43] In February 2009, the State Government sent a proposal to the Union Government to rename the airport after the founder of Bangalore, Kempe Gowda I.[44] When no action was taken, the State Government passed a resolution for the name change in December 2011.[45] The Union Government accepted the proposal in 2012[46] and formally approved it in July 2013.[45] The airport was officially renamed "Kempegowda International Airport" on 14 December 2013 amid the inauguration of the expanded terminal building.[47]

Kingfisher Airlines once operated a hub and was one of the largest airlines at the airport. Following its collapse in October 2012, other airlines stepped in to fill the gap in domestic connectivity by adding more flights.[48] In addition, Air Pegasus and AirAsia India (renamed as AIX Connect in 2023) launched hub operations at the airport in 2014.[49][50]

The first phase of expansion was launched in June 2011 and finished in December 2013.[51][52] The 15 billion (US$210 million) project doubled the size of the passenger terminal to 150,556 square metres (1,620,570 sq ft), involving the construction of additional facilities for check-in, immigration, security and baggage reclaim.[52][53] One domestic gate and three international gates were added as well. A large, sweeping roof connects the original building with the expanded areas.[54] The expanded terminal, dubbed "Terminal 1A", has raised the annual passenger capacity of the airport to 25 million.[55]

In September 2022, Qantas began flying to Sydney with Airbus A330s. This is the first nonstop service between Bangalore and Australia.[56][57] The following month, Emirates introduced the Airbus A380, the world's largest passenger plane, on one of its flights to Dubai, marking Bangalore's first A380 service.[58] Air India started a scheduled flight to San Francisco aboard Boeing 777 aircraft in December.[59][60]

Ownership[edit]

The airport is owned and operated by Bengaluru International Airport Limited (BIAL), a public limited company. The Government of India has granted BIAL the right to operate the airport for 30 years, with the option to continue for another 30 years. The company is a public–private consortium venture. GVK initially owned 43% of the shares in Bangalore Airport. In 2016, GVK decided to divest its 33% share of in BIAL to Fairfax Financial for ₹2149 cr. In March 2017, GVK confirmed having done so.

Finally, in January 2018, GVK decided to sell the remaining 10% shares to Fairfax Financial for ₹1,290 crore and exit Bangalore Airport completely.[61]

26% is held by government entities Karnataka State Industrial Investment and Development Corporation (13%) and Airports Authority of India (13%), and 74% is held by private companies Fairfax Financial (54%) and Siemens Project Ventures (20%).[62][63][64]

In March 2021 the Airports Authority of India announced their plans to sell their 13% stake in order to raise funds. Between FY 2022–2025, the Government aims to raise as much as ₹20,782 crore through aviation. The process will start with the selling of stakes of Bangalore Airport followed by Hyderabad, Mumbai and Delhi.[65]

Facilities[edit]

Duty Free at the International Arrivals

Runways[edit]

Kempegowda International Airport has two runways in use.

Active Runways at Kempegowda International Airport
Runway Designation Length Width Approach lights/ILS
09L/27R 4,000 metres (13,000 ft) 45 metres (148 ft) CAT I / CAT I [66]
09R/27L 4,000 metres (13,000 ft) 60 metres (200 ft) CAT III / CAT III [67]

Four years after it was laid, the first runway (now designated 09L/27R) was entirely resurfaced because of a serious decline in quality.[68] From 11 March to 3 April 2012, it was closed daily between 10:30 am and 5:30 pm.[69] As a result, BIAL accused construction company Larsen & Toubro of building the runway poorly.[70] South of runway 09L/27R are a full-length parallel taxiway and the apron, which extends from the Blue Dart/DHL terminal to the passenger terminal.

The construction of the second runway at the airport is now complete, and was officially in use from 6 December 2019, when an IndiGo airlines flight (6E 466) to Hyderabad took off from runway 09R.[71] The runway will cater to all types of aircraft including Code-F aircraft like Airbus A380 and Boeing 747-8 and will be equipped with CAT IIIB ILS. The runway also features an associated parallel taxiway and two cross-field taxiways on the east linking the new runway to the existing north runway and the aprons at Terminal 1 and the upcoming Terminal 2. The first runway (09L/27R) was also upgraded as part of the expansion work.[72]

The old runway (Runway 09L/27R) was closed from 22 June 2020 for nine months for rehabilitation and strengthening.[73] The runway was opened for service again on 31 March 2021 and put into service with the south runway, making KIA the first airport in South India to have parallel runway operations.[74]

Terminals[edit]

Terminal 1[edit]

International departures section at Kempegowda International Airport

A single integrated passenger terminal accommodates both domestic and international operations. It covers 150,556 m2 (1,620,570 sq ft) and can handle 20 million passengers annually.[53][55] Check-in and baggage reclaim areas are situated on the lower floor, while departure gates are located on the first floor. Gates 1, 2, 12–18, 28–30 on the first floor are used for domestic departures, gates 31–42 on the first floor are used for international departures, gates 3–9 and gates 19–25 form the Western and Eastern bus gates respectively.[75] Gate 41–42 is equipped to serve the world's largest passenger aircraft, the Airbus A380.[76] Lounges are provided by Travel Food Services, which also operates a transit hotel in the terminal. For VIPs there is a separate 930-square-metre (10,000 sq ft) lounge.[54][77][78]

There are two lounges in Terminal 1, the 080 Domestic and the 080 International lounges. Named "080" after the trunk dial code of the city of Bangalore, the lounges aim to pay an ode to the Garden City of Bangalore with local artistry, culture-inspired interiors and botanical elements, each zone in the lounge is carefully crafted to bring alive the stories of the city it’s inspired by. Both the lounges are operated by Travel Food Services.[79] The terminal will eventually handle only domestic operations from 1 September 2023, as the new second terminal building is built exclusively to handle international flights to relieve the growing pressure on Terminal 1. It is undergoing renovations as part of its conversion to a domestic terminal since January 2023.[13]

Terminal 2[edit]

The airport's second terminal, designed as a tribute to the "Garden City" of Bangalore by Skidmore, Owings & Merrill and constructed by Larsen & Toubro was inaugurated on 11 November 2022, by Prime Minister Narendra Modi. The first phase of terminal 2, built at a cost of around ₹ 5,000 crore, with a size of 255,000 sq.m., will help augment the capacity of the airport by an additional 25 million passengers per annum.[80] The second phase of terminal 2 is planned and is expected to provide an additional capacity of 20 million passengers per annum,[81] thereby increasing the overall capacity of the terminal to over 45 million passengers per annum. Construction of the first phase of terminal 2 commenced in 2018, but the project faced delays owing to the COVID-19 pandemic.[82]

The arrivals area of terminal 2 is situated on the ground floor, while departures are planned on the first floor. The first phase of terminal 2 features 95 check-in counters, 17 security check lanes, 9 baggage claim belts, 34 conventional and 6 electronic immigration gates. With provisions for tarmac gates and jet bridge gates, including Code-F gates to handle larger aircraft like the Airbus A380 and the Boeing 747-8, the first phase of terminal 2 started with domestic operations on 15 January 2023, with Star Air being the first airline to operate out of the new terminal.[83] The terminal will eventually handle all international operations from 1 September 2023.[13]

Technology and sustainability were some of the key design goals of Terminal 2, with the terminal receiving a LEED Platinum certification from the U.S. Green Building Council.

