Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Ahmedabad–Dholera Expressway
अहमदाबाद–धोलेरा एक्सप्रेसवे
Route information
Maintained by National Highways Authority of India (NHAI)
Length109 km (68 mi)
ExistedMarch 2023 (expected)–present
Major junctions
North endSarkhej, Ahmedabad
South endAdhelai, Bhavnagar
Location
StatesGujarat
Major citiesAhmedabad and Bhavnagar
Highway system

Ahmedabad–Dholera Expressway[1] is a 109 km (68 mi) long, four-lane wide (expandable to eight) access-controlled under-construction expressway in Gujarat, India. It will connect Sardar Patel Ring Road near Sarkhej in Ahmedabad with Adhelai village in Bhavnagar district via Dholera Special Investment Region (DSIR). The proposed Dholera International Airport near Navagam, about 20 km (12 mi) from Dholera SIR will also lie in the route.

The Ahmedabad–Dholera greenfield expressway is a part of the Delhi–Mumbai Industrial Corridor (DMIC) and is expected to be ready by March 2023.[2]

Construction[edit]

The NHAI has divided the construction work of Ahmedabad–Dholera Expressway into four packages. Its total construction cost (excluding the cost of land) is about 3,196 crores.

The list of contractors is as follows:

Sr. No Package Length in km Contractor
1. Sarkhej (Ahmedabad)–Sindhrej (Ahmedabad) 22.0 Sadbhav Engineering
2. Sindhrej (Ahmedabad)–Vejalaka (Ahmedabad) 26.5 Sadbhav Engineering
3. Vejalaka (Ahmedabad)–Dholera SIR (Ahmedabad) 22.5 GHV India
4. Dholera SIR (Ahmedabad)–Adhelai (Bhavnagar) 38.0 DRA Infracon

Status updates[edit]

References[edit]

  1. "Ahmedabad–Dholera Expressway gets green signal, Tenders issued". The Times of India. 1 January 2019.
  2. "23 new Expressways and Highways coming up in next 5 years". The Times of India. 13 August 2020.
  3. "NHAI floats tenders for Ahmedabad–Dholera greenfield alignment". Construction Week Online. 8 April 2020.
  4. "Sadbhav declared lowest bidder for two highway projects worth Rs 1,572 crores". Business Standard. 13 August 2020.