Aviation fuel services[edit]

The airport has a fuel farm, spread over 11 acres (4.5 ha) west of the cargo village and passenger terminal. It was built by IndianOil SkyTanking Ltd (IOSL) but is shared by multiple oil companies.[84] In October 2008, Indian Oil commissioned a 36-kilometre (22 mi) fuel pipeline between its storage terminal in Devanagonthi and Kempegowda Airport. Previously, jet fuel had to be transported to the airport by tank trucks, which created traffic and pollution problems.[85]

Cargo facilities[edit]

Kempegowda Airport has three cargo terminals. One is operated by AISATS (Air India Singapore Airport Terminal Services) Ltd and has a capacity for 150,000 tonnes (170,000 short tons) of cargo;[86] it includes a facility for storing pharmaceuticals.[87]

DHL and Blue Dart Aviation jointly operate a 20,500-square-metre (221,000 sq ft) terminal.[88]

The third cargo terminal is operated by Menzies Aviation Bobba (Bangalore) Pvt. Ltd, a joint venture between Menzies Aviation and Bobba Group (a sales agency for Lufthansa Cargo). The 170,000 sq ft. cargo terminal began operations in May 2008.The terminal has the capacity to handle 280,000 tonnes (310,000 short tons) tons of cargo annually.[89]

BIAL inaugurated a separate cargo village in December 2008. The village is spread over 11 acres (4.5 ha) and includes office space, conference rooms, a cafeteria for staff and parking space for nearly 80 trucks.[86] It did not open for occupation until 2010 and initially suffered low occupancy, which some cargo agents attributed to the opening delay, high rent and limited infrastructure.[90]

Other facilities[edit]

IndiGo Ifly Training Academy[edit]

On 4 September 2019, India's leading airline, IndiGo announced that it will extend its learning academy, ifly to Bangalore, its 2nd such facility in India. The facility will be built in the Airport campus.

Starting 6 September 2019, ifly facilitated training to the airline employees. With over 27,000 employees, there are over 100 instructors in the academy, who conducts workshops on regular basis.

The Ifly learning academy of IndiGo Airlines facilitates special trainings throughout the year to its employees including required skills for job performance, customer services, ramp and marshalling training, safety and emergency procedures, departure control system, communication and leadership training and e-learning to name the few.[91]

IndiGo Maintenance Repair and Overhaul Facility[edit]

IndiGo has its second facility to service their fleet of predominantly Airbus aircraft. The facility, which has a volume of around 218,000 ft.², has capacity for narrow-body aircraft and houses a single bay catering for widebody aircraft.[92] The MRO is completed and is operational since November 2022.[93]

Central Kitchen[edit]

Food services provider SATS proposed to setup their first central kitchen, a 14,000sqm facility with an investment of Rs. 210 crore to cater to the demand in the region. SATS already has a long standing partnership with the airport through its aviation catering associate Taj SATS and ground handling associate AISATS. The facility will be located at the Kempegowda International Airport and is expected to be operational in the year 2022.[94]

Future plans[edit]

The second phase of expansion is underway, which encompasses the construction of a second runway and a passenger terminal in two phases. When fully completed, Kempegowda International Airport will be able to handle 55 million passengers per year.[95][96] The estimated 40 billion (US$560 million) project received clearance from the Ministry of Environment, Forest and Climate Change (MoEFCC) in September 2014.[97][98]

Ground work on the second runway began in February 2016 and the runway opened in December 2019.[97][99] Located south of Terminal 1, it is parallel to runway 09/27 and measures 4,000 by 60 metres (13,120 ft × 200 ft), wider than the original runway so it can accommodate larger aircraft. The new runway is also CAT III certified, allowing for landings in fog and other low visibility conditions.[100]

A second terminal has been constructed to meet the airport's expected growth. This terminal has been designed by Skidmore, Owings & Merrill, and the construction contract has been awarded to Larsen & Toubro. In the first phase, the terminal will cater to 25 million passengers annually, and in the second phase, it will cater another 20 million passengers annually. Terminal 2 was inaugurated in December 2022 and began operations in January 2023.

A third runway, north of the current runway is being planned to cater to the growth of air traffic in the airport which will be situated 1500 meters north of the current runway. Dubbed as the "New North Parallel Runway", the officials hope to ease air traffic congestion with the third runway.[101][102] Along with this, a third passenger terminal has also been proposed for the airport. It is expected to begin construction from 2034 and be completed in the late 2030s.[102]

Airlines and destinations[edit]

Passenger[edit]

AirlinesDestinations
Air Arabia Sharjah[103]
Air France Paris–Charles de Gaulle[104]
Air India[105] Chennai, Delhi, Hyderabad, Mumbai, San Francisco[59][106]
Seasonal: Malé
Air India Express Indore (begins 29 October 2023),[107] Singapore[108]
AirAsia Kuala Lumpur–International[109]
AIX Connect[110] Bagdogra, Bhubaneswar, Chennai, Delhi, Goa–Dabolim, Guwahati, Hyderabad, Jaipur, Kochi, Kolkata, Lucknow,[111] Mumbai, Pune, Ranchi, Srinagar, Surat,[112] Visakhapatnam
Akasa Air[113] Agartala, Ahmedabad, Bagdogra, Bhubaneswar, Delhi, Goa–Mopa, Guwahati, Hyderabad, Kochi, Kolkata, Lucknow, Mumbai, Pune, Varanasi
Alliance Air Goa–Dabolim,[114] Gulbarga, Hyderabad,[115] Kochi, Vidyanagar,[116] Vijayawada[117][118]
Batik Air Malaysia Kuala Lumpur–International[119]
British Airways London–Heathrow[120]
Cathay Pacific Hong Kong[121]
Emirates Dubai–International[122]
Ethiopian Airlines Addis Ababa[123]
Etihad Airways Abu Dhabi[124]
Gulf Air Bahrain[125]
IndiGo Agartala, Agra,[126][127] Ahmedabad, Amritsar, Aurangabad, Bagdogra, Bangkok–Suvarnabhumi,[128] Bareilly,[129][127] Belgaum, Bhopal, Bhubaneswar, Chandigarh, Chennai, Coimbatore, Colombo–Bandaranaike,[130] Dehradun, Delhi, Doha,[131] Dubai–International, Durgapur,[132][127] Goa–Dabolim, Goa–Mopa,[133] Gorakhpur,[134] Guwahati, Hubli, Hyderabad, Imphal, Indore, Jaipur,[135] Jodhpur, Kadapa,[136] Kannur, Kanpur,[137] Kochi, Kolhapur,[138] Kolkata, Kozhikode, Kurnool,[139][127] Lucknow, Madurai, Malé,[140] Mangalore, Mumbai, Nagpur, Patna, Port Blair, Prayagraj, Pune, Raipur, Rajahmundry, Rajkot, Ranchi, Shirdi,[141][127] Shivamogga (begins 31 August 2023),[142] Singapore,[143] Surat, Thiruvananthapuram, Tiruchirappalli, Tirupati, Tuticorin, Udaipur, Vadodara, Varanasi, Vijayawada, Visakhapatnam[144]
Seasonal: Dimapur,[145] Jorhat,[146] Silchar,[147] Srinagar[130]
Japan AirlinesTokyo–Narita[148]
Jazeera Airways Kuwait City[149]
KLM Amsterdam[150]
Kuwait Airways Kuwait City (resumes 29 October 2023)[151]
Lufthansa Frankfurt,[152] Munich (begins 3 November 2023)[153]
Malaysia Airlines Kuala Lumpur–International[154]
Maldivian Malé (begins 30 October 2023)[155]
Nepal Airlines Kathmandu[156]
Oman Air Muscat[157]
Qantas Sydney[158]
Qatar Airways Doha[159]
Saudia Jeddah[160]
Singapore Airlines Singapore[161]
SpiceJet[162] Bagdogra, Coimbatore, Darbhanga, Delhi, Goa–Dabolim, Gwalior,[163] Kolkata,[164] Mumbai (resumes 5 September 2023), Patna (resumes 15 September 2023), Pondicherry (resumes 2 October 2023),[165] Shirdi, Thiruvananthapuram, Visakhapatnam[166]
SriLankan Airlines Colombo–Bandaranaike[167]
Star Air Bidar,[168] Gulbarga, Hubli, Hyderabad, Jamnagar, Pune,[169][170] Tirupati (begins 24 August 2023)[171]
Thai AirAsia Bangkok–Don Mueang[172]
Thai Airways International Bangkok–Suvarnabhumi[173][174]
Thai Lion Air Bangkok–Don Mueang[175]
Virgin Atlantic London–Heathrow (begins 1 April 2024)[176]
Vistara[177] Chandigarh, Dehradun, Delhi, Goa–Dabolim, Guwahati, Hyderabad, Mumbai

Cargo[edit]

AirlinesDestinations
AeroLogic Bangkok–Suvarnabhumi, Frankfurt,[178] Hong Kong, Leipzig/Halle
Amazon Air Coimbatore, Delhi, Hyderabad, Mumbai[179]
Blue Dart Aviation Chennai, Delhi, Kolkata, Mumbai[180]
Cathay Cargo Hong Kong[181]
DHL Aviation Bahrain, Bangkok–Suvarnabhumi, Frankfurt,[3][182] Ho Chi Minh City, Hong Kong, Leipzig/Halle
Ethiopian Airlines Cargo Addis Ababa, Guangzhou, Hong Kong[183]
Etihad Cargo Abu Dhabi[184]
Express Air Cargo Hong Kong, Sharjah, Tunis[185]
FedEx Express Cologne/Bonn, Dubai–International, Guangzhou, Indianapolis, Liège, Los Angeles, Memphis, Paris–Charles de Gaulle[186][187]
IndiGo CarGo Delhi, Durgapur,[188] Kolkata[189]
Lufthansa Cargo Bangkok–Suvarnabhumi, Chengdu–Shuangliu, Chennai,[190] Frankfurt, Hong Kong, Munich, Seoul–Incheon, Sharjah, Tashkent[191]
MASKargo Kuala Lumpur–International[192]
National Airlines Chicago–Rockford, Munich[193]
Qatar Airways Cargo Doha[194]
Quikjet Cargo Chennai, Delhi, Hyderabad, Mumbai[195]
Saudia Cargo Jeddah, Riyadh[196]
Sichuan Airlines Chengdu–Shuangliu, Chongqing[197]
Singapore Airlines Cargo Amsterdam, Sharjah, Singapore[198]
Turkish Airlines Cargo Colombo–Bandaranaike, Dammam, Istanbul–Atatürk[199]
Uni-Top Airlines Kunming, Wuhan[200]
UPS Airlines Cologne/Bonn, Shenzhen[201]
YTO Cargo Airlines Kunming[202]

Statistics[edit]

See source Wikidata query and sources.


Busiest domestic routes from BLR (2021–22) [203]
Rank Airport Carriers Departing passengers
1 Delhi Air India, AIX Connect, Akasa Air, IndiGo, SpiceJet, Vistara 1,117,057
2 Mumbai, Maharashtra Air India, AIX Connect, Akasa Air, IndiGo, Vistara 751,580
3 Kolkata, West Bengal AIX Connect, Akasa Air, IndiGo, SpiceJet 677,476
4 Hyderabad, Telangana Air India, AIX Connect, Akasa Air, Alliance Air, IndiGo, Star Air, Vistara 465,868
5 Kochi, Kerala AIX Connect, Akasa Air, Alliance Air, IndiGo 325,070
6 Goa–Dabolim, Goa AIX Connect, Alliance Air, IndiGo, SpiceJet, Vistara 306,874
7 Ahmedabad, Gujarat Akasa Air, IndiGo 282,428
8 Pune, Maharashtra AIX Connect, Akasa Air, IndiGo, Star Air 282,379
9 Chennai, Tamil Nadu Air India, AIX Connect, IndiGo 278,230
10 Patna, Bihar IndiGo 214,270
Busiest international routes from BLR (2022–2023) [204]
Rank Airport Carriers Departing passengers
1 United Arab Emirates Dubai, United Arab Emirates Emirates, IndiGo 425,923
2 Singapore Singapore Air India Express, IndiGo, Singapore Airlines 188,641
3 Qatar Doha, Qatar IndiGo, Qatar Airways 157,565
4 Thailand Bangkok-Suvarnabhumi, Thailand IndiGo, Thai Airways International 121,454
5 Germany Frankfurt, Germany Lufthansa 121,384
6 Maldives Malé, Maldives Air India, IndiGo 107,826
7 United Arab Emirates Abu Dhabi, United Arab Emirates Etihad Airways 90,027
8 Malaysia Kuala Lumpur, Malaysia AirAsia, Batik Air Malaysia, Malaysia Airlines 86,466
9 France Paris–Charles de Gaulle, France Air France 81,777
10 United Kingdom London–Heathrow, United Kingdom British Airways 71,954

Ground transport[edit]

The trumpet interchange between NH 44 and the road leading from Kempegowda Airport
BMTC Volvo buses connecting the city to the airport

Road[edit]

Kempegowda Airport is connected to the city of Bangalore by National Highway 44 (NH 44). In January 2014, a six-lane flyover was completed over NH 44 between Hebbal and the airport, helping to reduce travel time to and from the city.[205][206] Two alternative routes are under construction and will be completed by March 2017, one through Thanisandra and the other through Hennur.[207] The airport car park is located at ground level and can hold 2,000 vehicles.[17] The airport is served by several taxi and rental car companies.[208] In addition, ride-sharing companies Ola Cabs and Uber have their own pick-up zones outside the terminal.[209][210]

The Bangalore Metropolitan Transport Corporation (BMTC) provides bus transportation to major parts of the city through the Vayu Vajra (Kannada for "Diamond in the Air") service.[211] It is operated using a fleet of Volvo B7RLE buses. In addition, the Karnataka State Road Transport Corporation (KSRTC) operates a nonstop bus service called "Flybus" between Kempegowda Airport and Mysore, as well as a route to Manipal via Mangalore.[212]

Rail[edit]

A halt at the KIA boundary commenced operations in January 2021.[213] The train halt is connected to the airport terminal via short five-minute shuttle busses. Every day five trains from the city towards Devanahalli stop at the KIA halt and five trains head back.[214] Future plans include electrification of the route to introduce comfortable MEMU trains to the airport. MEMU trains from Mysore that terminate at Yelahanka could be extended up to Devanahalli via the KIA halt station, benefitting airport-bound passengers from Mysore, Channapatna, Ramanagaram and Bidadi.[215]

Metro[edit]

The plan to build a metro link between Bangalore and the airport with two stations at the airport was revived in 2020 and is now under construction.[216] In January 2019, Karnataka Government approved the Bangalore Airport Metro line. The project which is envisioned to link Bangalore City with the airport is under Phase 2B of Namma Metro, and is 37 km long. The blue line also known as Line-5 (KR Puram-Hebbal-Kempegowda International Airport) will have 17 stations as an extension of Line-5 (ORR Line) via KR Puram, Nagawara, Hebbal And Yelahanka. The project is estimated to be completed by December 2024.[217]

There are two metro stops being built in the airport campus, one near the upcoming Airport City, which will be partly elevated and the other one in the Multi Modal Transport Hub opposite the upcoming Terminal 2. The cost of building these two stations is estimated to be Rs 800 crore. The total cost of the project is expected to be Rs14,788 Crores.[218]

To ensure last-mile connectivity for passengers, a service road will be provided around the Metro Stations in the Airport premises, for integration with BMTC buses. Plans are to build a 6m wide road.[219]

High Speed Rail Link (HSRL)[edit]

In August 2021, Karnataka Chief Minister Basavaraj Bommai declared plans of building a High Speed Rail Link (HSRL) connecting the airport and the city. If constructed, the airport will be connected by three different railway lines: the Metro, Suburban rail and High-speed rail, making it a distinctive airport connected with all three (modes of transportation).

This is not the first time this is planned. Plans to build an HSRL was earlier planned in 2001 and was revived again in 2013, but was shelved both times due to issues in land acquisition and high costs involved.[220] More recently, the plan has been revived, as the Chief Minister believes that this has been their dream and they are going to get it done as no international airport in the world has got all three (modes of transportation).[220]

Awards[edit]

In 2017, the airport was ranked first in ensuring timely takeoffs and landings to and from the airport, as the Most Punctual Airport of India by the DGCA.[221] In 2020, the airport was recognised as the Best Airport in the Asia-Pacific Region with 25 to 40 million passengers per year by Airports Council International.[222] In December 2022, the airport was not only considered again as the most punctual airport of India, but it was ranked among the most punctual airports in the world, in which it ranked 20th, by Cirium, an aviation data analytics company.[223] In March 2023, the airport was ranked first by the Airport Service Quality (ASQ) Survey for Arrivals, conducted by Airports Council International for 2022, globally.[224]

See also[edit]

References[edit]

  1. "Prem Watsa's Fairfax now owns Bengaluru Airport – Times of India". The Times of India. 30 March 2018. Archived from the original on 8 May 2019. Retrieved 20 February 2019.
  2. url=https://theprint.in/ani-press-releases/bengaluru-based-akasa-air-unveils-new-livery-the-rising-a/785950/
  3. 3.0 3.1 3.2 "DHL Express opens its EUR22 million expanded Bengaluru Gateway to support e-commerce growth". enmobile.prnasia.com. Retrieved 1 February 2022.
  4. "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 22 April 2023.
  5. "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 22 April 2023.
  6. "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 22 April 2023.
  7. "CleanMax Solar to power Chennai Metro – Times of India". The Times of India. Archived from the original on 27 September 2017.
  8. "Kempegowda International Airport" (PDF). Archived from the original (PDF) on 22 September 2017. Retrieved 19 September 2017.
  9. "Top 5 Airports of India by cargo traffic in 2020". 7 September 2020. Archived from the original on 14 June 2021. Retrieved 14 June 2021.
  10. "L&T bags Bengaluru airport contract to build terminal two". Economic Times. 3 October 2018. Retrieved 7 August 2019.
  11. "First flight takes off from second runway at Bengaluru airport". The Hindu. 6 December 2019. Archived from the original on 9 December 2019. Retrieved 9 December 2019.
  12. "PM inaugurates swanky Terminal-2 of Bengaluru airport". The New Indian Express. 11 November 2022. Retrieved 13 November 2022.
  13. 13.0 13.1 13.2 "All international flights from Bengaluru airport will move to Terminal 2 from September 1". The Times of India. 9 June 2023. Retrieved 13 June 2023.
  14. "Bangalore Airport History". Retrieved 5 January 2022.
  15. "Royal Nepal Airlines to Bangalore". Archived from the original on 13 July 2021. Retrieved 5 January 2022.
  16. "The History And rise of Bangalore Airport". 19 July 2020. Retrieved 5 January 2022.
  17. 17.0 17.1 "Bangalore International Airport, India". Airport Technology. Archived from the original on 15 March 2016. Retrieved 9 March 2016.
  18. "Hard times ahead for city airport authorities". The Hindu. 31 October 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  19. 19.0 19.1 David, Stephen (31 January 1997). "Grounded by politics". India Today. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
  20. "Cover Story: Bangalore". India Today. 7 November 2005. Archived from the original on 1 October 2009. Retrieved 30 March 2016.
  21. 21.0 21.1 "Airport Projects: Bangalore International Airport". Infrastructure Development Department, Government of Karnataka. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
  22. 22.0 22.1 22.2 "Bangalore Airport History". Retrieved 6 January 2022.
  23. Chakravarti, Sudeep (20 July 1998). "This flight is delayed". India Today. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
  24. D. S., Madhumathi (9 January 2001). "Hunt for Devanahalli airport partners begins". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  25. "Siemens team wins bid to build international airport in Bangalore: Reuters". Rediff. 1 November 2001. Archived from the original on 24 October 2012. Retrieved 22 July 2015.
  26. "Devanahalli airport work has begun". The Hindu. 7 May 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  27. Ramanathan, Ramesh (11 February 2008). "Grounded at the word go". Live Mint. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
  28. D. S., Madhumathi (18 March 2004). "Ministry clears Bangalore airport project – BIAL seeks review of draft version of concession pact". The Hindu Business Line. Archived from the original on 13 September 2005. Retrieved 9 March 2016.
  29. "Concession agreement for airport signed". The Hindu. 5 July 2004. Archived from the original on 16 February 2005. Retrieved 9 March 2016.
  30. "All clear now for new Bangalore airport". The Hindu. 15 June 2004. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
  31. "Bangalore airport work to begin on July 2". The Hindu Business Line. 27 June 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  32. "Siemens bags another order for Bangalore airport". Oneindia. 27 July 2006. Archived from the original on 10 April 2016. Retrieved 10 April 2016.
  33. "BIAL plans rail link between Devanahalli airport and city". The Hindu. 21 May 2006. Archived from the original on 10 April 2016. Retrieved 10 April 2016.
  34. D. S., Madhumathi (23 October 2007). "Bangalore international airport launch set for March 30". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  35. "BIAL relents, sets May 11 as new date for airport opening". Oneindia. 13 March 2008. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
  36. Urvashi, Jha (2008). "Bengaluru airport wait gets longer". mydigitalfc.com. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
  37. "Slow take-off for airport stir". Gulf News. 13 March 2008. Archived from the original on 4 March 2016. Retrieved 30 March 2016.
  38. Raghu, K. (17 May 2008). "Citizen's body protests closure of old Bangalore airport". Live Mint. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
  39. Vaswani, Karishma (16 May 2008). "Battle over new Bangalore airport". BBC News. Archived from the original on 21 May 2008. Retrieved 30 March 2016.
  40. Nanjappa, Vicky (23 May 2008). "Decks cleared for new Bangalore airport". Rediff. Archived from the original on 24 September 2008. Retrieved 30 March 2016.
  41. Nanjappa, Vicky (24 May 2008). "Bangalore airport takes wings". Rediff. Archived from the original on 20 September 2008. Retrieved 9 March 2016.
  42. "India's airport sector vibrant, with tenders for six PPP concessions: CAPA Mumbai Summit, 3/4 Feb". CAPA – Centre for Aviation. 20 January 2015. Archived from the original on 15 April 2015. Retrieved 9 April 2016.
  43. "Bangalore's new airport almost ready for use". anna.aero. 16 May 2008. Archived from the original on 30 July 2010. Retrieved 30 March 2016.
  44. "Karnataka govt proposes renaming Bengaluru International Airport". Times of India. 27 February 2009. Archived from the original on 3 April 2016. Retrieved 14 March 2016.
  45. 45.0 45.1 "Bangalore airport named after city founder Kempe Gowda". Business Standard. 17 July 2013. Archived from the original on 5 March 2016. Retrieved 14 March 2016.
  46. "Centre accepts proposal to name Bengaluru International Airport after Kempegowda". The Economic Times. 6 April 2012. Archived from the original on 26 January 2013. Retrieved 14 March 2016.
  47. "Bangalore International Airport Ltd will be Kempegowda International Airport from December 14". The Economic Times. 24 November 2013. Archived from the original on 15 March 2016. Retrieved 14 March 2016.
  48. Sukumaran, Ajay (12 July 2013). "Bangalore Airport looks to woo domestic airlines to set up hub". Indian Express. Archived from the original on 3 April 2016. Retrieved 31 March 2016.
  49. Dhamija, Anshul; Kurian, Boby (21 January 2014). "Air Pegasus 3rd airline to take off from Bangalore". Times of India. Archived from the original on 21 January 2016. Retrieved 31 March 2016.
  50. "AirAsia launches India ops from Bangalore". The Hindu. 12 June 2014. Archived from the original on 5 January 2016. Retrieved 31 March 2016.
  51. "Work on Bangalore International Airport expansion set to begin in June". Daily News and Analysis. 24 May 2011. Archived from the original on 3 April 2016. Retrieved 12 March 2016.
  52. 52.0 52.1 G., Chandrashekar (15 December 2013). "New terminal inaugurated at airport". Deccan Chronicle. Archived from the original on 8 March 2016. Retrieved 11 October 2015.
  53. 53.0 53.1 "BIA Terminal 1 Expansion Capacity, Design And Construction Update 2012-05-07". Kempegowda International Airport Bengaluru. 7 May 2012. Archived from the original on 30 June 2015. Retrieved 11 October 2015.
  54. 54.0 54.1 "Master plan to develop airport real estate". The Hindu. 14 December 2013. Archived from the original on 19 December 2013. Retrieved 13 March 2016.
  55. 55.0 55.1 Acharjee, Sonali (16 December 2013). "Bangalore unveils its new international airport terminal". India Today. Archived from the original on 22 December 2015. Retrieved 11 October 2015.
  56. Special Correspondent (8 April 2022). "Qantas announces direct flights from Sydney-Bengaluru". The Hindu. ISSN 0971-751X. Retrieved 6 July 2022.
  57. Sinha, Saurabh (9 April 2022). "Qantas to start Bengaluru-Sydney nonstop flights from September 14". The Times of India. Retrieved 6 July 2022.
  58. Prasad, Sanath (22 October 2022). "Bengaluru's Nikhil and Sandeep who piloted Emirates A380 on cloud nine after historic flight to city". The Indian Express. Retrieved 8 November 2022.
  59. 59.0 59.1 Sinha, Saurabh (2 December 2022). "Silicon Vallies linked: Air India resumes nonstop between Bengaluru & San Francisco from today". The Times of India. Retrieved 2 December 2022.
  60. "Air India to induct 30 planes over next 15 months". The Hindu. 12 September 2022. Archived from the original on 2 October 2022. Retrieved 24 October 2022.
  61. Sundarajan, Priya (11 January 2018). "GVK to sell 10% stake in Bengaluru airport to Fairfax for ₹1,290". Business Line. Retrieved 21 April 2022.
  62. "Zurich Airport sells 5% stake in Bangalore airport to Fairfax for $48.9 mn". The Hindu Business Line. 18 April 2016. Archived from the original on 19 April 2016. Retrieved 3 June 2016.
  63. "GVK exits B'luru airport, sells residual 10% stake to Fairfax". www.freepressjournal.in. Retrieved 5 January 2022.
  64. "FAIRFAX INDIA HOLDINGS CORPORATION" (PDF). Archived (PDF) from the original on 26 December 2019. Retrieved 21 November 2019.
  65. "Government to exit Hyderabad & Bengaluru JV airports". The Times of India. 21 September 2021. Retrieved 27 November 2021.
  66. "VOBL – Kempegowda Int/ Bengaluru Airport". SkyVector. 26 May 2016. Archived from the original on 25 June 2016. Retrieved 3 June 2016.
  67. "Technical Information". Airports Authority of India. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
  68. Taneja, Kabir (4 March 2012). "Bangalore airport to close down for repairs". Sunday Guardian. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
  69. "No flights at BIA for 7 hrs from today". Times of India. 11 March 2012. Archived from the original on 31 March 2015. Retrieved 12 March 2016.
  70. Badrinath, Raghuvir (6 March 2012). "Bangalore airport turns the heat on L&T over runway". Business Standard. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
  71. "First flight takes off from second runway of KIA". Deccan Herald. 6 December 2019. Archived from the original on 7 December 2019. Retrieved 14 December 2019.
  72. "KIA begins work on 2nd runway; to be linked to Terminal 2 apron". Deccan Herald. November 2016. Archived from the original on 18 January 2017. Retrieved 17 March 2017.
  73. "Closed Kempegowda International Airport runway to begin operations by March-end". The New Indian Express. 8 February 2021. Archived from the original on 25 February 2021. Retrieved 6 April 2021.
  74. "Bengaluru: Kempegowda International Airport gets parallel runways, first in south India". The Times of India. 26 March 2021. Archived from the original on 27 March 2021. Retrieved 6 April 2021.
  75. "Information on New Boarding Gates Numbering". Kempegowda International Airport Bengaluru.
  76. "Bangalore airport named after city founder Kempegowda". NDTV. 15 December 2013. Archived from the original on 19 March 2016. Retrieved 15 March 2016.
  77. Prakash, Rakesh (10 November 2014). "Sri Lankan PM traveled like any ordinary flier, in all humility". Bangalore Mirror. Archived from the original on 28 January 2016. Retrieved 31 March 2016.
  78. Arora, Vijay (19 February 2021). "Bengaluru Airport: Both Runways To Become Operational From March 25". Z Travel News Worldwide. Retrieved 10 March 2021.[permanent dead link]
  79. "Bengaluru airport unveils '080 Lounge' at terminal one". 9 June 2022. Retrieved 15 September 2022.
  80. "Bengaluru's Kempegowda International Airport gets SWANKY new Terminal 2: All you need to KNOW - Design, Features, Capacity". Zee News. Retrieved 10 November 2022.
  81. "KIA's garden-themed Terminal-2 massive in size". Deccan Herald. 15 January 2018. Retrieved 10 November 2022.
  82. "Pandemic delays completion of Bengaluru airport's Terminal II". The Indian Express. 17 September 2021. Retrieved 10 November 2022.
  83. "Bengaluru airport's Terminal 2 to begin domestic operations on January 15". Indian Express. 10 January 2023. Retrieved 11 January 2023.
  84. Kulkarni, Mahesh (19 August 2008). "Fuel deals: Indian Oil JV eyes Mumbai, Delhi airports". Rediff. Archived from the original on 15 April 2011. Retrieved 12 March 2016.
  85. "IOC does its groundwork for Devanahalli airport". The Hindu. 15 October 2008. Archived from the original on 3 April 2016. Retrieved 12 March 2016.
  86. 86.0 86.1 "Cargo village takes off at B'lore airport". Business Standard. 10 December 2008. Archived from the original on 3 April 2016. Retrieved 31 March 2016.
  87. "Menzies opens pharma cold zone in Bangalore". Air Cargo World. 25 August 2014. Archived from the original on 26 March 2015. Retrieved 12 March 2016.
  88. Agarwal, Devesh (21 November 2008). "DHL and Blue Dart open integrated terminal at Bangalore airport". Bangalore Aviation. Archived from the original on 12 April 2016. Retrieved 31 March 2016.
  89. "Mezies Aviation Cargo". Retrieved 23 November 2022.
  90. "Cargo Village at BIA is still half full". Deccan Herald. 28 November 2010. Archived from the original on 19 February 2011. Retrieved 31 March 2016.
  91. "IndiGo launches second iFLY facility in Bengaluru". 4 September 2019. Retrieved 26 February 2022.
  92. "IndiGo Expands Maintenance Capabilities To Bangalore". 26 July 2022. Retrieved 15 September 2022.
  93. "IndiGo inaugurates second MRO facility at Bengaluru airport". The Economic Times. 23 November 2022. Retrieved 25 November 2022.
  94. "SATS to establish Rs 210 cr central kitchen in India at Bengaluru airport". Business Standard. 26 July 2021.
  95. "India's Bengaluru airport to construct second terminal and runway in 2016". Airport Technology. Archived from the original on 22 January 2016. Retrieved 22 January 2016.
  96. "Bengaluru airport T2 phase-1 by 2021, will handle 20 mn more flyers". Business Standard. 19 January 2016. Archived from the original on 26 January 2016. Retrieved 21 January 2016.
  97. 97.0 97.1 Peter, Petlee (5 April 2016). "Work on Terminal 2 at KIA begins". The Hindu. Archived from the original on 21 December 2016. Retrieved 8 April 2016.
  98. "Clearance for Airport Expansion". New Indian Express. 5 September 2014. Archived from the original on 20 March 2016. Retrieved 15 March 2016.
  99. CS, Hemant (28 October 2017). "Larsen and Tubro to fast-track runway work at the Kempegowda International Airport". Bangalore Mirror. Archived from the original on 2 January 2018.
  100. "BIAL moves forward on second runway. Target completion in two years". Bangalore Aviation. 21 January 2016. Archived from the original on 29 January 2016. Retrieved 24 January 2016.
  101. Kappan, Rasheed (2 November 2017). "With eye on future growth, KIA plans third runway". deccanherald.com. Archived from the original on 23 October 2018. Retrieved 23 October 2018.
  102. 102.0 102.1 "Bangalore Airport to not get Terminal 3 before 10 years". Times Now. 22 November 2022. Retrieved 25 November 2022.
  103. "Flights from Bangalore". Air Arabia. Retrieved 6 December 2021.
  104. "Air France schedule". Air France. Paris: Air France-KLM. Retrieved 6 December 2021.
  105. "Air India Route Map". Retrieved 18 April 2023.
  106. "Air India International Schedule". Retrieved 18 April 2022.
  107. "Air India Express will operate new flights from Indore to Mumbai-Bengaluru in winter schedule". 17 August 2023. Retrieved 18 August 2023.
  108. "DGCA International schedule".
  109. Bodell, Luke (7 April 2022). "AirAsia Signals Return Of India To Malaysia & Thailand Flights". Simple Flying. Retrieved 19 June 2022.
  110. "AIX Connect Route Map". Retrieved 18 April 2023.
  111. "AirAsia India begins flights to Lucknow". The Times of India. 6 August 2022. Retrieved 13 August 2022.
  112. "AIX Connect Announces 21 Weekly Flights From Surat". 13 January 2023.
  113. "Akasa Air Flight Network". Akasa Air. Retrieved 30 June 2023.
  114. Alliance Air (U/O) [@AllianceAir] (17 November 2021). "Alliance Air starting daily direct flights from Bengaluru to Goa effective 26th November 2021" (Tweet). Retrieved 8 December 2021 – via Twitter.
  115. "Alliance Air to Commence Daily Flights Between Bengaluru and Hyderabad". Archived from the original on 9 July 2021. Retrieved 5 July 2021.
  116. Narayan, Subhash (30 October 2022). "Jindal Vijayanagar Airport hosts Alliance Air's new flights to Hyd, Bengaluru". Livemint. Retrieved 1 November 2022.
  117. "Alliance Air daily flights from Dec.1". The Hindu. 12 November 2021. Retrieved 8 December 2021.
  118. "Alliance Air Network and Schedule". Alliance Air. Retrieved 7 March 2023.
  119. "Batik Air Malaysia 3Q 2022 India restorations".
  120. "Flights to Bangalore (BLR) | Book now with British Airways". Archived from the original on 27 September 2016.
  121. Indiablooms. "Cathay Pacific to commence direct flights from Bengaluru to Hong Kong | Indiablooms - First Portal on Digital News Management". Indiablooms. Retrieved 7 June 2023.
  122. "Flights to Bengaluru (BLR)". Dubai: The Emirates Group.
  123. "Ethiopian Airlines Schedule to BLR". Ethiopian Airlines. Retrieved 11 March 2022.
  124. "Etihad Destinations". Abu Dhabi: Etihad Airways. Retrieved 6 December 2021.
  125. "Gulf Air schedule". Retrieved 18 March 2022.
  126. "Direct Flights Information, Status & Schedule | IndiGo". www.goindigo.in. Archived from the original on 14 January 2021. Retrieved 12 January 2021.
  127. 127.0 127.1 127.2 127.3 127.4 "New Flight Status And Schedule-Indigo". Archived from the original on 31 March 2019. Retrieved 25 March 2021.
  128. "Bengaluru-Thailand flights resumes". Retrieved 26 July 2022.
  129. "IndiGo to begin Bareilly to Mumbai, Bengaluru flights from April 29". Busine s Today. 4 March 2021. Archived from the original on 4 March 2021. Retrieved 4 March 2021.
  130. 130.0 130.1 "Flight Schedule". IndiGo. Retrieved 20 April 2023.
  131. "Qatar Airways and IndiGo reactivate strategic cooperation". Retrieved 21 April 2022.
  132. "Indigo to operate 22 new domestic flights from 28 March". www.livemint.com. Archived from the original on 12 April 2021. Retrieved 11 February 2021.
  133. "IndiGo's largest ever new station launch at New Goa International Airport". IndiGo. 9 December 2022. Retrieved 10 December 2022.
  134. "direct flight to Bangalore will start again from today". Hindustan. Retrieved 18 March 2021.
  135. "New Flights Information, Status & Schedule | IndiGo". www.goindigo.in. Retrieved 8 March 2022.
  136. "IndiGo to start flights between Kadapa & five cities from March 27 onwards". The Economic Times. Retrieved 24 February 2022.
  137. "IndiGo to start flights connecting Kanpur from October 31". Business Standard India. Press Trust of India. 29 September 2021. Archived from the original on 29 September 2021. Retrieved 29 September 2021.
  138. कोल्हापूर विमानतळ Kolhapur Airport [@aaikolhaairport] (8 December 2022). "IndiGo to start BLR-KLH-BLR flights wef 13/01/2023" (Tweet). Retrieved 10 December 2022 – via Twitter.
  139. Susarla, Ramesh (30 January 2021). "IndiGo flights from Kurnool to begin on March 28". The Hindu. Archived from the original on 30 January 2021. Retrieved 30 January 2021.
  140. "India-Maldives flights to resume from July 15". The Times of India. Retrieved 8 November 2021.
  141. "Indigo to operate 22 new domestic flights from 28 March". www.livemint.com. 11 February 2021. Archived from the original on 11 February 2021. Retrieved 11 February 2021.
  142. "INDIGO 2H23 DOMESTIC NETWORK ADDITIONS". Aeroroutes. Retrieved 17 August 2023.
  143. "IndiGo to resume Bangalore-Singapore service from Mar-2022". Retrieved 13 February 2022.
  144. "Indigo resumes flights to Singapore". Retrieved 6 December 2021.
  145. "New Flights". IndiGo. Retrieved 20 February 2022.
  146. "Bangalore-Jorhat direct flights". www.thehindubusinessline.com.
  147. "Indigo begins Bangalore-Silchar Direct flights". 15 February 2021. Archived from the original on 7 November 2021. Retrieved 6 April 2021.
  148. "JAL schedule". Retrieved 27 January 2022.
  149. "Jazeera Airways Starts Direct Flights Between Bengaluru To Kuwait From Nov 3. Travellers, Rejoice!". 3 November 2022. Retrieved 3 November 2022.
  150. "KLM to resume flight services on Bengaluru-Amsterdam route from May 25". Retrieved 14 April 2022.
  151. "Kuwait Airways Schedules Barcelona / Washington NW23 Launch". Aeroroutes. 8 August 2023. Retrieved 10 August 2023.
  152. "Lufthansa Schedule and Flight Status". Cologne: Lufthansa Group. Retrieved 25 December 2021.
  153. "Lufthansa: New long-haul destinations in the winter". 27 April 2023. Retrieved 27 April 2023.
  154. "Malaysia Airlines Announced Resumption of Schedule Operations Between India And Malaysia Effective March 27". 21 March 2022. Retrieved 20 April 2022.
  155. "Maldivian Announces Inaugural Flights to Bangalore, India". Corporate Maldives. 16 August 2023. Retrieved 16 August 2023.
  156. Nepal Airlines [@NepalAirlinesRA] (10 March 2022). "Resumption of KTM-BLR-KTM" (Tweet). Retrieved 10 March 2022 – via Twitter.
  157. "Flight Resumption from Muscat". Oman Air. Retrieved 6 December 2021.
  158. "Qantas launches Bengaluru-Sydney flight, first direct flight to connect South India to Australia". The Economic Times. 14 September 2022. Retrieved 14 September 2022.
  159. "Qatar Airways Schedule". Retrieved 31 March 2022.
  160. "Saudia Network". Retrieved 2 May 2022.
  161. "Singapore Airlines to resume services across India". www.thehindubusinessline.com. 29 November 2021.
  162. "SpiceJet Flight Schedule". SpiceJet. Retrieved 9 July 2023.
  163. @Nashik_Airport (28 July 2022). "SpiceJet proposes daily flights to bangalore" (Tweet) – via Twitter.
  164. "List of SpiceJet Flights from Kolkata for 2023". SpiceJet. Retrieved 25 June 2023.
  165. "Schedule–Bengaluru to Pondicherry". SpiceJet. Retrieved 10 August 2023.
  166. "SpiceJet Flight Schedule". SpiceJet. Retrieved 1 August 2023.
  167. "SriLankan Airlines resumes regular flights to and from India". Retrieved 8 November 2021.
  168. Star Air [@OfficialStarAir] (25 May 2022). "Star Air to begin Bangalore-Bidar flights" (Tweet). Retrieved 25 May 2022 – via Twitter.
  169. "Star Air starts flights from Pune to Hyderabad via Bengaluru". The Indian Express. 27 July 2023. Retrieved 10 August 2023.
  170. "Flight Schedule". Star Air. Retrieved 1 December 2021.
  171. "STAR AIR 3Q23 DOMESTIC NETWORK ADDITIONS". Aeroroutes. Retrieved 16 August 2023.
  172. "AirAsia Resumes Flights to Seven Countries on 18 Routes this April! Fly Easy with No Quarantine". 14 March 2022. Retrieved 26 March 2022.
  173. "Thai Airways International Routes Start To Return". 17 October 2021. Retrieved 21 January 2022.
  174. "TIMETABLE". Thai Airways International. Retrieved 24 February 2022.
  175. "THAI LION AIR ADDS BANGALORE SERVICE FROM APRIL 2023". AeroRoutes. 21 March 2023.
  176. "Virgin Atlantic to start daily flights from UK to Bengaluru from next year". The Indian Express. 5 June 2023. Retrieved 5 June 2023.
  177. "Vistara Flight Schedule". Retrieved 1 August 2023.
  178. "DHL Express adds Boeing 777 link from India to Germany". Post & Parcel. 13 October 2011. Archived from the original on 27 March 2016. Retrieved 17 March 2016.
  179. Staff writers (23 January 2023). "Amazon Air takes off in India". Amazon. Retrieved 18 February 2023.
  180. "Blue Dart Aviation (BZ) flights from Bengaluru (BLR)". FlightMapper. Retrieved 17 March 2016.
  181. Chandramouly, Anjana (4 August 2011). "Cathay Pacific Cargo to add more ports in India". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 17 March 2016.
  182. "D0690 Flight History". Retrieved 2 February 2022.
  183. "Ethiopian Airlines starts cargo operation to Bengaluru". Business Standard. 14 December 2015. Archived from the original on 24 March 2016. Retrieved 17 March 2016.
  184. "Starting this month, Etihad Cargo is offering new weekly freighter services from Abu Dhabi (AUH) to Johannesburg (JNB) and Bangalore (BLR)". 6 March 2018. Retrieved 1 February 2022.
  185. "Express Air Cargo to operate cargo service to Hong Kong, Sharjah and Bangalore every Saturday and Tuesday from Tunis". Express Air Cargo. 23 February 2023. Retrieved 25 February 2023.
  186. "Bangalore is FedEx's global hub for South". The Hindu Business Line. 12 August 2010. Archived from the original on 3 April 2016. Retrieved 17 March 2016.
  187. "FedEx launches direct cargo flight from Bangalore to Europe, US". 12 August 2010. Archived from the original on 4 November 2021. Retrieved 7 November 2021.
  188. Pal, Satyen (31 July 2023). "Andal Cargo terminal: কাজি নজরুল ইসলাম বিমানবন্দরে নয়া কার্গো টার্মিনাল, রুটগুলি জেনে নিন". Hindustan Times (in Bengali). Retrieved 1 August 2023.
  189. "IndiGo CarGo begins Cargo flights to Bangalore".
  190. "LH 8472". Retrieved 18 January 2022.
  191. "LH Cargo Flights from BLR". Retrieved 1 February 2022.
  192. "MASkargo adds Bangalore to its cargo network". The Star Online. 22 May 2015. Archived from the original on 13 May 2016. Retrieved 17 March 2016.
  193. "Connecting BLR with EU, US". Retrieved 6 January 2022.
  194. "Qatar Airways Cargo Schedule". Retrieved 1 February 2022.
  195. "QuikJet Cargo's inaugural flight touches down at KIAB, Bengaluru". The Stat Trade Times. 17 February 2016. Archived from the original on 20 December 2016. Retrieved 17 March 2016.
  196. "Sauda Cargo network". Archived from the original on 16 July 2022. Retrieved 1 February 2022.
  197. "Sichuan Airlines Begin Cargo Service To Bangalore". 29 March 2021. Archived from the original on 1 April 2021. Retrieved 7 April 2021.
  198. "Singapore Airlines Cargo Flight Schedules". Singapore Airlines Cargo.
  199. "Kempegowda International Airport will link to seven more cities". The New Indian Express. 29 October 1947. Archived from the original on 30 October 2018. Retrieved 29 October 2018.
  200. "All-cargo direct flight opens, linking Kunming - Bangalore- Wuhan". Archived from the original on 11 August 2020. Retrieved 26 March 2021.
  201. "UPS launches Bangalore services and opens second facility in India". Retrieved 20 July 2022.
  202. "Flight history for YTO Cargo Airlines flight YG9161". Retrieved 1 February 2022.
  203. "Domestic Air Transport: Statistics for 2021-22". Retrieved 22 August 2023.
  204. "International Air Transport: Statistics for Q1 2023". Retrieved 18 May 2023.
  205. "Hebbal to Kempegowda International Airport in 20 minutes". The Times of India. 30 January 2014. Archived from the original on 8 July 2015. Retrieved 13 March 2016.
  206. "Drive to airport to be smoother by month-end". The Hindu. 2 January 2014. Archived from the original on 18 April 2014. Retrieved 10 March 2016.
  207. "Two alternate roads from the east to the airport by March 2017". The Hindu. 18 October 2016. Archived from the original on 7 November 2021. Retrieved 18 October 2016.
  208. "Driving to and from the Airport". Bengaluru Airport. Archived from the original on 13 March 2016. Retrieved 13 March 2016.
  209. Urs, Anil (19 May 2016). "Ola signs pact with Kempegowda international airport". The Hindu Business Line. Archived from the original on 20 March 2018. Retrieved 20 May 2016.
  210. Ray, Aparajita (25 May 2016). "Uber too, gets space at Bengaluru international airport". The Times of India. Archived from the original on 14 August 2016. Retrieved 25 May 2016.
  211. "Vayu Vajra bleeds BMTC of Rs 5 lakh a day". Bangalore Mirror. 3 November 2008. Archived from the original on 3 April 2016. Retrieved 13 March 2016.
  212. Sastry, Anil Kumar (17 August 2015). "KSRTC to operate Flybus between Manipal and KIA". The Hindu. Archived from the original on 17 December 2016. Retrieved 12 March 2016.
  213. "Bengaluru-Kempegowda airport suburban train to finally start from Monday". The News Minute. 3 January 2021. Archived from the original on 3 January 2021. Retrieved 3 January 2021.
  214. "Trains between Bengaluru city and Kempegowda International Airport: All you need to know | Explained News,The Indian Express". 5 January 2021. Archived from the original on 25 January 2021. Retrieved 12 February 2021.
  215. "KIA Halt Station: Airport train, finally on track". Deccan Herald. 17 January 2020. Archived from the original on 27 February 2020. Retrieved 24 January 2020.
  216. "BMRCL will spend Rs 800 crore for infra for two Metro stations to airport, line will be ready by December 2024". The New Indian Express. 12 October 2021. Retrieved 8 November 2021.
  217. "Bangalore airport to Bangalore city Airport project". Retrieved 27 November 2021.
  218. "BMRCL will spend Rs 800 crore for infra for two Metro stations to airport, line will be ready by December 2024". Retrieved 27 November 2021.
  219. Philip, Christin Mathew (25 January 2022). "Finally,Namma Metro work on ORR-KIA line gains pace". The Times of India. Retrieved 25 January 2022.
  220. 220.0 220.1 "Plans on to build high-speed rail link between Bengaluru city and airport: Basavaraj Bommai". 30 August 2021. Retrieved 27 November 2021.
  221. Moharkan, Furquan (31 October 2017). "Bengaluru airport is country's most punctual one, reveals DGCA data". Deccan Herald. Retrieved 7 March 2023.
  222. "2020 - Best Airport by Size and Region". ACI World. Archived from the original on 1 March 2021. Retrieved 3 March 2021.
  223. Thadhagath, Venkata Pathi (28 December 2022). "Bengaluru and Hyderabad airports among most punctual airports in the world". The Hindustan Times. Retrieved 7 March 2023.
  224. "KIA named best airport by ACI's ASQ Arrival Survey Globally for 2022". The Hindu. 7 March 2023. Retrieved 7 March 2023.

External links[edit]

Information red.svg
Scan the QR code to donate via UPI
Dear reader, We kindly request your support in maintaining the independence of Bharatpedia. As a non-profit organization, we rely heavily on small donations to sustain our operations and provide free access to reliable information to the world. We would greatly appreciate it if you could take a moment to consider donating to our cause, as it would greatly aid us in our mission. Your contribution would demonstrate the importance of reliable and trustworthy knowledge to you and the world. Thank you.

Please select an option below or scan the QR code to donate
₹150 ₹500 ₹1,000 ₹2,000 ₹5,000 ₹10,000 Other